Skip to main content

We Connect Asia

Project Brief – Website Integration for WeConnect Asia

Group of colleagues engaged in a creative brainstorming session at an urban office space.

Project Overview

WeConnect Asia is a boutique consulting firm that helps international CleanTech and Renewable Energy companies scale across Southeast Asia through market expansion, project financing, and local setup support.

We have already completed:
– All website content (in English)
– Full sitemap and SEO metadata
– CTA strategy and copy
– Templates and case studies

We now need a reliable and detail-oriented web integrator to build the site and apply all elements properly.

Scope of Work

You will be responsible for:
– Creating and structuring the pages according to the sitemap
– Copy/pasting and formatting the final content provided (Google Docs / Word)
– Implementing SEO best practices (title, H1, meta description, slugs)
– Inserting and linking CTA buttons (Calendly/Cal.com, Downloads, etc.)
– Ensuring proper internal linking (between services, case studies, blog, etc.)
– Uploading downloadable files (PDFs, templates) if any
– Ensuring responsive design (desktop / tablet / mobile)
– Final quality check on layout, navigation, and broken links

Close-up of a laptop with code on the screen, perfect for illustrating programming concepts.
A person analyzes financial charts and graphs at a desk, indicating business trading activity.

Deliverables

– Fully structured and content-filled website (desktop/mobile)
– SEO fields and tags integrated
– All CTAs active and linked
– Blog, Podcast and Resource sections created
– Page-by-page progress updated in tracker (Excel file provided)
– One round of revision post-integration

Tech Stack & Platform

Please confirm in your reply:
– Your preferred platform (WordPress, w/ elementor, other)


The site must be fast, easy to manage, and SEO-friendly.

laptop, wordpress, wordpress design, smartphone, work station, notebook, coffee, computer, website, mobile, business, phone, brown business, brown computer, brown coffee, brown laptop, brown work, brown phone, brown mobile, brown website, brown design, brown company, brown smartphone, brown telephone, laptop, wordpress, website, website, website, website, website
startup, business, people, students, office, strategy, work, technology, company, corporate, communication, young, plan, marketing, computer, design, professional, planning, internet, project, laptop, presentation, web, display, monitor, business, business, business, office, office, office, office, office, work, work, work, technology, technology, marketing, marketing, marketing, computer, computer, computer, computer, laptop

What We Provide

– Final content (14+ pages)
– SEO Master File (H1, slug, meta)
– Page-by-page integration tracker (Excel)
– CTA locations + links
– PDF resources to upload if any
– Visual examples (optional)

What We Expect

Please confirm in your reply:
– Your preferred platform (WordPress, w/ elementor, other)


The site must be fast, easy to manage, and SEO-friendly.

Two people collaboratively planning on a whiteboard with creative strategy.
Group of colleagues in a meeting discussing future projections with focus on teamwork and collaboration.

Timeline

Kick-off: As soon as confirmed
1st delivery: within 7–10 days
Final delivery: within 14 days including 1 revision loop

To Apply

Please include in your message:
– Examples of similar websites you’ve built
– Your preferred CMS (Webflow, WordPress, etc.)
– Confirmation that you can work with our documents (Excel, Google Docs)
– Your rate for the full integration project (not hourly)

We look forward to collaborating with you to bring this project to life!

Modern desk setup with neon lighting and a desktop computer displaying colorful images.