Project Brief – Website Integration for WeConnect Asia
Project Overview
WeConnect Asia is a boutique consulting firm that helps international CleanTech and Renewable Energy companies scale across Southeast Asia through market expansion, project financing, and local setup support.
We have already completed:
– All website content (in English)
– Full sitemap and SEO metadata
– CTA strategy and copy
– Templates and case studies
We now need a reliable and detail-oriented web integrator to build the site and apply all elements properly.
Scope of Work
You will be responsible for:
– Creating and structuring the pages according to the sitemap
– Copy/pasting and formatting the final content provided (Google Docs / Word)
– Implementing SEO best practices (title, H1, meta description, slugs)
– Inserting and linking CTA buttons (Calendly/Cal.com, Downloads, etc.)
– Ensuring proper internal linking (between services, case studies, blog, etc.)
– Uploading downloadable files (PDFs, templates) if any
– Ensuring responsive design (desktop / tablet / mobile)
– Final quality check on layout, navigation, and broken links
Deliverables
– Fully structured and content-filled website (desktop/mobile)
– SEO fields and tags integrated
– All CTAs active and linked
– Blog, Podcast and Resource sections created
– Page-by-page progress updated in tracker (Excel file provided)
– One round of revision post-integration
Tech Stack & Platform
Please confirm in your reply:
– Your preferred platform (WordPress, w/ elementor, other)
The site must be fast, easy to manage, and SEO-friendly.
What We Provide
– Final content (14+ pages)
– SEO Master File (H1, slug, meta)
– Page-by-page integration tracker (Excel)
– CTA locations + links
– PDF resources to upload if any
– Visual examples (optional)
What We Expect
Please confirm in your reply:
– Your preferred platform (WordPress, w/ elementor, other)
The site must be fast, easy to manage, and SEO-friendly.
Timeline
Kick-off: As soon as confirmed
1st delivery: within 7–10 days
Final delivery: within 14 days including 1 revision loop
To Apply
Please include in your message:
– Examples of similar websites you’ve built
– Your preferred CMS (Webflow, WordPress, etc.)
– Confirmation that you can work with our documents (Excel, Google Docs)
– Your rate for the full integration project (not hourly)
We look forward to collaborating with you to bring this project to life!