We Connect Asia

Refinancing a C&I Solar Portfolio – Philippines

Challenge

The developer had successfully built and operated a portfolio of 6 C&I rooftop solar sites (between 500 kWp and 2 MW), but lacked access to fresh capital. Despite healthy operational cash flow, traditional banks considered the portfolio too small and fragmented for refinancing. This limited the client’s ability to scale new projects.

Our Approach

WeConnect Asia proposed a refinancing strategy using the EquiFlex model:

📊 Performed a quick commercial assessment of the operational portfolio

🧾 Helped gather necessary documentation (PPAs, maintenance logs, cash flow statements)

🤝 Connected the client with a European green debt fund specialising in small/mid-scale RE assets

💼 Supported negotiation and term sheet alignment between developer and financier

Outcome

1. Portfolio refinanced at the SPV level with asset-backed senior debt

2. Cash released to the developer’s holding company

3. Additional 15 MW pipeline now actively developed using unlocked capital

4. Developer introduced to second-tier lender for future replication across Southeast Asia

Let’s Talk

Have a similar portfolio or pipeline?
Let’s assess if EquiFlex can help you unlock growth.