Home » UCO Traceability and Fraud: How to Catch a False Declaration Before It Reaches Your Model
UCO Traceability and Fraud: How to Catch a False Declaration Before It Reaches Your Model
10 min read · Nov 2, 2026 · By Alex
You catch it in the paperwork. Verification of used cooking oil rests on auditing documents and records along the supply chain rather than on laboratory testing, and the fraud itself has only two forms: virgin oil declared as used, or the same tonnes counted twice. That is why a lender working from the feedstock availability picture for Southeast Asia needs a second read on the declaration trail behind every declared tonne. UCO fraud surfaces in the records, long before anyone opens a valve.
Sustainable aviation fuel is built on a simple promise: the carbon savings come from waste, not from crops. For a lender at pre-final investment decision stage, that promise is underwritten by documents. Here is how the documents can lie, and the checks I would run first.
In short
- Where it lies: in the declarations and audit records, since waste oil and virgin oil are chemically alike.
- Two forms: adulteration, where virgin oil replaces waste oil, and multiple claiming, where the same tonnes are certified twice.
- Why testing fails: waste oil and virgin oil have a similar chemical and physical composition.
- What to read: accounting records, source declarations, audit evidence, and declared volumes.
- What to check first: price, then reconciled volume, then documents, and only then a visit.
In this article
The short answer: the fraud lives in the documents
Used cooking oil fraud, as Transport & Environment describes it, is when biofuels made from unsustainable feedstocks, such as palm oil, are reported as being made from UCO. It takes two forms. Adulteration is when virgin oil is mixed into genuine waste oil, or substituted for it, so a consignment of palm oil enters the refinery wearing a waste label. Multiple claiming is when the same physical tonnes are certified more than once, so the recorded volume exceeds the volume actually delivered.
Laboratory analysis is limited in practice. Waste oil and virgin oil share a similar chemical and physical composition, and hydrotreating into a drop-in fuel narrows the gap further. Verification therefore relies on auditing paperwork and records along the supply chain, which is what the industry means by chain of custody, rather than on testing the product.
What this means for you: I do not underwrite the molecule, I underwrite the paperwork. My first question to any supplier is how a declared tonne is traced back to a fryer rather than to a drum of palm oil, and I accept only answers that point to an auditable record.
What the criteria actually require you to prove
ReFuelEU Aviation takes its definition of sustainable aviation fuel from the renewable energy directive. Advanced biofuels must come from feedstock listed in part A of Annex IX, the annex where that directive lists feedstocks with specific sustainability treatment, and biofuels from oils and fats listed in part B, where used cooking oil sits.
Under RED II, the contribution of waste oils such as UCO, which sit in part B, is limited to 1.7% of road and rail energy. That cap is a scarcity control, and every extra tonne claimed as waste carries a policy value.
The physical and chemical nature of waste oil and of drop-in hydrotreated fuels makes it possible to disguise virgin vegetable oil, palm or soy, as waste oil, and that there are multiple documented cases of waste oil fraud in the European Union. The sustainability criteria therefore define what must be proven rather than how it is proven.
What this means for you: I ask which part of Annex IX the feedstock sits in, what evidence supports that placement, and who re-checks it after an audit.
Why the certificate alone does not settle it
Voluntary schemes use a mass balance approach: physical segregation of sustainable and non-sustainable product is not required, so accounting documents track what passes through the chain of custody and those documents are audited. A point of origin, meaning the restaurant or fryer supplying the oil, submits a declaration rather than a sample.
The weakness is arithmetic. A producer receiving 50 tonnes of UCO per month can be certified through two different audits, report 100 tonnes across the two certificates, and conceal 50 tonnes of unsustainable feedstock entering production. That is multiple claiming, and no laboratory test detects it because the feedstock is not there to be found.
Most sources are never visited. Restaurants provide a self-declaration to their collecting point, and an audit of a point of origin is only required if it supplies more than 5 tonnes of UCO a month. The document trail and the registry side of the same problem are set out in book and claim.
What this means for you: I read the certificates last. Declarations, mass balance records and audit evidence come first, because the certificate only reports what the records already claim.
Why the fraud pays
Mandates turn a preference into a fixed obligation. ReFuelEU Aviation sets a 2% share of SAF at EU airports from 2025, rising to 70% from 2050, and a 1.2% share of synthetic aviation fuels from 2030, rising to 35% from 2050. Suppliers report their SAF volumes through the Union database for biofuels. Carbon intensity, meaning lifecycle emissions per unit of energy, decides which feedstocks qualify.
The pull is global. Singapore targets 1% SAF for all departing flights from 2026, increasing to 3 to 5% by 2030, supported by a levy. South Korea and Indonesia have announced roadmaps requiring 1% SAF from 2027, and Japan has set a 10% SAF blending target for domestic airlines by 2030. The mandate landscape shows how fast that demand compounds.
The ICCT draws the policy conclusion: capping the contribution of waste oils would limit the incentive to expand waste oil exports from Asia and reduce waste oil fraud risk.
What this means for you: I price the mandate obligation into the offtake before I price the fuel, since a supplier meeting a growing percentage obligation only with scarce feedstock carries a volume risk I must size.
The checks I would run before I sign
Price comes first. Feedstock accounts for the lion’s share of total HEFA production costs, and its price varies significantly with market supply and demand, while collecting UCO in Asia is around 30% cheaper than in Europe. A price far outside that regional range is a signal, not a bargain, and the price picture is where I start.
Volume comes second. I reconcile what the points of origin declare against what the aggregator weighs at the depot, and I do it for a full month before I accept a single figure as the contract baseline. A gap here cannot be recovered later by an audit of finished fuel.
Documents come third: the mass balance records behind each declared tonne, and audit rights above the 5 tonne monthly threshold at every point of origin. Only after those three checks do I visit a site.
What this means for you: a cheap tonne that fails the volume reconciliation is more expensive than a fair tonne that passes it, because the difference lands in the carbon claim rather than in the invoice.
What the trade data says
The volumes do not balance. Europe consumes 130,000 barrels of UCO a day, 8 times more than it collects, and the United States consumes 40,000 barrels a day. China already exports more than half of its UCO to be used in European and US cars and trucks, and Malaysia exports 3 times more UCO than is collected in the country.
The ICCT trade balance shows the same shape: Malaysia exports 321 kilotonnes against 48 to 71 kilotonnes collected, while also importing large quantities as a regional hub, which makes origins hard to trace.
On the certificate side, only 9% of ISCC-certified UCO collecting points in China, Malaysia and Indonesia had a sample of their points of origin audited. For the remaining 91%, no audits were conducted: a phone call, an email or an online search was enough.
What this means for you: I treat any collection figure from these origins as an upper bound to be tested, not as a baseline to be financed, and I size the offtake against what can be reconciled rather than what can be declared.
The order I would run the work in
I run the work in this order. First, list the points of origin and their monthly tonnage. Second, reconcile weighbridge records against declared collection. Third, demand audit rights above the 5 tonne threshold. Fourth, test the price against a published reference. Fifth, cross-check the declared volumes against the reporting in the Union database for biofuels. Only then do I accept the offtake structure.
On the financing side the evidence has a deadline. Investors often require at least 70 to 80 percent of annual capacity to be covered by offtake agreements, and some lenders require 100 percent of the SAF produced to cover the full loan tenor of 8 to 14 years. I therefore build the feedstock supply evidence pack before the term sheet, not after.
Each step answers a different failure: price catches substitution, volume catches inflated collection, documents catch multiple claiming, and only a visit catches a point of origin that does not exist.
What this means for you: I write these evidence requirements into the term sheet as conditions precedent, because a lender asking for mass balance records after financial close is asking for a story rather than a record.
How I would run this if it were my file
I benchmark the exposure with published volumes. The largest scheme certifying UCO biofuels has at least 1,275 valid UCO certificates registered on its online database. The audit threshold at a point of origin is 5 tonnes a month. Across six Asian exporting countries, total current collection runs in the range of 3,700 to 5,000 kilotonnes a year.
Against that, I set the SAF side. Global SAF production in 2025 is estimated at 2 Mt, with HEFA accounting for over 90% of current or upcoming SAF capabilities. By 2030, global SAF production capacity is expected to reach around 20 Mt with the project success factor applied, of which HEFA refineries account for about 95% of total volume.
That tells me how much of my offtake rests on a system where 91% of collecting points were not audited at origin, and how little slack exists if a declared tonne turns out to be palm oil.
What this means for you: I put one number in front of the credit committee, the share of declared feedstock whose point of origin has been physically verified, and I do not sign until it is stated rather than assumed.
Sources
- Transport & Environment, 15 November 2026.
- Transport & Environment, 18 June 2024.
- ICCT, February 2022.
- European Commission, 15 November 2026.
- IATA, September 2025.
- World Economic Forum with Kearney, February 2025.
Frequently asked questions
Can a laboratory test tell used cooking oil from palm oil?
Not reliably at the product level. Laboratory analysis is limited in practice because of the similar chemical and physical composition of waste oil and virgin oil, so verification typically relies on auditing paperwork and records along the supply chain rather than on testing the material. I treat a test result as supporting evidence only, and I ask what the point of origin records say before I look at any certificate.
What is multiple claiming in a UCO supply chain?
It is the same tonnes certified more than once. A producer receiving 50 tonnes a month certified through two different audits reports 100 tonnes across the two certificates and conceals 50 tonnes of unsustainable feedstock entering production. The physical material is never wrong, only the accounting, which is why the failure sits in the audit file rather than in the tank.
Which documents should I ask for before I sign a feedstock contract?
The list of points of origin with monthly tonnage, the mass balance records behind each declared tonne, evidence of audits above the 5 tonne monthly threshold, a published price reference, and offtake covering 70 to 80 percent of annual capacity for the 8 to 14 year tenor. If any one of those is missing I treat the contract as unpriced rather than merely unsigned.
Does the EU Union database for biofuels solve the problem?
Not on its own. The Union database for biofuels is still reliant on certification and has been criticised by industry stakeholders and Member States, while suppliers report their SAF volumes through it. It records what has been declared, so it is useful for cross-checking volumes and it is not an origin verification of its own.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you are structuring a SAF project at pre-final investment decision stage and want the feedstock evidence assembled before the term sheet, I can walk the supply chain with you and set the audit conditions a lender will ask for. Start with investor introductions.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.