Lignocellulosic SAF Feedstocks: What the Residue Base Really Supports

10 min read  ·  Nov 2, 2026  ·  By Alex

lignocellulosic saf feedstock

The regional feedstock page carries the wider numbers, and I open with the answer a supplier asks: the residue base is large, the accounting rewards it, and the first plant plus the collection chain are what break. Southeast Asia holds 375.3 million tonnes a year of dry residues and wastes (left over from production or discarded, not grown as a crop): 138.6 million tonnes of rice husks and straw, 32.3 million tonnes of municipal solid waste and 23.9 million tonnes of bagasse and cane tops. Part A of annex IX (the list of feedstocks for advanced biofuels whose contribution towards the minimum shares may be considered twice their energy content) counts straw and bagasse twice, but no commercial scale biomass gasification to fuel facility was operating when the ICCT last counted, and its estimate for sustainable aviation fuel (SAF) from these materials in the European Union is 0.36 million tonnes in 2025 rising to 1.96 million tonnes in 2035. That is the lignocellulosic (plant fibre based) feedstock base, and the lignocellulosic SAF feedstock question is one of conversion, not of resource.

This page is the sub-hub of the feedstock branch, so I hold it to three things: what the residues are worth, what the rules do with them, and where the chain breaks. I read the seven sources listed at the end once, on 16 November 2026, and I repeat only the figures they carry.

In short

  • Resource: Southeast Asia holds 375.3 Mt a year of dry residues and wastes: 138.6 Mt rice husks and straw (36.9%), 44.2 Mt palm oil residues, 32.3 Mt MSW (8.6%) and 23.9 Mt bagasse, tops and leaves (6.4%).
  • Accounting: Straw sits at part A of annex IX point (e). In addition, bagasse at (j), where the contribution may be considered twice its energy content.
  • Conversion: The ICCT records no operating commercial scale biomass gasification to fuel facility and puts EU output at 0.36 Mt in 2025 rising to 1.96 Mt in 2035.
  • Readiness: on a technology readiness scale running from research to proven operation, the dominant route sits at 9 while the two routes able to handle plant fibre range from 5 to 9.
  • Break point: Transport, mobilisation and first-of-a-kind scale, not tonnage in the field.
Facebook
Twitter
LinkedIn

In this article

1. The short answer: the resource is not the bottleneck

RSB puts the Southeast Asian baseline at 375.3 Mt a year in dry mass: rice husks and rice straw at 138.6 Mt (36.9%), palm oil residues at 44.2 Mt, MSW at 32.3 Mt (8.6%) and sugarcane bagasse, tops and leaves at 23.9 Mt (6.4%). Also, RSB classifies rice husks and straw as high availability with low risk, MSW and bagasse as medium availability with low risk. Part A of annex IX of the renewable energy directive covers feedstocks for advanced biofuels whose contribution towards the minimum shares may be considered twice their energy content. In addition, the entries cited in the directive include straw at (e), animal manure and sewage sludge at (f), palm oil mill effluent and empty palm fruit bunches at (g) and bagasse at (j).

The ICCT reads the European lignocellulosic resource as enough for nearly 10 Mt of SAF, yet estimates actual output at 0.36 Mt in 2025 and 1.96 Mt in 2035, and records no operating commercial scale biomass gasification to fuel facility.

What this means for you: a large balance. In addition, a favourable accounting entry are two different facts. Therefore, I take the tonnage as an upper bound and the conversion record as the working case.

2. What the residue base is worth once it is converted

RSB converts its 375.3 Mt baseline into 40.9 Mt of potential SAF in 2025, 43.1 Mt in 2030 and 45.7 Mt in 2050, against the 380 Mt a year the aviation sector would need at net zero in 2050. Therefore, Southeast Asia alone would cover about 12%. The term I use, residues. In addition, wastes, covers material left over from production or discarded rather than grown as a crop, and the routes that convert it are not equivalent. The pathway picture behind those volumes runs on three legs: technology readiness. The scale from research to proven operation, reads 9 for HEFA, which processes oils and fats, 5 to 8 for alcohol-to-jet, which upgrades ethanol or isobutanol into jet range hydrocarbons, and 6 to 9 for Fischer-Tropsch, which gasifies the material to syngas and synthesises liquid fuel from it.

RSB puts planned worldwide volumes at 17 Mt for HEFA, 2.4 Mt for alcohol-to-jet and 0.4 to 0.9 Mt for Fischer-Tropsch. IATA puts global SAF production at just 2 Mt in 2025 and expects around 20 Mt of capacity by 2030, with about 95% still from HEFA refineries.

What this means for you. I can plan volume around a route at readiness 9, while the two lignocellulosic routes are still climbing toward it, so I price that gap rather than assume it away.

3. Why conversion, not collection, sets the pace

Lignocellulosic materials contain long organic polymer chains that are difficult to break down and require extensive pretreatment before thermochemical or biochemical processing. That makes them harder to convert than waste oils, according to the ICCT. The same source records delays in designing, constructing and deploying compatible biorefineries, only a small number of commercial sized cellulosic ethanol facilities, and no commercial scale biomass gasification to fuel facility in operation. ICAO states that the technologies able to use these feedstocks are still undergoing commercialization and that the critical challenge is to reach commercial scale with first-of-a-kind facilities at a global level. ICAO also records that harvesting, collection, storage and handling were among the major challenges of earlier commercial cellulosic ethanol efforts, and that material handling problems led to lengthy startups.

In addition, failure to reach expected capacity. The compliance. In addition, carbon intensity work therefore starts before tonnes are contracted. That is because a route that has not been built cannot be measured.

What this means for you: I put the conversion route and its first plant ahead of any supply agreement, since the chain breaks at the facility design rather than at the field boundary.

4. What the European rules do with these residues

Under ReFuelEU Aviation, the SAF definition covers synthetic aviation fuels from renewable hydrogen and captured carbon, advanced biofuels from feedstock listed in part A of annex IX of the renewable energy directive. Biofuels produced from oils. In addition, fats listed in part B of that annex, and recycled carbon aviation fuels. Part A is the list of feedstocks for advanced biofuels whose contribution towards the minimum shares may be considered twice their energy content. In addition, double counting means that the energy content of those materials is credited a second time toward the minimum share.

The shares are written into law: a 2% SAF share at EU airports from 2025 rising to 70% from 2050, and a 1.2% synthetic aviation fuel share from 2030 rising to 35% from 2050. More than 95% of air transport departing from EU airports is covered, and blended aviation fuels are certified to reach a SAF blend of up to 50%.

What this means for you: I check the annex IX entry before I price anything, because the entry decides whether the material counts at all and at what weight.

5. What sustainability criteria add to the pile

RSB rates rice husks and rice straw as high availability with low risk, and MSW, sugarcane bagasse, tops and leaves as medium availability with low risk, while noting that knowledge and technology readiness for the collection and utilisation of wastes and residues are less advanced than for traditional crops. The certification rules add their own filter: RSB records that feedstocks low risk for land use change benefit from an emission factor of zero under CORSIA, and that CORSIA keeps a positive list of wastes, residues and by-products. Only the biogenic fraction of MSW may count, with waste sludge, hazardous industrial waste. In addition, special waste requiring separate disposal excluded.

IATA reads second generation feedstock as having high emission reduction potential but being relatively limited in availability. Rice husks and straw carry 36.9% of regional availability, yet their Fischer-Tropsch route is still in development.

What this means for you: I rank material on risk and readiness together. That is because a large low-risk pile still fails if collection. In addition, utilisation knowledge sits behind traditional crops.

6. Three ways the residue assumption fails

First, transport. The ICCT does not model trade between member states because of the difficulty and expense of transporting lignocellulosic residues. Second, mobilisation. IRENA finds a low mobilisation rate of agricultural residues in Southeast Asia, logistics costs as the largest hurdle for one-way collection, transport and storage of bulk volumes with low energy density, and a survey in Viet Nam showing over 75% of farmers resorting to open burning or incorporation of residues into soil. IRENA also warns that relying solely on residues and wastes is risky when shipping fuel and biochar compete for the same material. Third, readiness. ICAO rates rice straw feedstock readiness as low because of supply chain challenges, and records that many commercial scale cellulosic ethanol facilities in Europe and the United States closed because they could not achieve capacity and were not economically viable.

What this means for you. I do not sign a supply volume until I hold a collection rate, a route at known readiness. In addition, the competing uses written down on one page.

7. The order I would run the work in

I start from the number that can be delivered, not the number that exists. First, I confirm what the local balance frees after existing uses. Second, I check which part A of annex IX entry the material sits in. Third, I check what the certification scheme says about it. Fourth, I check the pathway and its technology readiness. Only then do I discuss price and offtake. Two facts anchor the sequence: part A of annex IX is where straw. In addition, bagasse sit with a contribution that may count twice, and feedstock accounts for the lion’s share of HEFA production costs while lignocellulosic supply chains are still being established (IATA; RSB). The feedstock supply work holds the first three checks together in one file.

What this means for you: a feasibility study that opens on price has skipped three checks. In addition, I would rather lose a negotiation than the accounting behind it.

8. How I would run this if it were my file

I put my own residue balance against the published texts before I take anything to committee: the regional base of 375.3 Mt a year with rice husks and straw at 138.6 Mt (RSB), the part A of annex IX entries for straw and bagasse with double counting (EUR-Lex), the European output curve of 0.36 Mt in 2025 and 1.96 Mt in 2035 against a resource sufficient for nearly 10 Mt (ICCT), the technology readiness gap between HEFA at 9 and Fischer-Tropsch at 6 to 9 (RSB), and the mobilisation evidence from IRENA. Also, I add the regional projection of 40.9 Mt of potential SAF in 2025 and the IATA baseline of 2 Mt of global production in the same year. Therefore, the committee reads the resource and the delivered volume side by side.

What this means for you: I carry one page of numbers with their sources attached, and I let the first plant and the collection chain set the schedule.

Sources

Frequently asked questions

On paper yes and in practice not yet. Southeast Asia holds 375.3 Mt a year of dry residues and wastes of which 138.6 Mt are rice husks and straw, converting to a potential 40.9 Mt of SAF in 2025, but IRENA finds a low mobilisation rate for those residues and ICAO rates rice straw feedstock readiness as low because of supply chain challenges (RSB; IRENA; ICAO).

The two routes that carry lignocellulosic material are gasification with Fischer-Tropsch synthesis and alcohol-to-jet on ethanol or isobutanol, both under the ASTM framework, with technology readiness of 6 to 9 and 5 to 8 respectively against 9 for HEFA, and blended aviation fuels certified up to a 50% SAF blend (ICCT; RSB; European Commission).

Because deployment lags the resource. The ICCT records no operating commercial scale biomass gasification to fuel facility, delays in designing, constructing and deploying compatible biorefineries, and output of 0.36 Mt in 2025 rising to 1.96 Mt in 2035 for lignocellulosic feedstocks in the European Union (ICCT).

Three checks in order: what the material is freed from locally, where it sits in part A of annex IX and how the certification scheme classifies it, and the readiness of the conversion route plus the collection chain that must feed it (EUR-Lex; RSB; ICAO).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If your file sits at feasibility stage. I run investor introductions for SAF and feedstock projects in Southeast Asia, with the residue balance, the annex IX entry and the pathway readiness in front of both sides before any conversation starts.

I do not provide investment advice or arrange investments. Also, I act as a strategic advisor and facilitator.nd facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles