Can SAF Certificates Support Project Finance?

10 min read  ·  Oct 2, 2026  ·  By Alex

saf certificates project finance

My short answer to a lender asking whether certificate revenue belongs in the credit file is yes as a supporting line and no as a substitute. Certificate revenue creates a secondary value stream that diversifies a project’s income and helps secure advanced offtake agreements, which eases project financing, while the published financing playbook places book-and-claim sixth of ten levers, behind long-term offtake agreements that let a project reach final investment decision, the point at which a lender commits to fund construction. I test all of it against book and claim, the accounting model that separates the fuel’s environmental attributes from the fuel itself.

The question of whether certificate revenue can sit in a credit file is really a question about sustainable aviation fuel financing. SAF certificates project finance is the same question asked from the debt side, and I apply to it the same tests I use on any contracted revenue line.

In short

  • Answer: Yes as a supporting revenue line, no as a substitute for contracted offtake.
  • Rank: Book-and-claim sits at lever 6 of ten, behind long-term offtake at lever 5, the lever that passes final investment decision.
  • Scale: Output reaches 1.9 Mt in 2025 at 0.6% of jet fuel, then 2.4 Mt in 2026 at 0.8%.
  • Evidence: A secure registry record of issuance, not a delivery note.
  • Risk: Creditworthiness, default by buyer or producer, and lack of alignment on the system.
Facebook
Twitter
LinkedIn

In this article

The short answer

A sustainable aviation fuel certificate represents the environmental attributes associated with one metric ton of unblended, certified sustainable aviation fuel, and I shorten it to SAFc. RMI puts the credit argument in one line: by creating a secondary value stream that generates revenue for SAF producers and suppliers, SAFc also helps secure advanced offtake agreements for alternative fuels, easing project financing to build more capacity. Certificates are income to the producer, and that income feeds the offtake book a lender reads.

The World Economic Forum with Kearney playbook ranks ten financial levers and places lever 5, secure long-term offtake agreements to pass FID, ahead of lever 6, engage in book-and-claim to facilitate investments.

The same white paper defines the benefit of book-and-claim as revenue diversification, which I take to mean more than one payer for the same output, attracting players throughout the value chain and spreading the SAF premium across a wider range of stakeholders.

What this means for you: I record the certificate line as income that reinforces the offtake case, and I will not let it replace the offtake contracts.

What the line is worth in market terms

Sustainable aviation fuel is still a thin market. In 2025 SAF output is expected to reach 1.9 million tonnes, double the 1 Mt produced in 2024, and 2026 growth is projected to reach 2.4 Mt. Those volumes represent only 0.6% of total jet fuel consumption in 2025, increasing to 0.8% the following year.

By 2030, demand for global SAF is expected to reach 17 million tonnes per annum, representing approximately 4 to 5 percent of total jet fuel consumption, including government-mandated volumes and voluntary commitments by airlines. The industry may require between 19 billion and 45 billion USD in CapEx by 2030, depending on the proportion of HEFA in the production mix.

Corporate travellers and shippers can inset their scope 3 emissions through book-and-claim, which increases demand and diversifies revenue for the producer. A certificate buyer is therefore not a fuel offtaker but a payer of the green premium.

What this means for you: I size the certificate row against the 17 million tonnes per annum of demand expected by 2030, because that is the volume my revenue line has to sell into.

Where it sits in the funding sequence

My reading of how to finance a SAF project starts with the timeline. The SAF refinery lifecycle involves five critical phases: conceptualization, pre-feasibility, FID, construction and commissioning. The certificate line is not a phase; it is a revenue assumption that has to survive the first two of them.

By the end of 2024, installed SAF capacity globally is likely to have reached 4.4 Mt, with an additional 6.9 Mt of capacity expansion planned through greenfield projects and retrofitting. Reaching the anticipated level of demand in 2030 would require an additional 5.8 Mt of SAF production capacity, which would need to secure final investment decisions by 2026.

Among the ten published levers I place research and innovation grants for first-of-a-kind facilities, support from multilateral development banks, and guarantees or insurance instruments to enhance credit profile ahead of the certificate line. Each of those improves the credit profile before anyone asks what certificates will earn.

What this means for you: I put certificate revenue in the model only after grants, multilateral support and guarantees are documented, because those instruments change the risk, while certificates only change the income.

What a lender asks first

The risks named against this lever are creditworthiness, risk of buyers or producers defaulting, and lack of alignment on book-and-claim systems. Those are the three questions I expect before reaching FID.

A SAF registry is often needed for book-and-claim to work as intended, ensuring consistency and transparency and avoiding double-claiming and double-counting, and it records the issuance, transfer and retirement of SAF certificates. Retirement of a certificate means its cancellation on the registry, so no one else can claim the same reduction.

The SAFc Registry has onboarded more than eight fuel providers, five airlines and more than 30 corporate customers, facilitating the issuance of over 31,000 metric tons of SAFc representing more than 140,000 metric tons of abated aviation-related emissions.

Buyers and sellers need not be connected with a physical supply chain, so the evidence I ask for is the registry record rather than a delivery note.

What this means for you: I accept certificate revenue only where the registry entry names the buyer, the volume and the retirement date, because that entry is what survives a credit committee.

Price risk on the certificate line

A certificate is priced off the same premium as the fuel it represents. SAF prices exceed fossil-based jet fuel by a factor of two, and by up to a factor of five in mandated markets. At current price levels, the SAF premium translates into an additional USD 3.6 billion in fuel costs for the industry in 2025.

Airlines paid a premium of USD 2.9 billion for the limited 1.9 Mt of SAF available in 2025, of which USD 1.4 billion reflects the standard SAF price premium over conventional fuel.

That is the reference range behind sustainable aviation fuel price quotes. In Europe, under ReFuelEU Aviation, airlines pay up to five times more than the price of conventional jet fuel without guarantee of supply or consistent documentation, so the price I model for this line is volatile rather than contracted.

What this means for you: I take the certificate price from a documented quote, not from a forecast of the premium, and I test the row at both the factor of two and the factor of five.

The accounting rules that cap the revenue

The rules are strict and they limit volume before they limit price. Certificates must match the fuel in your inventory, come from a relevant fuel system, be quantified conservatively, relate to activity within 12 months unless a longer period is justified, never exceed your activity volume, and be serialized and retired in a secure registry.

Two of those are buyer-side duties. Buyers should confirm before purchase that the SAF was not used to meet a compliance mandate, and retire certificates in the company’s name with a documented record. Where a certificate is claimed on both sides, the ordering rule is that the scope 1 claim must be retired prior to the scope 3 retirement.

A SAF certificate conveys certified information about the associated physical SAF such as its carbon intensity and emission reductions compared with fossil jet fuel, and that certified figure is what makes the revenue line auditable for bankability.

What this means for you: I cap the row at my own activity volume, I drop any certificate without a retirement record, and I never count one certificate against both a compliance obligation and a voluntary claim.

How I model the line

I book only volume that has been issued and retired in a registry, at a price I take from a documented quote rather than from a forecast.

I keep the certificate revenue on its own row, separate from the physical fuel row, because the two are sold to different buyers under different rules. The fuel row is settled against an offtake contract and a delivery; the certificate row is settled against a registry entry and a retirement record.

I discount any row that has no retirement record, and I refuse to count the same certificate twice across a compliance obligation and a voluntary claim. I then test the row against the three published risks, creditworthiness, default of buyer or producer, and alignment on the system, before it reaches the model.

The base case carries only the volume already retired in the buyer’s name, and I treat any unretired pipeline as a sensitivity rather than as contracted income.

What this means for you: a certificate row that survives those filters is small, traceable and defensible, which is exactly the profile a credit paper needs.

The decision rule I apply

I accept the certificate line as supplementary revenue when the retirement record exists, the buyer passes a credit test, and the accounting rules are written into the contract. All three conditions are documented before the row enters the model.

I refuse it as a substitute for long-term offtake, because the published sequence puts the offtake lever ahead of the book-and-claim lever. A project does not reach final investment decision on certificate income alone, and the playbook does not claim that it does.

I present it to a lender as a documented second revenue stream that spreads the SAF premium across more payers, not as a debt service guarantee. The distinction matters in a credit paper: the offtake contracts carry the debt service, and the certificate line reduces the share of that premium borne by the offtaker alone.

What this means for you: I write the certificate line into the model with a retirement record, a credit-tested buyer and contracted accounting rules, and I label it supplementary in every version of the paper.

Sources

Frequently asked questions

No, and the published playbook does not present it that way. Long-term offtake agreements are the lever to pass FID, while book-and-claim is a separate lever that facilitates investments by diversifying revenue. The industry may require between 19 billion and 45 billion USD in CapEx by 2030, and certificate income sits inside that figure rather than funding it.

It allows buyers in one part of the world to pay for the green premium and receive the associated credit even though the physical SAF is used in another location. That buyer pool increases demand and helps secure advanced offtake agreements, easing project financing to build more capacity, which is what a project needs to reach final investment decision.

The evidence is the registry record of issuance, transfer and retirement, plus the retirement in the company’s name with a documented record. A registry exists to avoid double-claiming and double-counting, so a documented registry entry, rather than a contract summary or a delivery note, is what I put in the credit file.

Prices already move with policy. SAF prices exceed fossil jet fuel by a factor of two and by up to a factor of five in mandated markets, and e-SAF compliance costs could escalate to EUR 29 billion by 2032 if targets are not met, so I treat the line as variable rather than contracted and I re-quote it at every model update.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

Certificate revenue is only one row in a pre-FID model, and how it reads depends on the offtake and the registry record behind it. If you want a second view on that row, I provide investor introductions and structuring support for SAF projects at the pre-FID stage.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia