SAF Price Risk and Hedging: What a Lender Can Actually Cover

10 min read  ·  Jul 13, 2026  ·  By Alex

saf price risk hedging

Only part of it. The price of sustainable aviation fuel (SAF) is built from production cost plus a market premium, logistics, certification, transaction costs and markups along the supply chain, and only the conventional aviation fuel (CAF) reference under that stack behaves like a hedgeable commodity. The market for jet fuel derivatives with a maturity of greater than six months is described by industry participants as lacking liquidity, so airlines use crude oil derivatives with maturities of up to two or three years and carry the basis difference between crude and jet fuel themselves. That is why saf price risk hedging stops being a derivatives question, and why the price anatomy on the parent page matters before any structure is drawn.

I am writing this for a lender or development finance institution at the pre-final investment decision (FID) structuration stage, asking which part of the exposure can be covered with a listed instrument. The short version: the reference can be hedged, the premium has to be contracted, and the boundary between the two moves with liquidity rather than with preference. Here is how I split the file.

In short

  • Hedgable: the conventional aviation fuel reference, through indexation to an Argus Media or Platts assessment.
  • Contractable: the market premium, logistics, certification, transaction costs and supply chain markups.
  • Liquidity window: jet fuel derivatives beyond six months are described as lacking liquidity.
  • Basis risk: crude oil derivatives carry a basis difference against the jet fuel exposure.
  • Tenor gap: airlines hedge two to three years against a debt tenor of 20 to 25 years.
Facebook
Twitter
LinkedIn

In this article

The short answer: hedge the reference, contract the premium

The price a buyer pays on top of production costs incorporates add-ons such as a market premium, logistics, certification, transaction-related costs and markups throughout the supply chain. The market premium I just mentioned is defined as the difference between production cost and market price, and in Europe in 2024 it reached as high as around 1000 USD/tonne of HEFA SAF. Indexation is the practice of pricing by reference to a published assessment instead of by reference to a fixed cost stack, and it is the only part of this price that behaves like a conventional commodity.

The rest behaves differently. SAF prices can range between 2 and 5 times that of CAF, depending on the technology pathway and the chosen feedstock. In 2025 the premium translated into an additional 3.6 billion US dollars in fuel costs for the industry, while SAF prices exceeded fossil-based jet fuel by a factor of two and by up to a factor of five in mandated markets.

What this means for you: ask for the price line split between reference, premium, logistics, certification and transaction costs before any hedging discussion begins. If the split does not exist, there is nothing to index, and the whole number becomes a contract question.

Split the price before you hedge it

Near-term pricing mirrors CAF: a CAF price index with a SAF premium applied, or a SAF price index. Both are published by a price reporting agency such as Argus Media or S&P Global Commodity Insights for specific trading markets, for example Singapore, and the worked formulas are plain: an Argus FOB Singapore assessment of the prior period plus a percentage of that assessment plus add-ons; the same assessment plus a fixed US cents per gallon plus add-ons; or a Platts CIF ARA assessment plus add-ons.

Long-term offtake agreements point to cost-of-production or cost-plus pricing, and an equity stake points to a different methodology again, which can include parity with CAF.

The reference itself is still built the way jet fuel has always been built: a price reporting agency assessment, plus logistics costs, plus additional fees, plus the supplier’s margin, updated fortnightly for the two weeks in transit. Once that split exists, the offtake structure can carry what the index cannot.

What this means for you: map each component to either an index or a contract before any structure is drawn. The index side is small and dated, so the contract side has to carry the premium and the logistics.

What the derivatives market can and cannot carry

Because of what industry participants describe as a lack of liquidity in the market for jet fuel derivatives with a maturity of greater than six months, many airlines use crude oil derivatives with maturities of up to two or three years to meet their risk management objectives. A forward contract fixes the price for a future transaction, a cross hedge replaces the hedged commodity with a related one that moves with it, and the basis difference is the residual gap between the crude instrument and the jet fuel exposure that the cross hedge cannot close.

Because crude oil is a component of the price of jet fuel, exposure to changes in jet fuel price is reduced, and IFRS 9 allows airlines to reflect that basis difference in their accounting.

The evidence on horizon is not encouraging. Across two decades of daily data, the most effective hedge is heating oil futures with a 3 month maturity, effectiveness falls as time to maturity grows, and none of the four cross hedge proxies tested can be considered highly effective. The traditional West Texas Intermediate benchmark follows jet fuel less closely than it used to.

What this means for you: treat six months as the liquid horizon and everything beyond it as an exposure you carry rather than transfer. The instruments exist, the maturity does not.

The part of the price no derivative fixes

Feedstock costs are the largest cost component for a HEFA producer, and within the variable processing costs hydrogen is the largest component. A cost-plus model is a build-up of the forecast costs the supplier expects to incur, less rebates such as tax credits and incentives, plus a margin, so movements in those inputs travel through the price. Feedstock pass-through is that mechanism written explicitly: the buyer absorbs the change in feedstock and hydrogen cost instead of the seller.

The risk profile favours the seller, which is why the cost-plus model is becoming more popular with suppliers. Clauses allowing the seller to renegotiate pricing mid-contract or even yearly can be introduced, and if uncapped they add complexity to a fuel budget and another layer of risk to SAF supply.

The mitigation I look for is contractual: strong transparency provisions on fluctuating costs, diversified feedstock usage, and a feedstock position that can be diligenced against competing demands.

What this means for you: if the offtake price can be renegotiated yearly without a cap, the hedge conversation becomes irrelevant, because the exposure you modelled is not the exposure you will pay. Ask who carries feedstock and hydrogen movement, in writing.

The obligation that creates the premium you are pricing

The UK SAF Mandate secures demand by obligating an increasing amount of SAF in the overall UK aviation fuel mix, and it incentivises supply through the award of tradeable certificates with a cash value. The obligation starts in 2025 at 2 percent of total UK jet fuel demand, rises linearly to 10 percent in 2030 and to 22 percent in 2040, and from 2040 it remains at that level until there is greater certainty regarding SAF supply.

A company must register if it owns and supplies 15.9 terajoules or more of relevant aviation turbine fuel for use in the UK during an obligation year running from 1 January to 31 December, and suppliers applying for certificates must have their claims independently verified. The department is developing a SAF revenue certainty mechanism, with a levy design, a delivery plan and a contract allocation strategy published as policy papers.

This is why the premium tracks policy rather than crude: the mandate schedule is the demand curve underneath it, and airlines under a mandate pay far above the conventional reference.

What this means for you: identify which obligation sits behind the quoted premium, who is registered, and who pays if the share is missed. The premium is a compliance number before it is a market number.

Three ways a hedging plan fails on a SAF file

First, the tenor gap. Airlines do not typically forward-hedge their fuel requirements beyond two to three years, so even a 10 year airline purchase commitment leaves a large uncontracted tail against a long-term debt tenor of perhaps 20 to 25 years. In the absence of a well-established pricing index for SAF, project finance lenders will likely require offtake on a fixed-cost basis or by reference to another commodity index they are comfortable with.

Second, the basis gap. Crude is not jet fuel. None of the four cross hedge proxies tested can be considered highly effective, and as the gap between crude and jet fuel prices increases it hurts those who hedge with West Texas Intermediate futures.

Third, the premium gap. Much of the SAF purchased in the future could rest on long-term offtake agreements and equity stake investments, so a significant portion of the market is likely not covered in price reporting agency assessments. In 2025 the premium still reached 3.6 billion US dollars in fuel costs for the industry.

What this means for you: size the debt against the uncontracted tail first, then against the basis you carry, then against the premium no published assessment shows.

The order I would run the work in

First, I split the price line by line between index, premium, logistics, certification and transaction costs. Second, I index only what is liquid, knowing that the liquid window stops around six months and that crude derivatives carry a basis difference which accounting treatment does not remove from the economics. Third, I contract the rest: feedstock and hydrogen exposure written into the offtake rather than assumed away, transparency provisions on fluctuating costs, and a limit on uncapped renegotiation.

Fourth, I confirm the mandate exposure behind the premium and who carries the compliance cost, since lenders expect change in law risk to feature in due diligence and, ideally, the cost of compliance to pass to the offtaker, which is the exposure the policy risk page sets out. Fifth, I test the structure against the marketing analysis a lender will demand for any merchant volume, and the debt sizing that follows.

What this means for you: run the steps in that order, because each one removes a question the next step would otherwise inherit.

How I would run this if it were my file

One page before committee. On it: the price anatomy of production cost, market premium, logistics, certification, transaction costs and markups; the 2 to 5 times multiple against CAF; the six month liquidity limit and the basis difference handled under IFRS 9; the cross hedge evidence showing heating oil at 3 months as the least bad proxy, with none of the four highly effective; the 2 to 3 year hedging horizon of airlines against a 20 to 25 year debt tenor and the lender preference for a fixed-cost offtake; and the mandate schedule that runs from 2 percent in 2025 to 22 percent in 2040.

Everything that can sit in a listed instrument sits there, marked as liquid only to six months and basis-exposed. Everything else sits in the contract, priced, capped and allocated.

What this means for you: the committee does not need a view on futures, it needs the split. Show which number is indexed, which is contracted and which is simply carried, and the hedging question answers itself. Everything else on that page is presentation.

Sources

Frequently asked questions

Not directly. The premium is a market add-on sitting on top of production cost alongside logistics, certification, transaction costs and markups, and in 2025 it moved 3.6 billion US dollars of fuel cost for the industry. It is therefore contracted through index, cost-plus or fixed-price terms rather than through a listed instrument. An index only moves with the conventional reference underneath it; the premium moves with policy, feedstock and available supply.

Because the jet fuel derivatives market is described by participants as lacking liquidity beyond six months, while crude oil derivatives are available with maturities of up to two or three years. The cost of that substitution is a basis difference between the crude instrument and the jet fuel exposure, which IFRS 9 allows airlines to reflect in their accounting but which the economics still leave with the buyer.

For a liquid horizon only. Research on two decades of daily data finds the most effective cross hedge is heating oil futures at a 3 month maturity, and none of the four proxies tested can be considered highly effective. Airlines typically do not forward-hedge beyond two to three years, so past that point the exposure is documented with a counterparty rather than priced by a market.

The movements that cannot be indexed, meaning feedstock and hydrogen, since feedstock is the largest cost component for a HEFA producer and hydrogen the largest variable one. That also means transparency provisions on fluctuating costs, a cap on renegotiation, and allocation of change in law compliance cost to the offtaker where the contract allows it.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are structuring a SAF offtake and need the price, the tenor and the compliance cost allocated between producer and buyer, I work on offtake agreements with that split as the starting point. Send me the price line and the debt tenor, and I will show you where the hedge stops and the contract has to begin.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia