We Connect Asia

SAF

EU Annex IX Feedstocks: What Counts as Advanced and What Does Not

10 min read  ·  Nov 2, 2026  ·  By Alex

annex ix feedstock

Two lists decide, not one: part A of annex IX of the renewable energy directive, whose contribution towards the minimum shares may be considered twice their energy content and which lists palm oil mill effluent and empty palm fruit bunches at point (g), and part B, which is limited and holds exactly two entries, used cooking oil and animal fats of categories 1 and 2. However, A material that appears in neither list is outside the accounting the European rules use. Also, That is the answer I give first. In addition, I read the annex IX feedstock by feedstock, and I start from the texts behind the feedstock availability view for Southeast Asia.

Everything that follows comes from the texts as they stand: the directive on EUR-Lex, the European Commission page on ReFuelEU aviation. Also, the ISCC eligible materials list. Instead, I write for the feasibility stage, where a wrong reading costs a plant design rather than a quarter.

In short

  • Part A: counted twice, from palm oil mill effluent and empty palm fruit bunches at (g) to straw, tall oil pitch, crude glycerine and bagasse.
  • Part B: limited by design, with exactly two entries: used cooking oil and animal fats of categories 1 and 2.
  • Outside: palm fatty acid distillate appears in no part of annex IX.
  • Aviation: ReFuelEU aviation takes advanced biofuels from part A and oils and fats from part B.
  • Base: Europe consumed close to seven million tonnes of UCO for biofuels in 2023, close to eight times its collected volumes.
Facebook
Twitter
LinkedIn

In this article

The short answer: two lists decide, not one

I read the annex as two separate instruments. Furthermore, Part A of annex IX holds the feedstocks for the production of biogas for transport and advanced biofuels. For example, The contribution of which towards the minimum shares may be considered to be twice their energy content (EUR-Lex). However, Advanced biofuels, as the European rules use the term, are the biofuels produced from the feedstocks the directive itself names. Its point (g) names palm oil mill effluent and empty palm fruit bunches, and the text also cites (e) straw, (f) animal manure and sewage sludge, (h) tall oil pitch, (i) crude glycerine and (j) bagasse.

Part B counts as limited and contains exactly two entries: (a) used cooking oil, and (b) animal fats classified as categories 1 and 2 in accordance with Regulation (EC) No 1069/2009 (EUR-Lex). In fact, Palm fatty acid distillate appears in no part of annex IX (EUR-Lex).

What this means for you: a material in neither list sits outside the accounting the European rules use, and no volume in a spreadsheet changes that reading.

What part A is worth to a project

Part A covers feedstocks for the production of biogas for transport and advanced biofuels. For example, The contribution of which towards the minimum shares may be considered to be twice their energy content (EUR-Lex). In fact, That is double counting: when biofuels derived from annex IX feedstocks are used in transport. For example, Their energy content may be counted twice toward national renewable energy targets, against an EU target of 29% of transport energy from renewables by 2030 (ISCC, 22 August 2025).

Those feedstocks are read as waste and residue, materials regarded as having zero greenhouse gas emissions at their origin. Instead, Palm oil mill effluent and empty palm fruit bunches sit in part A, and each tonne of POME produces approximately 28 m3 of biogas (ISCC, 22 August 2025). Moreover, I read that counting logic beside the sustainability criteria that decide which tonnes qualify at all.

What this means for you: part A buys a counting advantage rather than a market. Also, it exists only if the tonne is what the certificate says.

What part B is capped to

Part B holds only used cooking oil and animal fats of categories 1 and 2. Also, its contribution towards the minimum share shall be limited (EUR-Lex). For example, The ICCT reads the cap in RED II as limiting the contribution of waste oils like UCO to 1.7% of road and rail energy, and reads the proposed revision as applying that same 1.7% cap to all transport energy including marine and aviation (ICCT, February 2022).

The scheme documents keep the same reading. In addition, The ISCC eligible materials list treats used cooking oil as a material that RED II indicates as waste or residue, classified as such in member states including Germany, France, Ireland, the Netherlands and the United Kingdom (ISCC, February 2026). Instead, I set that next to the carbon intensity work that has to document the same tonne, because the cap decides how much of a UCO plan can ever be counted, whatever the contract says.

What this means for you: part B gives an eligible feedstock with a ceiling attached, so I size the volume against the ceiling before I size it against the price.

How ReFuelEU aviation is built on those lists

The definition of sustainable aviation fuel (SAF) in the regulation covers synthetic aviation fuels from renewable hydrogen and captured carbon, advanced biofuels from feedstock listed in part A of annex IX, biofuels produced from oils and fats listed in part B, and recycled carbon aviation fuels (European Commission). For example, ReFuelEU aviation does not invent a feedstock test of its own: it borrows the two lists.

The shares sit in law. Meanwhile, A 2% share of SAF in EU airports from 2025 rises to 70% from 2050, and a 1.2% share of synthetic aviation fuels in all EU airports from 2030 rises to 35% from 2050 (European Commission). Therefore, More than 95% of air transport departing from EU airports is covered, and fuel suppliers report their SAF volumes through the Union database for biofuels (European Commission). The ReFuelEU aviation rules therefore set the demand profile before any plant decision.

What this means for you: if the material is not in part A or part B. Therefore, The SAF definition does not reach it, and no blending plan changes that.

What the listing is worth in demand

RED III set a combined minimum target for advanced biofuels and RFNBOs at 5.5% of the transport sector in 2030. Of that target, at least 1% must be RFNBOs. These are renewable fuels of non-biological origin made from renewable hydrogen and captured carbon (ISCC, 22 August 2025).

The ICCT sees the RED II revision creating demand for 3,500 kilotonnes of UCO imports in the EU in 2030. The 15% ReFuelEU SAF mandate sits outside the 5% sub-mandate. As a result, it drives 5,600 kilotonnes of UCO import demand in 2035 (ICCT, February 2022). European countries consumed close to seven million tonnes of UCO for biofuels in 2023, close to eight times higher than collected volumes and four times the continent’s maximum potential (Transport & Environment, June 2024). I read that gap first in the low carbon fuel mandates that set these volumes.

What this means for you: the listing creates demand on paper, so I treat the eligible base as the binding line rather than the mandate headline.

Three ways the eligibility assumption fails

First, the material is absent from both lists, which is the case for palm fatty acid distillate (EUR-Lex).

Second, the national classification of the same tonne diverges. The ISCC list records that several EU Member States explicitly classify PFAD as a co-product, for example the United Kingdom and the Netherlands, because of its significant economic value about the main product (ISCC, February 2026). By contrast, The same list marks PFAD for FuelEU Maritime only, not for ReFuelEU Aviation (ISCC, February 2026).

Third, the tonne itself. Labelling or selling other types of oil, for example palm fatty acid distillate or crude palm oil, as POME oil is a serious and fraudulent breach of ISCC EU requirements, with consequences such as withdrawal of the certificate and exclusion from recertification (ISCC, 22 August 2025).

What this means for you: I check the list, the national reading. Also, the physical tonne in that order, because any one of the three can take a project out of the accounting.

The order I would run the work in

I check the list before I check the model. First I read annex IX and confirm the entry sits in part A or part B. Then I read the scheme’s material list and confirm the ReFuelEU Aviation and FuelEU Maritime columns for that line. Then I ask which member state will count the tonne and how it classifies it there. Only after that do I test the volume against what the mills can supply. Also, only then do I discuss price.

Two facts anchor the sequence. The definition of SAF in ReFuelEU aviation is built directly on parts A and B of annex IX (European Commission), and second generation feedstock such as used cooking oil, animal fat and residues like POME has high emission reduction potential but is relatively limited in availability (IATA, September 2025). The physical side of the work sits in the feedstock supply review that follows this reading.

What this means for you: running the checks in this order keeps price work off a material that was never going to count.

How I would run this if it were my file

I would put my own feedstock sheet against the published texts before I take it to committee: part A with palm oil mill effluent and empty palm fruit bunches at point (g) and a contribution that may be counted twice (EUR-Lex), part B limited to used cooking oil and animal fats of categories 1 and 2 with the ICCT reading the cap at 1.7% of road and rail energy (EUR-Lex; ICCT, February 2022), the ReFuelEU definition and its shares (European Commission), the ISCC material list with its A and M columns and its national classifications (ISCC, February 2026), and an eligible base that is already stretched, close to seven million tonnes of UCO consumed in Europe in 2023 against far lower collection (Transport & Environment, June 2024).

The two lists stay the spine of the file: what annex IX names decides what the rest of the paperwork can count. Every line on that sheet points to a document I can open, and none of them promises a sale.

What this means for you: I would show a committee a list reading. Also, a volume test than a forecast, because the first is checkable and the second is not.

Sources

Frequently asked questions

The ones written into the list. Part A covers the feedstocks for the production of biogas for transport and advanced biofuels, whose contribution towards the minimum shares may be considered twice their energy content, including palm oil mill effluent and empty palm fruit bunches at point (g), straw, animal manure and sewage sludge, tall oil pitch, crude glycerine and bagasse, while part B holds used cooking oil and animal fats of categories 1 and 2 (EUR-Lex).

Part A is the double counting list for advanced biofuels, and part B is the limited list for waste oils and animal fats, with the ICCT reading its contribution as capped at 1.7% of road and rail energy under RED II (EUR-Lex; ICCT, February 2022).

Not under this accounting: a material that appears in neither part is outside the definition ReFuelEU aviation uses, which takes advanced biofuels from part A and biofuels from oils and fats in part B, while suppliers may also comply with renewable hydrogen or low-carbon hydrogen meeting a lifecycle emissions savings threshold of 70% (EUR-Lex; European Commission).

Three things in this order: the entry in annex IX, the scheme’s material list and its ReFuelEU Aviation column, and the national classification of the member state that will count the tonne, since the same material can be read as a waste or residue in one country and as a co-product in another (EUR-Lex; ISCC, February 2026).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are at feasibility stage and want the list reading, the national classification and the volume test run on your own candidate materials, that is the work I do with developers before a committee sees a number. Investor introductions follow a feedstock sheet that already stands up to the texts.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles