We Connect Asia

Category: Power-to-X

Why Singapore's ammonia bunkering authorization and 2035 demand projection, not production announcements, is the clearest green ammonia market signal in Southeast Asia right now, and what it means for producers structuring offtake.
Inside the NEOM capital stack: how USD 8.4 billion of equity, debt and offtake support shaped the world's largest green hydrogen deal so far.
No hydrogen project reaches FID on the date in the first press release: here is the sequence of gates that sets the real calendar, and the one case I can date.
An RFNBO is a renewable fuel of non-biological origin. Here is what qualifies, why e-SAF and e-methanol depend on it, and what lenders check.
Vietnam, Indonesia, Malaysia and the Philippines host green hydrogen projects past announcement. See who builds what, at scale and near FID.
Green hydrogen projects in Southeast Asia have ambition and capital interest, but almost no signed offtake. Here is what developers in Indonesia, Malaysia, Vietnam and the Philippines need to fix before FID.
Green hydrogen technology choices in Southeast Asia compared: alkaline, PEM and ATR electrolysis on cost, efficiency, scale and bankability.
A 600 MW electrolyzer in Batam, paired with solar and batteries, is targeting pipeline exports to Singapore at $3 per kg. Here is what that price point tells you about plant design.
Ammonia can cost two to three times its grey equivalent while the end product rises only 1 to 3 percent: five possible payers of the green premium.