We Connect Asia

Category: Power-to-X

More than 300 Mtpa of low-emission ammonia is announced, but only 15 Mtpa holds a final investment decision: the market and offtake gap a developer must close.
A benchmark guide to green hydrogen production costs in 2026: the power-price-to-cost table every developer should know, the China electrolyzer cost gap, and realistic timelines for parity with grey hydrogen.
A green ammonia plant is five blocks wired together. I walk through the anatomy, the capex split and what a lender checks before FID.
A developer's walkthrough of the green hydrogen production process, from electrolyzer choice to renewable power supply, with Vietnam's seawater-electrolysis Tra Vinh plant and Sarawak's modular 10 MW project as real-world benchmarks.
Green hydrogen is made by splitting water with renewable power. I explain the basics, where projects get built and what investors check.
Hydrogen sale and purchase agreements run 10 to 15 years, and projects reach FID with 5 to 7 only when equity fills the gap: what lenders count in a tenor.
The first European Hydrogen Bank auction set a 4.50 EUR/kg ceiling and cleared at 0.40 EUR/kg: what a fixed premium buys, and what it leaves uncovered.
Only 13 percent of contracted hydrogen volumes are binding, and 9 percent of projects have committed money: the readiness checklist I run before FID.
Offtake, politics, technology and power: which risk sits with the sponsor, which with the lender, and the instrument that carries each one.