Home » Selling SAF into Singapore: The Tender Route and What It Requires
Selling SAF into Singapore: The Tender Route and What It Requires
10 min read · Nov 2, 2026 · By Alex
Selling sustainable aviation fuel into Singapore today means bidding into a single centrally procured tender financed by a national levy, open to any supplier that can deliver into the existing Changi Airport fuel hydrant installation (the pipework that moves fuel to aircraft), that meets CORSIA eligibility and at least a 40 percent reduction in lifecycle emissions (the total emissions saved from production through use compared with conventional jet fuel), and that can document price competitiveness, supply chain resilience. In addition, delivery certainty, with the first tender called in mid-December 2026 for delivery from June 2027. A tender is a formal call for bids against published rules.
In addition, the levy is a charge on air tickets that pays for the fuel. The mechanism is public and dated. I wrote this export saf singapore briefing for a pre-FID developer who needs a preparation list. In addition, I sit it inside the wider map of SAF export markets so that the Singapore route can be read next to the others.
Singapore did not leave this to individual airlines. It built one buyer, one funding stream and one published criteria set, then opened the door to suppliers who can meet them. Here is what that means for a project that has not yet reached final investment decision.
In short
- Buyer: SAFCo, established by CAAS, buys centrally for the whole Singapore market.
- Funding: the SAF levy, charged on tickets sold from 1 October 2026 for flights from 1 January 2027.
- Gates: CORSIA eligibility and at least a 40% reduction in lifecycle emissions.
- First call: mid-December 2026, an initial 20 to 30 kilotonnes, blended delivery from June 2027.
- Scoring: price competitiveness, supply chain resilience, delivery certainty, documentation and ecosystem support.
In this article
What Singapore actually buys
Singapore’s answer to early SAF adoption is a mandate plus a market. Flights departing Singapore will have to use SAF from 2026. With a 1% SAF target for a start and a goal to raise the target beyond 1% in 2026 to 3 to 5% by 2030, subject to global developments and the wider availability and adoption of SAF. On the buying side, procurement of Singapore’s SAF will be centralised, using the air ticket levies to aggregate demand and reap economies of scale. The Civil Aviation Authority of Singapore has set out the sustainability and procurement criteria for the SAF which Singapore will buy using proceeds from the SAF Levy.
In addition, the Singapore Sustainable Aviation Fuel Company shared these criteria at a briefing to potential suppliers and producers ahead of the first tender. Everything an evaluator needs is published before the call.
What this means for you: you are not selling to airlines one at a time. You are meeting a criteria set written by the regulator and executed by a single buyer.
The demand side, the levy, the target and one buyer
The levy is the plumbing that funds the whole scheme. Origin-destination passengers who buy tickets from 1 October 2026 for flights departing Singapore from 1 January 2027 will have to pay the SAF levy. The same timeline applies to general and business aviation flights. In addition, the levy must be reflected as a distinct line item in the fare breakdown. The levy on air cargo shipments is deferred by one year following industry feedback and will now apply to services sold from 1 October 2027 for flights departing Singapore from 1 January 2028. Also, the SAF levy was first announced in November 2025. In addition, its first application was deferred because of the impact of the ongoing Middle East conflict on airlines and passengers.
For scale I read the Southeast Asia SAF picture against the World Economic Forum projection that by 2030 demand for global SAF should reach 17 million tonnes per annum, approximately 4 to 5 percent of total jet fuel consumption.
What this means for you: the funding stream is legislated and dated. Therefore, I hang volume assumptions off the published levy dates rather than off a hoped-for ramp.
What one aggregated buyer does to the price
The price that airlines pay for SAF, in addition to the production costs. Incorporates add-on costs such as a market premium, logistics, certification, transaction-related costs, and markups throughout the supply chain. I break that stack down in how the SAF price is built. The CAF price index and SAF price index are provided by a price reporting agency such as Argus Media or S&P Global Commodity Insights for specific trading markets including Singapore. In addition, Argus FOB Singapore is an assessment used as the base to which logistics costs, fees. In addition, a supplier’s margin are added. IATA reported that at current price levels the SAF premium translates into an additional USD 3.6 billion in fuel costs for the industry in 2025, and that SAF prices exceed fossil-based jet fuel by a factor of two, and by up to a factor of five in mandated markets.
SAFCo will assess the tender bids based on price competitiveness, supply chain resilience and delivery certainty, as well as sustainability documentation capability. In addition, ability to support Singapore’s SAF ecosystem development.
What this means for you: one aggregated buyer can rank bids off a single published index. Therefore, I separate production cost from logistics and margin and defend each line.
The two gates your fuel must pass
Two gates decide whether your fuel is bidable at all. The SAF that Singapore procures must be eligible under the International Civil Aviation Organization’s Carbon Offsetting and Reduction Scheme for International Aviation. That sets internationally recognised sustainability criteria for cleaner energy aviation fuels. It must also achieve at least a 40% reduction in lifecycle emissions compared with conventional jet fuel. A threshold benchmarked against other jurisdictions and set above the 10% minimum under CORSIA. That allows Singapore to procure SAF produced using feedstocks and pathways that deliver larger emission reductions while maintaining access to a wide range of current and emerging feedstocks. In addition, pathways, such as SAF produced via the Hydro-processed Esters.
In addition, Fatty Acids pathway with used cooking oil and animal fats as feedstock. I set out the sustainability criteria in detail elsewhere, and SAFCo also scores sustainability documentation capability. Therefore, the paper trail sits beside the chemistry. The SAF refinery lifecycle has five critical phases: conceptualization, pre-feasibility, FID, construction and commissioning.
What this means for you: I test CORSIA eligibility and the 40% reduction first. That is because a fuel that fails either gate never reaches the price discussion.
What the tender evaluates and when
The first SAF tender will be for an initial volume of 20 to 30 kilotonnes, as part of SAFCo’s portfolio approach comprising term contracts and spot purchases. In addition, the initial volume will allow SAFCo to assess market response and inform subsequent procurement as volumes ramp up. With more tenders to be called later. In addition, the first call is due by mid-December 2026. The tender will be open to all SAF suppliers and producers which can demonstrate the ability to deliver the SAF into Changi Airport through the existing Changi Airport Fuel Hydrant Installation infrastructure and meet the applicable technical quality, as well as sustainability and procurement requirements.
SAFCo may award contracts to one or more suppliers. With successful tenderers to deliver the SAF in blended form from June 2027, and 15 companies attended the briefing to potential suppliers and producers. Because SAFCo mixes term contracts and spot purchases, I read the tender through how to secure offtake agreements, where an offtake means a forward purchase commitment between a buyer. In addition, a producer over a set term.
What this means for you: I build the delivery proof into the bid before the commercial terms. That is because hydrant access at Changi is the entry ticket.
What the offtake must look like for a lender
Investors often require at least 70 to 80 percent of annual capacity to hold offtake agreements. Some lenders require 100 percent of the SAF produced to have reliable offtake covering the full loan tenor. Long-term offtake agreements typically run between an airline and a SAF producer investing in a new or additional production facility, referring to supply further in the future, for example in 3 to 5 years, and a longer tenure, for example 5 to 10 years. I therefore treat the offtake agreement work as the hinge of any file that needs debt. SAFCo’s portfolio approach of term contracts and spot purchases means a producer will not get the whole volume on one contract.
Therefore, the file has to show how the uncontracted part is covered. Offtake contracts are often non-binding memoranda of understanding, and contractually binding agreements must exist before a project reaches FID.
What this means for you: I write the coverage table first. In addition, the price second, because a lender reads coverage before it reads margin.
Where the route is still open
Because the SAF procurement is novel. SAFCo will allow more time for potential bidders to prepare their proposals and submit their bids. I read that extension as room to assemble delivery proof and documentation rather than to redesign the project. On the supply side, the presence of an existing petrochemical sector in Singapore provides a good base for new SAF facilities in Singapore, yet given the tremendous increase in production capacity required globally there is scope for more SAF production to be based in Singapore. That will also support the needs of Changi Airport. Against that, current global supply of SAF is less than 1% of global jet fuel demand, so a first call of 20 to 30 kilotonnes is a measured start rather than a full market. The route is therefore open on two sides at once: bidders get time, and local production gets a standing invitation.
What this means for you. I use the extra preparation time to build a complete and evidenced file, not to chase a first-mover prize.
How I would work this market if it were my file
Consequently, I write three rows on one page: the regulated route, where the volume is bought by one buyer against published criteria; the voluntary route, where corporate buyers purchase the environmental attribute.e page: the regulated route, where the volume is bought by one buyer against published criteria; the voluntary route, where corporate buyers purchase the environmental attribute. In addition, the local route, where production sits next to the demand. For the regulated row I check the two gates first, CORSIA eligibility and the 40% lifecycle reduction. That is because a fuel that fails either of them is not bidable. Then I check the delivery proof, the hydrant installation at Changi Airport, and I price the logistics cost separately from the production cost. I keep the volume row honest at the announced initial range.
\n
In addition, I do not model the ramp beyond what has been published. The voluntary and local rows stay on the same page because they change the same file, one testing documentation and registry tracking, the other testing site and feedstock.
What this means for you: I would rather bring a lender one defensible row than three optimistic ones.
Sources
\n
- \n
- CAAS, 5 November 2026.
- Singapore Sustainable Air Hub Blueprint, 2024.
- Biofuels International, consulted 15 November 2026.
- IATA, 12 May 2024.
- IATA, 9 December 2025.
- World Economic Forum, February 2025.
\n
\n
\n
\n
\n
\n
Frequently asked questions
Who buys SAF in Singapore?
The Civil Aviation Authority of Singapore sets the sustainability and procurement criteria, and the Singapore Sustainable Aviation Fuel Company, established by CAAS, procures centrally using proceeds from the SAF Levy. SAFCo’s stated aim is a transparent and integrated SAF demand market that brings together airlines, corporate buyers of SAF, fuel producers, carbon market platforms and stakeholders across the aviation fuel chain, so that aggregated demand is what allows scale to be reaped rather than left to chance.
What are the sustainability criteria for SAF supplied to Singapore?
Two gates. The fuel must be eligible under ICAO’s Carbon Offsetting and Reduction Scheme for International Aviation, and it must achieve at least a 40% reduction in lifecycle emissions compared with conventional jet fuel, which is above the 10% minimum under CORSIA. Meeting both keeps the door open to feedstocks and pathways such as HEFA with used cooking oil and animal fats, and it also requires the documentation to prove the claim in the bid file.
How much SAF does Singapore require?
Flights departing Singapore are required to use SAF from 2026 with a 1% SAF target for a start and a goal to raise the target beyond 1% in 2026 to 3 to 5% by 2030, subject to global developments and the wider availability and adoption of SAF. The first tender covers an initial volume of 20 to 30 kilotonnes for delivery in blended form from June 2027, with more tenders to be called later as volumes ramp up.
Can a foreign producer bid for the Singapore tender?
Yes. The tender is open to all SAF suppliers and producers that can demonstrate the ability to deliver the SAF into Changi Airport through the existing Changi Airport Fuel Hydrant Installation infrastructure and meet the applicable technical quality, as well as sustainability and procurement requirements. SAFCo may award contracts to one or more suppliers, so a foreign producer bids on the same published terms as a local one, provided the delivery proof and the documentation are in the file.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you are putting a bid file together. I can test the criteria mapping, the delivery proof and the coverage table before you submit, and my investor introductions service connects pre-FID developers with funders who read these files for a living.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.