Selling SAF into the United Kingdom: An Obligation on Suppliers, Not on You

10 min read  ·  Nov 2, 2026  ·  By Alex

export saf united kingdom

The United Kingdom is open to me as a producer of sustainable aviation fuel, but the legal duty does not sit on me: it sits on the fuel supplier. I reach this market through a supply contract with an obligated supplier, meaning a fuel supplier registered under the mandate, not through a free sale. The SAF Mandate has been in force since 1 January 2025, starts at 2% of total UK jet fuel demand in 2025, rises linearly to 10% in 2030 and then to 22% in 2040, pays suppliers in tradeable certificates, meaning certificates carrying a cash value for verified volumes, adds a power-to-liquid sub-obligation, meaning fuel made from low carbon power, of 0.2% of total jet fuel from 2028 rising to 3.5% in 2040, and caps HEFA from 1 January 2027. That is the frame I use for an export SAF United Kingdom plan, and I start from the wider SAF export picture.

Those percentages are imposed on supply in aggregate, not on any single factory. I read them as a demand signal I can sell into, and I keep two questions apart: what the obligation asks of the supplier, and what the certificates and the contracts pay me for my volume.

In short

  • Demand: 2% of total UK jet fuel demand in 2025, rising linearly to 10% in 2030 and 22% in 2040.
  • Who is bound: fuel suppliers from 15.9 terajoules supplied in a year; airlines and airport operators are not bound.
  • What counts: at least 40% lifecycle greenhouse gas reduction, in HEFA, non-HEFA or power-to-liquid.
  • Extra duty: power-to-liquid starts at 0.2% in 2028 and reaches 3.5% in 2040, on top of the main obligation.
  • My route: a long-term supply contract with an obligated supplier, certified and independently verified.
Facebook
Twitter
LinkedIn

In this article

What the UK actually requires

The SAF Mandate is the United Kingdom’s key policy to decarbonise aviation fuel, published by the Department for Transport. It secures demand by obligating the supply of an increasing amount of SAF in the overall UK aviation fuel mix while incentivising supply through tradeable certificates with a cash value. The mandate starts in 2025 at 2% of total UK jet fuel demand, increases linearly to 10% in 2030 and then to 22% in 2040, and from 2040 the obligation remains at 22% until there is greater certainty regarding SAF supply. The department estimates the mandate could deliver up to 6.3 megatonnes of carbon savings per year by 2040. Clifford Chance records that the mandate came into effect on 1 January 2025 and is expected to draw investment into the SAF supply chain, including production projects, by legally mandating gradually increasing levels of demand from jet fuel suppliers. Registration applies to a company that owns and supplies 15.9 terajoules or more of relevant aviation turbine fuel for use in the UK during an obligation year running 1 January to 31 December.

What this means for you: the demand I can sell into is written by statute against suppliers, so my commercial work starts with the companies that hold a mandate account.

Who carries the obligation

I start with the worldwide list of SAF mandates, because the duty here falls on aviation fuel suppliers, not on airlines or airport operators, and it is triggered at the duty point for jet fuel, meaning the point of supply at which the charge arises, or at the point of sale for hydrogen. The registration threshold is 15.9 terajoules, approximately 460,000 litres, of aviation turbine fuel supplied in a year, and for suppliers whose obligated amount sits between 15.9 and 344 terajoules, approximately 10 million litres, there is no obligation on the first 15.9 terajoules supplied. Watson Farley & Williams notes that under ReFuelEU there is no fixed volume threshold and that airline operators are directly subject to obligations, which they are not under the UK regime. Transport & Environment counts eight SAF mandates adopted worldwide, including in the EU, the UK, India and Brazil, with proposals being discussed in seven countries including China, South Korea, the United Arab Emirates and Turkey. So the contract I look for is with the obligated supplier, not with the airport.

What this means for you: I negotiate with the fuel supplier that holds the account, because that is the party the statute charges and the party able to buy my volume to close its own gap.

What counts as SAF in the UK

The mandate defines SAF as fuels that reduce greenhouse gas emissions from aviation by a minimum of 40% over the lifecycle of the fuel when compared to standard jet fuel, on an 89 gCO2e/MJ comparator. It categorises SAF into three types: HEFA developed from oils or fats such as used cooking oil or forestry residues, non-HEFA fuels derived from waste or residues such as municipal solid waste, and power-to-liquid fuels made from low carbon power sources. Eligible SAF must be made from sustainable sources, wastes or residues and cannot be produced from new food, feed or energy crops, and blue hydrogen is not an eligible feedstock. The use of HEFA to meet the main obligation starts to be capped on 1 January 2027 and decreases annually so that HEFA can only meet a falling share of the obligation. Watson Farley & Williams puts the UK rules next to ReFuelEU Aviation, which came into force on the same day at 2% in 2025, applies to flights departing from EU and EEA airports and excludes crop-based biofuels from the incentives.

What this means for you: my volume has to be labelled against one of the three categories before I price it, because the HEFA cap changes the value of that answer from 1 January 2027.

The certificate, the sub-obligation and the price

The main obligation requires 2% of total fossil jet fuel supplied, approximately 230 thousand tonnes per annum, to be SAF in 2025, rising annually to 10% in 2030 and 22% by 2040; the annual trajectory runs through 3.60% in 2026, 5.20% in 2027 and 6.80% including the sub-obligation in 2028. The power-to-liquid obligation starts in 2028 at 0.2% of total jet fuel supplied and increases annually to 3.5% in 2040, and it sits on top of the main obligation rather than inside it. IATA states that the EU and the UK have mandated e-SAF production of around 0.6 million tonnes by 2030, while global e-SAF capacity currently operating and under construction stands at around 0.02 million tonnes with only one single production site in operation, and that approximately 20 commercial-scale refineries would be needed to reach that volume; no new final investment decisions for e-SAF facilities have been made over the past year. Its Senior Vice President Sustainability and Chief Economist calls those 2030 e-SAF targets beyond unrealistic. Transport & Environment notes that only a few frameworks actively promote e-kerosene: the EU, the US and the UK.

What this means for you: I price the fuel and the certificate separately, and I never fold the power-to-liquid duty into one headline percentage.

What a finance plan has to survive

Clifford Chance records that the government confirmed details of a SAF Revenue Certainty Mechanism for producers, that framework legislation was proposed to Parliament on 14 May 2025 and is expected to become law by the end of 2026, and that the mechanism takes the form of a contract for difference, which in plain words means the state pays a fixed price for a contracted volume rather than the market price, with similarities to the renewable energy scheme. Norton Rose Fulbright records an Advanced Fuels Fund giving grant funding to first-of-a-kind SAF projects, alongside a contract-for-difference style mechanism in development to guarantee a fixed SAF price over time. The same source states that there is not yet an established wholesale market for SAF with a predictable and discoverable market price, so long-term offtake agreements with airlines or jet fuel providers remain critical. IATA argues that any SAF mandates should be introduced only where the necessary market conditions, production capacity, infrastructure readiness and supportive policy measures are sufficiently in place.

What this means for you: in the way I approach financing a SAF project, a UK file needs the certificate value, the contract for difference strike and the offtake price on three separate lines.

Where the risk sits today

SAF currently represents less than 1% of global aviation fuel use and is several times more expensive than conventional aviation fuel because of more expensive feedstocks, developing production technologies and high upfront investment needs (IATA, June 2026). In a separate IATA release, global SAF production is expected to reach around 2.4 million tonnes in 2026, representing just 0.8% of aviation fuel use, at a cost to airlines of $4.3 billion (IATA, 6 June 2026). Transport & Environment notes that e-kerosene accounts for around 15% of European airlines’ SAF volumes and 5% of North American airlines’ volumes, that only airlines based in Europe and North America have offtake agreements and memoranda of understanding involving e-kerosene, and that no airport is currently expected to supply e-kerosene. I read the policy risk in one line: the HEFA cap from 2027 meets a power-to-liquid sub-obligation from 2028 while only one e-SAF production site is operating anywhere.

What this means for you: I test my delivery plan against that collision before I sign, because a category I can sell today may be capped after 1 January 2027 and measured against a new duty from 2028.

What I would ask before signing

I ask four questions in writing. First, which obligated supplier signs, and does that supplier hold a mandate account. Second, which of the three SAF categories my volume counts as, because the HEFA cap changes the value of the answer after 1 January 2027. Third, what the certificate is worth in the year of delivery, and whether the contract for difference is in force for that year yet. Fourth, what the compliance test is, since claims under the mandate must be independently verified by a recognised verifier or a voluntary scheme, and the department publishes lists of voluntary schemes and of recognised third party verifiers. I add one technical check: SAF must be certified under ASTM D7566 before blending, and the ISCC and RSB schemes can differ on feedstock, which affects fungibility and tradeability. I do not merge the main obligation and the power-to-liquid obligation into one percentage.

What this means for you: I want those four answers on paper, with the verifier and the certification scheme named, before I commit a single tonne of production.

How I would model it if it were my file

I run two rows. The demand row carries 2% in 2025, 10% in 2030 and 22% in 2040, with the annual figures of 3.60% in 2026 and 5.20% in 2027 sitting inside it. The supply row carries the HEFA cap from 1 January 2027 and the power-to-liquid sub-obligation of 0.2% from 2028 rising to 3.5% in 2040. I date every line with the instrument that produced it, I price the certificate separately from the fuel, and my last row is the signed offtake with an obligated supplier, because that is the only row a lender will count. I keep a further column for certification and verification, since a claim that fails the recognised verifier’s test earns nothing, and I flag that the mandate sits alongside the Renewable Transport Fuel Obligation in the government’s low carbon fuel strategy.

What this means for you: my sheet ends with a signature, not with a percentage, and every percentage above it is dated to the rule that created it.

Sources

Frequently asked questions

It is a legal obligation on UK aviation fuel suppliers, in force since 1 January 2025, requiring SAF to rise from 2% of total UK jet fuel demand in 2025 to 10% in 2030 and 22% in 2040, rewarded with tradeable certificates that have a cash value for independently verified claims. It applies to fuel suppliers from 15.9 terajoules of aviation turbine fuel supplied in an obligation year, and the department estimates the mandate could deliver up to 6.3 megatonnes of carbon savings per year by 2040 (Department for Transport; Clifford Chance).

A separate power-to-liquid obligation starts in 2028 at 0.2% of total jet fuel supplied and rises to 3.5% in 2040, additional to the main obligation, whose trajectory runs through 6.80% including the sub-obligation in 2028. It sits against a global e-SAF capacity operating and under construction of around 0.02 million tonnes with one site in operation (Clifford Chance; IATA, 6 June 2026).

Not directly: the obligation sits with fuel suppliers holding a mandate account from 15.9 terajoules, about 460,000 litres, and a foreign producer reaches the market through a supply contract with one of them. The trigger is the duty point for jet fuel, so the charge attaches to that supplier, and my certification must meet the mandate definition of at least 40% lifecycle greenhouse gas reduction (Clifford Chance; Department for Transport).

It secures demand and it adds the Advanced Fuels Fund grants plus a contract-for-difference style mechanism in development to guarantee a fixed SAF price over time, but there is still no established wholesale market with a predictable price, so bankability still rests on long-term offtake terms (Norton Rose Fulbright). The framework legislation behind that mechanism was proposed to Parliament on 14 May 2025 (Clifford Chance).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you want to see which UK contract shape fits your volume, I set it out in my offtake agreements work, where I place the certificate value, the verification test and the delivery schedule against the mandate account of the supplier I would sign with.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles