We Connect Asia

SAF

SAF Myths and Criticisms: What Investors Should Actually Believe

10 min read  ·  Nov 2, 2026  ·  By Alex

saf myths

Of the four criticisms I hear most about sustainable aviation fuel, two I take seriously and two I settle with published numbers. I accept that SAF is not carbon-neutral by nature and that a certificate is not the molecule in the wing. The other two collapse against what is published: the fuel is still under 1% of global aviation fuel use, so the problem is scale rather than trickery, and a cost of 2 to 5 times fossil jet fuel is a published number that a contract has to carry. I keep that split in front of me as I work through the SAF myths in one file, starting from the fuel itself.

Every criticism that reaches me at concept stage contains a real observation and a conclusion, and the two come apart. I separate them in the order a committee reads: first the two I settle with a published figure, then the two I accept and price.

In short

  • Two founded: SAF is not carbon-neutral by nature, and a certificate is not the fuel in the wing.
  • Two settleable: the fuel is under 1% of global aviation fuel use, and it costs 2 to 5 times conventional jet fuel.
  • Scale: about 2.4 million tonnes in 2026, or 0.8% of aviation fuel use (IATA, 6 June 2026).
  • Criteria: feedstock, land use, biodiversity, water and accounting, with traceability and independent verification (IATA, June 2026).
  • My test: a published rule, a published number with a date, and a contract clause carrying the risk.
Facebook
Twitter
LinkedIn

In this article

1. The short answer: two founded, two settleable

Sustainable aviation fuel is a drop-in fuel: it can replace fossil jet fuel with minimal changes to aircraft and infrastructure, and most engines today are certified to use a 50% blend without modification (ICCT, October 2025). In 2025, SAF made up about 0.6% of jet fuel used globally (ICCT, October 2025). It still represents less than 1% of global aviation fuel use and is several times more expensive than conventional aviation fuel (IATA, June 2026).

I accept two criticisms and answer two. I accept that no SAF is carbon-neutral by nature and that a certificate is not the fuel in the wing, and I answer the share and the multiple with the figures above. The two I accept I meet with criteria and contract language, the two I settle I meet with a figure and a date.

What this means for you: my committee paper opens with that split, so every number that follows is read against the column it belongs to.

2. Myth one: it is a label that changes nothing

Worldwide, aviation accounts for 2% of all carbon dioxide and 12% of all carbon dioxide from transportation, and CORSIA caps net CO2 from aviation at 2020 levels through 2035 (US Department of Energy, consulted 16 November 2026). SAF is estimated to provide around 65% of emission reductions needed to reach net zero CO2 emissions by 2050 (IATA, June 2026). It presents the best near-term opportunity to meet the goals for SAF usage set by the international aviation industry (US Department of Energy, consulted 16 November 2026). It can also strengthen a country’s energy security by diversifying the energy supply and building domestic fuel production from locally available resources (IATA, June 2026).

What converts a label into a buyer is a mandate, meaning a legal duty to blend a set share of SAF into the fuel sold, and the mandate page carries that rule. IATA lists production incentives, grants, loan guarantees, supportive regulatory frameworks and policies that facilitate access to feedstocks and infrastructure (IATA, June 2026), and adds that mandates should be introduced only where the necessary market conditions, production capacity, infrastructure readiness and supportive policy measures are sufficiently in place (IATA, June 2026).

What this means for you: the label becomes revenue only when a rule obliges someone to buy, so I read the conditions attached to that rule before I value the fuel above it.

3. Myth two: it is unaffordable, so it will never happen

SAF currently costs 2 to 5 times more than conventional jet fuel because of high production costs, limited availability, costly feedstocks and complex processes, and all pathways are expected to remain more expensive than fossil jet fuel (ICCT, October 2025). Scale gives the same point in money: global SAF production is expected to reach around 2.4 million tonnes in 2026, representing just 0.8% of aviation fuel use, at a cost to airlines of $4.3 billion (IATA, 6 June 2026).

Production has been rising anyway, from about 0.04 million tonnes in 2020 to about 1.9 million tonnes in 2025, around 0.6% of global jet fuel, with about 2.4 million tonnes projected for 2026 (IATA, June 2026). Lowering costs requires public and private investment, demand-side strategies such as mandates and long-term offtake agreements, and cost-sharing mechanisms (ICCT, October 2025). A price that is published and falling into a rule is a contracting problem, and the arithmetic sits in the price page.

What this means for you: I do not argue affordability in the abstract, I ask which contract carries the multiple and what happens to my return if that multiple moves.

4. Criticism one: not every SAF cuts much carbon

When made from waste materials like used cooking oil or tallow, SAF can cut life-cycle emissions, meaning the total carbon a fuel releases from feedstock to combustion, by up to 80% compared with fossil jet fuel, but those materials are limited, and crop-based SAF from corn or palm oil can lead to emissions similar to or higher than fossil fuels (ICCT, October 2025). No SAF is inherently carbon-neutral, and fuels made from slow-growing trees may create a carbon debt, which is carbon released at clearing that takes many decades of growth to offset (ICCT, October 2025). The UK and the EU have restricted the types of SAF that can qualify for mandates and incentives (ICCT, October 2025).

This criticism is founded, and my answer sits in criteria rather than in rhetoric: SAF must meet sustainability criteria and certification requirements covering feedstock sourcing, land-use change, biodiversity protection, water use and emissions accounting, with traceability and independent verification throughout the supply chain (IATA, June 2026). A proof of sustainability, which is a document tracing the feedstock and the claimed reduction through that chain, is where I read those tests, and the criteria page sets them out.

What this means for you: I price the pathway behind the barrel, not the label on it, and I ask for the verification chain before I accept any volume forecast.

5. Criticism two: the certificate is not the fuel

Airlines receive credit for SAF use through sustainability certificates, which help prevent double counting, meaning the same reduction claimed by two parties, and ensure emissions benefits are assigned correctly (ICCT, October 2025). When passengers pay for SAF upgrades, airlines can retire certificates on their behalf, but outside regions with SAF blending mandates most SAF credits are sold to corporations, meaning the business’ carbon footprint, and not that of individual passengers, is reduced (ICCT, October 2025).

The criticism is fair: a paper transfer does not move a molecule into a wing. What I check is which of the two I am buying, and the mechanism, a book and claim system where the fuel is lifted in one place and the benefit is claimed in another, is set out in the book and claim page. IATA states that governments should support the development and recognition of global SAF book-and-claim systems, consistent with the purchase-based claiming approach allowed under CORSIA (IATA, June 2026).

What this means for you: I read who retires the certificate and against which rulebook, and I treat any claim without those two names as unfinished work.

6. The objection about the next aircraft

Battery-electric aircraft remain limited to serving short routes of less than 500 km, and jet fuel still carries about 43 MJ/kg against 0.9 to 1.0 MJ/kg for the most advanced lithium-ion battery (ICCT, May 2025). Airbus pushed back its goal to introduce hydrogen-powered commercial aircraft in 2035 by 5 to 10 years, citing infrastructure challenges and slower-than-expected technology development (ICCT, May 2025). Inadequate hydrogen infrastructure remains a roadblock to that program, and green hydrogen comprised less than 1% of global hydrogen production in 2024 (ICCT, May 2025).

SAF is expected to play a larger role in near- and medium-term aviation decarbonization than zero-emission aircraft (ICCT, October 2025). Even with optimistic sustainable aviation fuel and fuel efficiency assumptions, the net-zero carbon target could be exceeded as early as 2037 (ICCT, May 2025). The objection is fair about the timetable, and it still does not remove the fuel from the plan that exists today.

What this means for you: I model the aircraft that will not arrive this decade as upside rather than as my base case, and I keep the fuel that is certified today in the numbers.

7. What I ask before I believe a criticism

My test has three questions: is there a published rule, is there a published number with a date, and is there a contract clause that carries the risk if the number moves. The scale gap answers them in the other direction: the EU and the UK have mandated e-SAF production of around 0.6 million tonnes by 2030, global e-SAF capacity operating and under construction stands at around 0.02 million tonnes with only one single production site in operation, it would take approximately 20 commercial-scale refineries to achieve the mandated volume, and no new final investment decisions for e-SAF facilities have been made over the past year (IATA, 6 June 2026).

Deployment is real as well: over 360,000 commercial flights have used SAF at 46 different airports (US Department of Energy, consulted 16 November 2026). I write the three questions down before a committee meets, in the final investment decision page.

What this means for you: a criticism that survives all three questions enters my paper as a risk with a clause attached, not as a debate I reopen in the room.

8. How I would run this if it were my file

I keep two columns in my committee paper: what a criticism is worth, and what it would cost me to ignore it. For each line I write the published source, the date of that source, and the clause I would ask for if the criticism survives. The two founded criticisms sit in the second column with a clause each, the two settleable ones sit in the first with their figure and date attached. Nothing enters the paper without one of those three entries, and nothing leaves it because a criticism was uncomfortable to read.

What this means for you: I hand the committee a file that names what I accepted, what I answered with a number, and what each answer costs if it turns out to be wrong.

Sources

Frequently asked questions

No. No SAF is inherently carbon-neutral, and fuels made from slow-growing trees may create a carbon debt that takes many decades of growth to counteract. Waste-based pathways such as used cooking oil can cut life-cycle emissions by up to 80% compared with fossil jet fuel, and emerging technologies could push those reductions above 90% (ICCT, October 2025; IATA, June 2026).

It is the main lever that exists today. SAF is estimated to provide around 65% of the emission reductions needed to reach net zero CO2 by 2050 (IATA, June 2026). CORSIA caps net CO2 from aviation at 2020 levels through 2035, and the fuel presents the best near-term opportunity to meet the goals set by the international aviation industry (US Department of Energy, consulted 16 November 2026). It still stands at less than 1% of global aviation fuel use (IATA, June 2026).

The gap is real, and published numbers show it. Production is expected at around 2.4 million tonnes in 2026, for 0.8% of aviation fuel use, at a cost to airlines of $4.3 billion (IATA, 6 June 2026). e-SAF capacity operating and under construction stands at around 0.02 million tonnes against a mandated 0.6 million tonnes by 2030, and no new final investment decisions have been made over the past year (IATA, 6 June 2026).

Not by itself: certificates help prevent double counting and ensure emissions benefits are assigned correctly (ICCT, October 2025), and CORSIA allows purchase-based claiming (IATA, June 2026). Outside mandates most SAF credits are sold to corporations, so the business’ footprint, and not that of individual passengers, is reduced (ICCT, October 2025). I therefore check who retires the certificate and against which rulebook.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If your committee paper needs this criticism list tested against the published record before the meeting, I set up the investor introductions that carry the conversation from paper to file. I work at concept stage, where the framing of a criticism still changes what gets financed.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles