We Connect Asia

Hydrogen

Hydrogen Standards and Certification: What an Acquirer Actually Checks

10 min read  ·  Nov 21, 2025  ·  By Alex

hydrogen standards and certification

Before I sell a kilo, a buyer asks what stands behind it and who checked it. That question decides whether a volume can enter a compliance market at all. Hydrogen standards and certification are how the answer is produced: an acquirer checks the emissions intensity of the production route, meaning kilograms of CO2 equivalent per kilogram, against a threshold, the numeric line it must fall below, the chain of custody, the audited trail that keeps a claim attached to the volume, and whether the scheme behind it is recognised where the contract will be performed. For green hydrogen, that certificate, a third-party statement that a stated volume meets a stated standard, is the only portable proof once the gas itself is gone.

I will order this in six moves: what a certificate has to prove, what is actually measured, what thresholds look like side by side, what European rules require, what a voluntary scheme adds in practice, and what an Asian buyer asks. Each move answers one of the three checks above.

In short

  • Claim: A certificate turns a claim into something a third party can check, and it holds only while chain of custody links it to the kilos.
  • Measurement: Everything turns on emissions intensity, kilograms of CO2 equivalent per kilogram, measured well-to-gate against a threshold.
  • Gap: Eight voluntary and five mandatory schemes were assessed in 2023 and none was suitable for cross-border trade.
  • Europe: Two delegated acts in June 2023 set additionality, correlation, at least 70 percent savings and recognition through voluntary schemes.
  • Asia: In 2025 Japan tests 3.4, South Korea caps 4 across 4 grades, and India requires 2, all well-to-gate.
Facebook
Twitter
LinkedIn

In this article

Why a buyer asks for a certificate at all

Certificates carry compliance with standards and regulatory requirements and enable verification of sustainability criteria, which lets buyers signal demand for lower-carbon product in 2023. Colour labels have proved impractical for the contracts that underpin investment in 2023.

The vocabulary in plain words: a certificate is a third-party statement that a stated volume meets a stated standard; a guarantee of origin records the renewable source behind electricity; a voluntary scheme is a private label with no legal force; a recognised scheme is one a regulator has formally accepted; a threshold is the line a volume must fall below; emissions intensity is kilograms of CO2 equivalent emitted per kilogram; well-to-gate counts from resource extraction to the plant gate; chain of custody is the audited trail linking claim to kilo; book and claim moves the attribute on paper while gas moves as gas; mass balance tracks volumes through a shared system; RFNBO means renewable fuel of non-biological origin.

What this means for you: before feasibility work reaches a lender, I write down which certificate the buyer will accept, since plant design and power purchase structure follow that choice.

What a scheme has to prove

The IRENA and RMI assessment of 2023 examined eight voluntary and five mandatory schemes and found that none of the existing hydrogen certification systems is suitable for cross-border trade. Technical criteria vary in scope, emissions threshold and accounting method, so the same label may not mean the same product in two schemes.

Four gaps were named in 2023: greenhouse gas information, common standards, ecolabelling, and compliance with environmental, social and governance criteria. The same assessment drew a line I use constantly, because a guarantee of origin certifies origin while some planned schemes certify intensity without applying any threshold at all. It recommended a modular approach along the supply chain, a single calculation methodology for all production pathways, and a process for mutual recognition between schemes. Until that process exists, what counts as a renewable molecule is settled contract by contract.

What this means for you: I ask which scheme name appears in the term sheet and whether the buyer’s regulator accepts it there.

What is actually measured

One number carries the case: emissions intensity, meaning kilograms of CO2 equivalent emitted per kilogram, counted well-to-gate from resource extraction to the plant gate. The IEA study of April 2023 put global production at 12 to 13 kg CO2-eq per kilogram in 2023.

In that April 2023 study, unabated natural gas gives 10 to 14 kg CO2-eq per kilogram, coal gasification without capture 22 to 26, an electrolyser on the average global grid 24, and the same electrolyser on a grid at 40 g CO2-eq per kilowatt hour 2. Renewable electricity gives 0, capture around 60 percent gives 5 to 8, and capture above 90 percent could give 0.8 to 6, with no plant of that kind operating in 2023. It sets no generic acceptable threshold, arguing that a common methodology is what makes schemes interoperable. That is why my compliance and carbon intensity work starts with the method.

What this means for you: I ask for the calculation method behind any figure before I accept it into a model.

What the thresholds look like side by side

As assessed in 2023, five schemes produce five lines:

  • United Kingdom: 20 gCO2eq per megajoule in 2023, roughly 2.4 kgCO2eq per kilogram, path-neutral at the point of production.
  • Chinese industry scheme: low-carbon hydrogen capped at 14.51 kgCO2eq per kilogram in 2023, clean and renewable hydrogen at 4.9.
  • German scheme: 2.7 for non-transport use and 2.8 for transport in 2023, using mass balance to track volumes through a shared system.
  • International green hydrogen standard: 1.0 in 2023.
  • European voluntary scheme: 4.4 for both its green and its low-carbon scope in 2023, using book and claim.

A threshold hides its system boundary, because where one scheme stops counting another keeps going, so equal numbers do not describe equal physics.

Two certificates carrying the same word are therefore not comparable: one can stop at the plant gate while another counts the electricity generated upstream.

What this means for you: I ask for the system boundary in writing before I compare two offers.

What Europe requires

The European Commission adopted two delegated acts in June 2023 that apply to domestic producers and to exporters sending renewable hydrogen into the Union. Producers must add renewable electricity through power purchase agreements with new and unsupported capacity, and produce when and where that electricity is available, with long-term contracts covering existing installations until 1 January 2028 and a review in July 2028. The floor is at least 70 percent greenhouse gas savings, and the second delegated act fixes the life-cycle calculation method.

The same rules expect renewable fuels of non-biological origin, made from renewable electricity rather than biomass, to cover at least 1 percent of transport energy by 2030 and 42 percent of the hydrogen used in industry, rising to 60 percent in 2035. Certification runs through voluntary schemes recognised by that regulator, which EU countries must accept, and those percentages feed the low carbon fuel mandates.

What this means for you: I check which recognised scheme covers the export route before I commit to a delivery year.

What a voluntary scheme adds in practice

CertifHy builds its low-carbon scope on the Hydrogen and Gas Decarbonisation Package and on the methodology of the delegated regulation in force since December 2025. Four principles carry it: life-cycle accounting, savings measured against an EU fossil comparator, traceability and chain of custody, and independent verification by an auditor separate from the body issuing certificates.

European recognition remains pending in 2026, while a French decision of 9 October 2026 granted transitional recognition for the electrolytic pathway only, with carbon capture routes not covered at that stage. A scheme that is pending at Union level and recognised in one country is still useful, but only where that recognition applies. Precertification is available meanwhile, so the production process has to be documented as it is built.

What this means for you: I confirm which pathway is covered before I price a route that depends on capture.

What an Asian buyer asks for

The Research Institute for Sustainability study of November 2025 reports three national tests. Japan applies 3.4 kg CO2-equivalent per kilogram across all production pathways in 2025 as the test for public funding, while having no national certification system. South Korea caps its Clean Hydrogen Certification System at 4 kg CO2 eq per kilogram in 2025 across 4 grades, pathway-neutral, while its funding scheme requires 20 percent co-firing and its second tender was cancelled in mid-October 2025. India requires 2 kg CO2 eq per kilogram and renewable-only production as a condition of its funding in 2025.

All three count only well-to-gate emissions, so transport, conversion and energy losses sit outside the certificate, which matters in countries expecting large imports. A kilo certified at the plant carries a different footprint once it is converted into an e-fuel.

What this means for you: I ask where the certificate stops before I compare an import offer with a domestic one.

The order I certify in

Three mechanisms were working towards international recognition in 2023, and in the same year the pattern was settled: certificates are issued and registered while a separate auditing body checks compliance, and certificates stay tradable until expiry or consumption. Certification is essential to trade in 2023 because it shows compliance and allows verification. Most mechanisms are designed for one country or region in 2023, which is why recognition travels slowly. The pending European recognition and the French transitional decision of 9 October 2026 show a framework still moving in 2026.

What this means for you: I check four things before I promise a certified volume: the threshold in the contract, the accounting method behind it, the system boundary the certificate covers, and whether the scheme is recognised where the gas will be delivered. I verify each against the auditor’s own scope rather than a brochure. If one fails, I say so before I price anything.

Sources

Frequently asked questions

A third-party confirmation that a volume meets a stated standard, covering its emissions intensity and, where required, its renewable origin, recorded in a register and checked by an auditor in 2023. The register and the auditor are what separate a certificate from a marketing claim. The certificate travels separately from the gas, since it stays tradable until expiry or consumption in 2023.

Renewable hydrogen must come from additional renewable electricity purchased through power purchase agreements and deliver at least 70 percent greenhouse gas savings, while low-carbon hydrogen delivers the savings without meeting those two further conditions, as the rules set in 2023 require. The savings figure is a life-cycle measure against a fossil comparator in 2023.

If the contract sits in a compliance market, yes. The rules in force from June 2023 require certification through schemes recognised by the regulator, and they apply to producers exporting into the Union as well as to domestic ones. A national programme in Asia also makes certification a condition of public funding in 2025.

Not yet. Of eight voluntary and five mandatory schemes assessed in 2023, none was suitable for cross-border trade, and mutual recognition between schemes remains a recommendation rather than a working process. Until mutual recognition works, I expect a separate certification process for each client and each market.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are at feasibility stage and need to know which scheme your buyer and your lender will accept, that is exactly the compliance and carbon intensity work I do, and I would rather run it before the plant design freezes than after a term sheet is signed.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles