Home » South Korea Clean Hydrogen Power Bidding: What the First Auction Actually Bought
South Korea Clean Hydrogen Power Bidding: What the First Auction Actually Bought
10 min read · Oct 2, 2026 · By Alex
Korea’s clean hydrogen power bidding market offered up to 6,500 GWh for a 15-year contract in its first round in 2024. In fact, six plants from five companies bid a net 6,172 GWh. In addition, one plant bidding 750 GWh a year won the award. Therefore, the mechanism does create a contracted buyer. However, it bought a fraction of what it offered and it prices fuel quality into the score. I keep my screening notes in the hydrogen, PtX and e-fuels hub. The South Korea clean hydrogen power bidding rules are what I read when a supplier asks whether this market is worth structuring. That question usually comes before a final investment decision. I date everything below to the month or year it happened. Therefore, I separate the offer from the purchase at every step.
What this article covers
I order the piece the same way every time. It starts with what the auction puts up and what the first round returned. Then what fuel qualifies, how the volumes moved afterwards, and what the demand signal is worth. In addition, the checks I run before I let a number into a model.
In short
- The offer: Up to 6,500 GWh were put up in 2024 for a contract running 15 years from commercial operation.
- The award: Six power plants from five companies bid a net 6,172 GWh in 2024, and one plant bidding 750 GWh a year won selection.
- The fuel rule: 4 kg CO2eq or less per 1 kg of hydrogen, with a minimum co-firing mixture rate of 20 per cent in 2024.
- The drift: the state opened 3,000 GWh a year in 2025 and proposed 500 GWh a year for 2026.
- My checks: offered against awarded, where the fuel comes from, how the volume moves, what the contract can take away.
In this article
What a clean hydrogen power auction buys
A clean hydrogen power bidding market is a public process. In it a power exchange buys electricity generated from certified clean hydrogen for a fixed number of years. A portfolio standard is the rule that obliges the system to contract that generation. A clean hydrogen certification standard is the threshold the fuel must meet, in Korea 4 kg CO2eq per 1 kg of hydrogen. A bid is the volume and price a generator offers. The bidding volume is what the state puts up for sale.
In fact, it is not the same as what it buys. The contract period is the number of years the winner receives payment from commercial operation. Commercial operation is the moment the plant starts delivering. Co-firing means burning ammonia with coal or hydrogen with gas. A clean hydrogen grade is the scoring band the fuel falls into. A price adjustment is a contractual correction when the plant misses what it promised, and contract termination is the end of the contract for cause.
An auction creates a buyer, and the only question worth asking is how much it actually bought (2024).
What this means for you: I do not treat an auction notice as demand. I treat it as a menu. Also, I read the award line before I price a single tonne of fuel against it.
What Korea put on the table
The Kim and Chang note of June 2024 sets out the notice of 24 May 2024. That notice followed an amendment to the Hydrogen Act in June 2022, which entered into force on 30 November 2023. The note also covers the clean hydrogen certification notification. Specifically, the state offered up to 6,500 GWh for 15 years from commercial operation. In coal-ammonia co-firing the contract can run for the remaining life of the plant. The winner has three years from contract signing to prepare. In the launch year, delay penalties do not apply until 48 months. Eligibility covers coal-ammonia co-firing, gas-hydrogen co-firing and pure hydrogen generation. Also, co-firing needs a minimum mixture rate of 20 per cent on a higher heating value basis. A monthly miss brings a price adjustment, and a yearly miss can end the contract.
How the state scores a bid
The scoring gives 60 per cent to price and 40 per cent to non-price factors. Within the non-price half, greenhouse gas reduction takes 45 per cent, industry and economy 15 per cent. Moreover, business reliability takes 22 per cent, resident acceptability and project progress 13 per cent, and grid receptivity 5 per cent. Inside the greenhouse gas factor the emission coefficient carries 10 points. In addition, the clean hydrogen grade 35 points, graded 35, 32, 8 and 1 points for grades 1 to 4.
Registration ran from 7 to 18 October 2024, bids closed on 8 November 2024. Also, the state announced winners in December 2024. In addition, the state terminates a contract if the winner executes under 30 per cent of the budget within 18 months. I read that alongside the grants and incentives available to hydrogen projects. The scoring system pays for fuel quality as much as for volume (2024).
What this means for you: A cheap bid on dirty fuel loses. If I sell into this market, my grade determines the score as much as my price does. Certification therefore comes before commercial negotiation.
What the first round returned
The December 2024 results announcement records that the Korea Power Exchange published results on 2 December 2024. It calls the scheme the world’s first clean hydrogen power generation bidding market. After the bid announcement of 24 May 2024, six power plants from five companies participated with a net total of 6,172 GWh. One plant bidding 750 GWh a year won the selection. That winner burns fuel that meets the national standard: 4 kg CO2eq or less per 1 kg of hydrogen. Commercial operation begins in 2028 after infrastructure work and plant renovation. In addition, the auction contracts the power for up to 15 years from commercial operation. The offer came in thousands of gigawatt hours, the award in hundreds (December 2024).
What this means for you: I size the market on the award, not on the notice. Only one plant holds a contract, and it counts as a real buyer. It starts delivering in 2028.
What fuel the bid has to carry
The BloombergNEF and Climate Technology Coalition paper notes that Japan and South Korea promote ammonia co-firing with coal. World ammonia capacity stands at 243 million tonnes a year, with utilisation around 80 per cent. Plants last 20 to 50 years, and 90 per cent of traded ammonia sits on short-term contracts of one to three years with a fixed quantity. In addition, a take-or-pay structure, prices indexed to monthly Tampa assessments. Production costs run from 100 to 1,000 USD per tonne by region against an average of 305 USD per tonne since 2013. A developer securing renewable power may have to sign a fixed-price electricity contract of 20 years. Some bankers then ask for a fixed-price offtake of the same length.
Buyers usually sign gas-indexed prices for a few years only, and they pay two to three times the price of grey ammonia. Of the 185 low-carbon ammonia projects tracked, 45 have offtake agreements and 15 are under construction or financed. The selected bidder plans to co-fire coal with ammonia at its Samcheok plant. Meanwhile, an adjacent ammonia import terminal with a 30,000-tonne storage tank should be complete around July 2027. Co-firing facilities must hold a minimum mixture rate of 20 per cent (2024, 2027). I compare all of that with how the green ammonia market is structured.
What this means for you: The contract I sign at home is 15 years. However, I index the ammonia I buy to Tampa on one to three years. That mismatch is the risk I carry.
How the volumes moved after that
HyResource shows the 2025 market opening at 3,000 GWh a year of clean hydrogen power on a 15-year contract. Meanwhile, generation starts by 2029, after a three-year preparation period with a one-year grace period. A second track adds 1,300 GWh a year of general hydrogen power on a 20-year contract, with generation expected from 2027. In August 2025 the general hydrogen round closed at 1,355 GWh with 52 power plants selected. Also, in October 2025 the exchange cancelled its 2025 clean hydrogen bidding notice to replace it. In June 2026 the state proposed 500 GWh a year for clean hydrogen and 930 GWh a year for general hydrogen. However, coal-ammonia co-firing leaves the clean category from 2026, as Korea phases out coal power by 2040.
The eleventh basic electricity plan to 2038 puts hydrogen and ammonia at about 6 per cent of demand in 2038. By contrast, the 2030 target is 2.4 per cent. The 2019 roadmap targeted 1.9 million tonnes of supply and demand in 2030 and more than 5 million tonnes in 2040. Specifically, it set 130,000 tonnes as the 2018 baseline. An October 2026 strategy commits 1,000 trillion won, about 747 billion USD, over 10 years to 2035. Hydrogen is one of ten flagship technologies. The volume offered has fallen faster than the volume delivered has risen (2024, 2026). I set that next to how to finance a hydrogen project.
What this means for you: I do not finance against a volume the state may withdraw, because the state issued the 2025 clean notice in October 2025. I finance against the awarded and executed volume.
What the demand signal is worth
The Malaysian roadmap’s regional demand table shows South Korea at 2 MTPA in 2030 and 11 MTPA in 2050. It puts Japan at 3 and 20 MTPA, China at 35 and 60 MTPA. Singapore sits at 0.3 and 1 MTPA, and India at 8 and 26 MTPA. These are regional demand projections for 2030 and 2050, not power or molecules available today. The country has run two separate tracks since June 2023, one for decentralised generation and one for emissions reduction. In addition, the first general hydrogen tender named five winning plants in August 2023 (2023). I read the table as a ranking of where a seller should queue. By contrast, the two tracks read as two different buyers with two different contract shapes. The detail sits in how to secure offtake agreements.
What this means for you: Korea is a mid-sized regional demand node in 2030 and a large one in 2050. I underwrite the near term on auctions and the far term on nothing at all.
What I check before I model this revenue
The 2025 review’s five key questions puts firm offtake at less than 2 Mtpa, about 5 per cent of potential 2030 production. Only 9 per cent of announced projects worldwide have secured committed investment, against 0.5 per cent in emerging economies. The cost of capital can reach 15 per cent in emerging economies, three times the level in advanced economies. My own checks follow. The contract allows price adjustment when the winner misses a promised emission coefficient, grade, fuel stability or industry contribution.
It allows termination if the winner executes under 30 per cent of the project budget within 18 months (2024). The clean category loses coal-ammonia co-firing from 2026 (2026). The offered volume fell from 6,500 GWh to 3,000 GWh and then to 500 GWh (2024, 2025, 2026). I treat all three as one question. Also, I use the note on how policy change risk works in practice as the template.
What this means for you: a contracted buyer with a terminable contract and a shrinking offered volume is not bankable. I model the cash flows only after I model what removes them.
The four things I check in an auction contract
Check one compares the offer against the award. The state offered 6,500 GWh in 2024 and selected 750 GWh a year. Also, Check two is where the fuel has to come from, because the standard is 4 kg CO2eq or less per 1 kg of hydrogen. In addition, the minimum co-firing mixture rate is 20 per cent in 2024. Check three is what happens if the volume moves. The clean volume was 3,000 GWh in 2025 and the state proposes 500 GWh for 2026. In addition, Check four is what the contract can take away. Price adjustment follows a missed commitment, and termination follows when the winner executes less than 30 per cent of the budget in 18 months.
What this means for you: I run those four checks in that order before I quote a price. If check one or check four fails, the rest of the contract detail does not matter to me.
Sources
- Ministry of Trade, Industry and Energy of the Republic of Korea, KPX announces results of clean hydrogen power competitive bidding, 2 December 2024 https://english.motir.go.kr/eng/article/EATCLdfa319ada/2153/view, 2024.
- Kim and Chang, Launch of the Clean Hydrogen Power Auction https://www.kimchang.com/en/insights/detail.kc?sch_section=4&idx=29742, June 2024.
- HyResource, CSIRO, Republic of Korea (South Korea) policy profile https://research.csiro.au/hyresource/policy/international/republic-of-korea-south-korea, reviewed October 2026.
- BloombergNEF and Climate Technology Coalition, Scaling Up Hydrogen: The Case for Low-Carbon Ammonia https://assets.bbhub.io/professional/sites/24/CTC-whitepaper_Ammonia_Final.pdf, January 2024.
- Malaysia, Ministry of Science, Technology and Innovation, Hydrogen Economy and Technology Roadmap https://www.mosti.gov.my/wp-content/uploads/repository/penerbitan/2023/Hidrogen%20Economy%20&%20Technology%20Roadmap.pdf, 2023.
- IEA, Global Hydrogen Review 2025, Five key questions about hydrogen https://www.iea.org/reports/global-hydrogen-review-2025/five-key-questions-about-hydrogen, 2025.
Frequently asked questions
What is Korea's clean hydrogen power bidding market?
A public process in which the power exchange contracts electricity generated from hydrogen meeting 4 kg CO2eq or less per 1 kg of hydrogen, for up to 15 years from commercial operation, with the first notice published on 24 May 2024 (2024).
How much power did the first auction award?
Up to 6,500 GWh were offered in 2024, six power plants from five companies bid a net 6,172 GWh, and one plant bidding 750 GWh a year was selected, with commercial operation from 2028 (2024).
What fuel qualifies for the clean hydrogen category?
Hydrogen or ammonia meeting the national certification standard, in a plant co-firing coal with ammonia, gas with hydrogen, or running on hydrogen alone, with a minimum co-firing mixture rate of 20 per cent and fuel quality scored from 35 points down to 1 point across four grades (2024).
Can the contract be cut short?
Yes: a missed promised commitment can trigger a price adjustment, and if at least 30 per cent of the project budget is not executed within the first 18 months the contract may be terminated after committee deliberation (2024).
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you want a second read on a Korea-facing structure before you commit fuel to it, I offer contracting and risk management support, and I work through the award line, the grade and the remedies clause with you in one session.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.