We Connect Asia

Biogas

Bio-CNG and Bio-LNG: How Biomethane Leaves the Plant as a Transport Fuel

10 min read  ·  Nov 12, 2025  ·  By Alex

bio cng and bio lng

One digester can leave the plant as three different products. Gas injected into a grid, compressed gas loaded into a truck, or liquefied gas bunkered into a ship. The choice is settled by the buyer and the distance, not by the technology. That is why bio-CNG and bio-LNG are commercial decisions before they are engineering ones: about one-fifth of existing biomethane plants already produce compressed or liquefied gas for transport. In addition, the market is small: 40 billion cubic metres of natural gas equivalent of biogas a year against 10 billion cubic metres of biomethane, on 2023 data. I work from the biogas, biomass and biofuels hub, because the product I sell follows the feedstock I can collect.

Also, I take the three products in order, then what compression sells. What liquefaction adds, where the transport demand is real, what certificates pay. In addition, the checks I run before I commit. Every figure below is dated in the sentence where it appears.

In short

  • Three products: grid gas, compressed gas or liquefied gas from one digester; the buyer and the distance decide.
  • Compression: bio-CNG serves a captive fleet on a fixed route; about one-fifth of existing biomethane plants already make transport gas.
  • Liquefaction: bio-LNG reaches ships; pure bio-LNG could meet 3 percent of shipping fuel energy demand in 2030.
  • Demand: global biogas demand climbs an estimated 30 percent over 2024 to 2030, to almost 2 270 PJ a year.
  • Certificates: revenues run from USD 80/MWh to USD 210/MWh in some countries in 2025, and they are not a subsidy.
Facebook
Twitter
LinkedIn

In this article

Manure and waste first, molecules second

A plant in my position can sell three products. Gas into a grid, compressed gas for a fleet, or liquefied gas for a ship. The buyer and the distance settle that choice before FID. Biomethane is biogas that has been upgraded, meaning carbon dioxide. In addition, water are removed until the gas meets a pipeline specification.

Before it is a fuel business, this plant is a methane abatement device. Human-caused methane emissions can be cut by up to 45 percent this decade. That would avoid nearly 0.3 degrees C of global warming by 2045, in the 2021 UNEP and Climate and Clean Air Coalition methane assessment. Livestock manure and enteric fermentation represent roughly 32 percent of global anthropogenic methane emissions.

Targeted measures available today could cut methane by approximately 180 Mt a year by 2030, and roughly 60 percent of those measures are low cost, with 50 percent of them carrying negative costs. The digester earns first by destroying methane that would escape from manure.

What this means for you: I pick the waste stream before I pick the product, because the emission credit follows the feedstock.

What compression actually sells

Compression squeezes upgraded gas into a pressure vessel for a tube trailer, and the product is bio-CNG, compressed biomethane. I use the plain meaning of biomethane here: biogas cleaned until it behaves like natural gas. About one-fifth of existing biomethane plants produce either compressed or liquefied gas for transport. In addition, their use in transport is currently very small.

The case for compressed or liquefied gas is strongest where electrification is harder: long-haul road freight and shipping. Infrastructure can be built along established routes used by a captive fleet, meaning vehicles that return to a few depots: municipal buses, refuse collection vehicles, ferries and cruise ships.

The cost stack, from the IEA’s 2020 outlook for biogas. In addition, biomethane, is short. Global average cost of producing biomethane through upgrading is around USD 19/MBtu, upgrading alone is about USD 2/MBtu to USD 4/MBtu for a facility upgrading around 3.5 million cubic metres of biogas a year. In addition, grid connection costs around USD 3/MBtu. That is an equipment cost, not a delivered fuel price.

What this means for you. I choose compression only when a named fleet runs the route and will sign for the volume.

What liquefaction adds and what it costs

Liquefaction turns biomethane into bio-LNG, a liquid that moves by ship or road tanker. The line between a biomethane plant and a biogas plant is the same: how far the gas must travel.

In 2026, pure bio-LNG could meet 3 percent of shipping fuel energy demand in 2030 and 13 percent in 2050; blended with fossil LNG at a 20 percent ratio, 16 percent in 2030 and 63 percent in 2050. The World Biogas Association’s 2026 presentation to the IMO counts approximately 850 LNG vessels in operation and around 700 in the orderbook.

In 2026, 16 European countries produce bio-LNG, confirmed capacity for 2027 reaches 21.1 TWh a year, under 1 percent of global LNG trade, roughly 0.4 percent; 153 more plants are expected by 2028, adding 13.1 TWh a year, and 80 percent of European bio-LNG goes to road transport. The market on 2023 data is 40 billion cubic metres of natural gas equivalent of biogas and 10 billion cubic metres of biomethane. With USD 2 billion invested a year; the full energy potential of biogases equals one third of fossil gas demand.

What this means for you: I liquefy only when a ship or a long road haul is already contracted.

Where the transport demand is actually real

Around 80 percent of the production of biogases is used directly as biogas, primarily to generate electricity and heat, with about an equal split between electricity-only facilities. In addition, co-generation facilities; the remaining 20 percent is upgraded to biomethane. That 20 percent is the global split today, not a forecast for Asia, and I locate the upgrade through the stages of the biogas production process.

There are more than 40 million household-scale biodigesters in the world, primarily in China, but also in Brazil, India, Southeast Asia and parts of Africa. Total installed capacity of biogas plants reaches 20 GW by 2035, and by 2050 more than 60 percent of biogas should be upgraded to biomethane, according to the IEA’s 2025 outlook for biogas and biomethane.

The levelised cost, which spreads the whole cost of a plant across the energy it will sell over its life, is dominated by operations. In addition, feedstock: those two lines are around two-thirds of the total levelised cost of production.

What this means for you: I read the 20 percent as a statement about today. In addition, I sell transport gas only where a fleet already exists to buy it.

What certificates pay, and what they do not

A guarantee of origin is a registry record tying a volume of gas to a feedstock, and the mechanics of book. In addition, claim let a buyer take that attribute without moving the molecule.

Global demand for biogases climbs an estimated 30 percent over 2024 to 2030, to almost 2 270 PJ, around 59 bcme, per year in 2030. That falls 64 percent short of the 3.7-fold growth the Net Zero by 2050 Scenario requires, in the IEA’s Renewables 2024. Transport leads demand growth over the period.

The share of biofuels in total liquid fuel transport demand expands from 5.6 percent in 2023 to 6.4 percent in 2030, reaching 215 billion litres a year. In 2025, biomethane certificate revenues in some countries range from USD 80/MWh to USD 210/MWh, and carbon dioxide removed during upgrading can earn a removal credit worth around USD 500/t CO2 to USD 600/t CO2. A certificate is a revenue line with registry rules, not a subsidy; gas quality specifications. In addition, registry tracking make it bankable.

What this means for you: I price the certificate separately from the gas and check that the registry accepts my feedstock before I count that line.

The Southeast Asian test

The Indonesia Domestic Biogas Program found abandonment a key issue in a 2022 user survey: 256 of 554 respondents reported discontinuing use or facing issues with their biodigesters, and 225 units were repaired in 2023. The sandbox approach in Singapore asks a different question. That is because Singapore has no domestic feedstock to abandon.

India’s SATAT programme, launched in 2018, set a first target of 5 000 compressed biogas plants and 15 million tonnes per year of production by the 2023/24 fiscal year, and that target remains unmet. An announced target is not a built plant, and I never model it as one.

A small, dense, high-value market with no domestic feedstock depends on imported molecules and on a bunkering or road fleet that can absorb a premium. The product must be liquefied or containerised, and the contract must carry the logistics: who moves it. That holds the buffer, and who pays when a vessel slips.

What this means for you: I write the logistics into the offtake before I write the price. That is because in this market the molecule is only as saleable as the truck or the berth behind it.

My checklist before I choose a product

Before I name a product in a term sheet, I run five checks on the same page.

The first two checks decide the product, and the last three decide whether I can hold it. A fleet that will not sign removes compression; a berth that will not book removes liquefaction; a registry that rejects the feedstock removes the certificate line from the model.

  • Buyer: a named buyer with a fleet already exists inside the economic radius I can deliver to.
  • Specification: the gas specification that buyer needs is written down, with the tolerance it will accept.
  • Conversion: compression or liquefaction capacity has a maintenance plan and a spare unit on site.
  • Registry: the certificate registry accepts my feedstock and records the blending level I will inject or bunker.
  • Contract: volume tolerance and quality are fixed in the contract, not only the price.

What this means for you: A project that fails any one of the five is not ready for a product decision. It is still a feedstock and route question.

What I would put in the term sheet

Four lines go into the first draft, each dated to the evidence behind it.

  • Product and buyer, 2022 to 2026: one plant, three possible products, and about one-fifth of existing biomethane plants already producing compressed or liquefied gas for transport.
  • Conversion cost, 2020: upgrading at about USD 2/MBtu to USD 4/MBtu and grid connection at around USD 3/MBtu.
  • Demand, 2024: almost 2 270 PJ of biogases a year by 2030, 64 percent short of the net zero path.
  • Certificate revenue, 2025: USD 80/MWh to USD 210/MWh in some countries, booked as a separate line from the gas.

I leave financing terms out of this draft, because none of the sources behind these figures publishes any. What I do put is the buyer’s name, the specification, the conversion cost and the certificate line, each with the year it was measured. Every row carries a year and a source I can point to.

What this means for you. I sign the product choice only when all four rows are filled with a dated number and a named counterparty.

Sources

Frequently asked questions

Bio-CNG is biomethane compressed into a pressure vessel for a road tanker, and bio-LNG is biomethane liquefied so it can travel by ship or road tanker. Compression suits a captive fleet on a fixed route; liquefaction buys distance and suits shipping. Both start from the same upgraded gas, so the difference is the buyer and the route, not the digester.

No. A plant can sell upgraded gas to a local user or into a pipe, and in 2020 a grid connection was costed at around USD 3/MBtu, against about USD 2/MBtu to USD 4/MBtu for upgrading alone at a facility handling around 3.5 million cubic metres of biogas a year. You need liquefaction only when the buyer sits beyond a pipe or a road route you can serve.

The buyers with the clearest need are captive fleets on fixed routes: municipal buses, refuse collection vehicles, ferries and cruise ships, the segments where electrification is harder. About one-fifth of existing biomethane plants produce compressed or liquefied gas for transport, and their use in transport is currently very small, so a named buyer with a written specification matters more than a plant design.

They can help, but they are a revenue line with their own registry rules, not a subsidy. In 2025, biomethane certificate revenues in some countries ranged from USD 80/MWh to USD 210/MWh, and carbon dioxide removed during upgrading can earn a removal credit worth around USD 500/t CO2 to USD 600/t CO2. Both depend on a registry that accepts the feedstock and on tracked gas quality specifications, so I model them only after those checks pass.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you want the product choice written into an offtake that a buyer will actually sign. I work through it with you: offtake agreements, specification, volume tolerance and the certificate line, in that order. Also, I do not quote a price before the buyer and the route are named.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles