Winning the First Project in Asia: A Practical Sequence

9 min read  ·  Apr 2, 2026  ·  By Alex

climate tech first project asia

The answer is short: you win the first project by lifting three doubts in order. Also, the technology works under local conditions, a named developer carries the site and the permits. In addition, a buyer signs a contract that proves demand. Pick the developer before the buyer when the site is the constraint, and never lead with the product. Lead with the proof the local counterpart is missing. That is the whole shape of a first project asia climate tech sequence. In addition, the wider frame sits in my published material on climate tech and green tech.

I work through the argument in eight sections, then answer the four questions I am asked most often.

In short

  • Three doubts: works here, site and permits held, demand proven.
  • Developer: pick the counterpart who carries the site before the buyer.
  • Proof: a bolt-on installation beats a greenfield first plant.
  • Contract: fixed multi-year offtake, no exit on bankruptcy.
  • Sequence: proof, partner, contract, capital, in that order.
Facebook
Twitter
LinkedIn

In this article

The three doubts, in order

Three lines decide it, in this order: works here, site and permits held, demand proven. Pick the developer before the buyer when the site is the constraint. That is because nobody can commit to a location that no one controls.

Definitions first. Your first project is the first paid installation of your technology in local conditions. One real site, one customer, one signed contract. Local conditions means the temperature, humidity, feedstock, grid quality. In addition, permitting practice the unit will meet, plus the crew who will run it. A developer is the party who assembles the site, holds the permits and carries the construction risk. An offtake is a contract in which a buyer commits to take the output for a fixed period. A bolt-on installation is a unit fitted inside an existing operating facility rather than built from scratch on new land.

Your counterpart tests those doubts in the same order whether or not you present them. Never lead with the product; lead with the proof that is missing locally. That is a unit that has run, a measured output and a neighbour who accepted it.

What this means for you: write the three doubts on one page and mark, with a tick or a cross, which ones your evidence already answers.

Why the first project is harder than the product

A technology sheet settles the first doubt only. The other two are about execution, and execution is where a first project stalls.

In the latest International Energy Agency Net Zero Roadmap (2023 update), 35 percent of the emissions reductions necessary for limiting climate change will come from technologies not yet on the market. You sell from inside that gap, so the buyer has no local precedent to lean on.

Financing prices the risk you have not removed: for low-carbon infrastructure projects often more than half of the cost of the output is driven by the cost of financing, and roughly 40 percent of the cost of renewable energy projects can be attributed to costs of financing, as reported in 2024.

The operating point comes from the Stanford Guidebook for Early Climate Infrastructure published in April 2024: founders of breakthrough technology companies rarely embark expecting to become project developers. Therefore, early teams must rapidly build the permitting, contracting, financing and operating capability that bridges technology provider and project developer. Infrastructure funds and banks are typically only willing to back new technologies after a demonstrated history of strong operational performance and revenue generation. One developer raised US$300M of equity financing in 2022 from climate-focused funds to fund its pilot (a small-scale unit run to prove the process) and first commercial plant.

The first project is therefore won on execution evidence, not on the technology sheet.

What this means for you: before you send a specification, assemble the running record: start. In addition, commissioning dates, measured throughput, and the cost per unit of capacity you can show.

Lifting the demand doubt

Demand is the fastest doubt to lift, because every other party reads the signed contract before it reads your deck. One offtake answers the question that a developer, a lender and a co-investor each ask first.

The regional read comes from the Openspace analysis of venture climate investment in Southeast Asia published in June 2024. In it, the share of climate tech in Southeast Asia venture funding grew from 3.2 percent in 2019 to 9.5 percent in 2023. Across the years to 2023, early-stage rounds prior to Series B consistently comprise an average of 85 percent of climate tech equity deal volume in the region. Generalist funds, meaning funds that invest across sectors rather than in climate only, joined over 80 percent of regional climate tech equity deals in 2023 by deal count. In addition, they prioritize return profiles within fund lives rather than abatement potential, meaning the emissions the technology removes. Singapore and Indonesia took over 90 percent of total climate deal value in the first 11 months of 2023.

Those 2023 numbers show where the money sits and what it optimises for. A generalist fund will not sign your demand; a customer will, and that signature is what everyone else reads. The mechanics sit in how to secure offtake agreements.

What this means for you: work on the offtake first, and let the deck and the financial model follow it rather than lead it.

Writing the contract that survives

In 2025 capital shifted from climate ambition to commercial performance: winning technologies meeting real demand, demonstrating manufacturing readiness, securing offtake. In addition, aligning with market signals, as reported in the Net Zero Insights State of Climate Tech 2025 report. Also, in 2025 venture investors took 34.1 percent of deals by investor type and strategics 13.8 percent, while a yearly count of commercial agreements by type (offtake agreement, service agreement, strategic partnership, supply agreement) rose through 2025. In 2025, at technology readiness levels 7 to 8, where a system is demonstrated in a relevant environment. Strategic investors were described as pivotal, validating technologies through venture investments, mergers and acquisitions, and offtakes.

Turn that reading into clauses. Secure fixed multi-year offtake contracts that support the project in the absence of policy support. Avoid contract clauses that let the customer terminate for startup bankruptcy, because that clause hands the buyer a free exit exactly when your financing depends on continuity. Position the product as a premium offering beyond decarbonisation, where premium means a price justified by higher capacity or better quality rather than the emissions story alone.

The drafting work belongs here: how an offtake agreement is structured.

What this means for you: draft the contract before the pitch, so the buyer negotiates a document rather than an aspiration.

Financing the first plant

Project finance means funding repaid out of the cash flows of the project itself, and that is the money you chase once the plant exists. Your balance sheet is thin, so the contract carries double weight.

According to the First Citizens Bank Future of Climate Tech report published in April 2026, United States venture capital investment in climate tech reached US$29 billion in 2025, the third-highest year on record behind 2021 and 2022. In 2025 capital concentrated: 10 late-stage deals captured 28 percent of all investment. Also, in 2025 a record 52 percent of venture-backed climate tech companies reduced their net burn year on year as gross margins improved. Over 50 federal actions since 2024 raised headwinds through pullbacks in funding, research, permitting and staffing.

Two readings follow for a founder with one plant to build. The pool is large but narrow. Therefore, whoever funds you looks for operating history and contracted revenue rather than a forecast. Your offtake, construction record and measured unit costs are the data room, meaning the folder of contracts, permits. In addition, operating records read before money is committed. The route is described in infrastructure project finance.

What this means for you: build the financing file from documents you already hold, and treat every month of clean operating data as capital you do not have to raise.

Choosing the site from the 2030 map

A site is a bet on which system the region will build. Published in May 2025, the Bain and Company Southeast Asia’s Green Economy 2025 report states that with five years left until 2030 the region is not on track to meet its climate pledges, and it names three high-impact solutions: scaling the sustainable bioeconomy, modernizing domestic and regional grids, accelerating the electric vehicle ecosystem.

The value sits where those systems grow. Also, the global bioeconomy should reach US$30 trillion by 2050. Modernizing and expanding the power grid would generate approximately 200,000 jobs in 2030 and $25 billion in GDP contributions. By prioritizing the three solutions the region could create $120 billion in new economic value and up to 900,000 jobs in 2030.

Match your unit to one of those three systems, then look for the counterpart who owns a site inside it. A grid-adjacent plot changes your permitting path, a bioeconomy plot changes your feedstock contract, an electric vehicle plot changes your customer list. Test the choice against the bankability review a lender will run.

What this means for you: choose the system first, the country second, and the plot third, so permits. In addition, feedstock follow a decision you can defend.

When not to take the first project

A small industrial bolt-on or modular installation into an existing facility avoids risks around land and permitting, and it lets the developer recoup asset value if there is a customer issue. It can also fall below a minimum size that makes it difficult to finance. That is why a modest site inside a working plant can be the better first project.

Public evidence shows the trade working. One installation in Alberta, Canada started construction in May 2023 and began commissioning in March 2024, processing 500 gallons per minute, 100 times the flow rate of its pilot. At a cost per unit of capacity roughly equivalent to the pilot.

Capital at the other end of the chain was thin as at end-2023. Fewer than 15 percent of regional climate funds had raised more than US$100 million.

On that basis I refuse three shapes of first project: a site with no permitting path; a buyer who wants pilot data but will not sign; a developer who prices construction only after the equity split is agreed. That is because that order hides the number you need most. The regional context sits in the ecosystem map.

What this means for you: write your three refusals next to your three doubts, and hold every project you are about to accept in front of both lists.

How I run the sequence

Four steps, in order: write the three doubts and the local proof for each; pick the developer by site and permits; draft the contract before the pitch; bring capital in last.

The order does the work. Proof first, because it is what a developer tests; partner second. That is because the site is the constraint; contract third. Also, that is because it is what a lender reads; capital last, because money follows the three signs above it. A first project is won only when buyer, developer and lender have each signed.

What this means for you: start with the doubt you can close this quarter, and do not move to the next one until the proof is written down.

Sources

Frequently asked questions

One of the three doubts stays open. The technology has not been shown to work under local conditions, or no party holds the site and its permits, or no buyer has committed to the output. In 2023 climate tech took 9.5 percent of Southeast Asia venture funding, up from 3.2 percent in 2019, so money is available while demand proof stays thin. In 2025 the technologies that won met real demand, demonstrated manufacturing readiness and secured offtake. The doubt your counterpart tests first is the one to close first.

The developer, when the site is the constraint. In 2024 published guidance noted that founders of breakthrough technology companies rarely embark expecting to become project developers, so the party who assembles the site, holds the permits and carries construction risk must be identified before any demand conversation. In 2023 Singapore and Indonesia took over 90 percent of total climate deal value in the first 11 months of 2023, which is a reminder that counterparties cluster; go to where the site is, then ask for the signature.

A fixed multi-year offtake that supports the project in the absence of policy support, with no clause letting the customer terminate for startup bankruptcy. That was the published guidance in 2024. In 2025 the yearly count of commercial agreements by type, including offtake agreements, rose through the year, and at technology readiness levels 7 to 8 strategic investors were described as validating technologies through offtakes.

From the 2030 value map. Published in May 2025, the regional assessment found five years left until 2030 and no track to meet the climate pledges, and it named three solutions: scaling the sustainable bioeconomy, modernizing domestic and regional grids, accelerating the electric vehicle ecosystem. Grid modernization alone would generate approximately 200,000 jobs in 2030 and $25 billion in GDP contributions, while prioritizing all three could create $120 billion in new economic value and up to 900,000 jobs in 2030.

Want the three doubts lifted against your own first project?

A short call is usually enough to see where your project stands.

I prepare a founder for the first project conversation by writing the three doubts the way the local counterpart will read them. In addition, setting the proof I already hold against each one, so the meeting opens on evidence instead of on the product. If that is the preparation you want, start here: strategic partnerships.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles