Home » Partnering with Project Developers: What Each Side Brings
Partnering with Project Developers: What Each Side Brings
9 min read · Apr 2, 2026 · By Alex
You partner with a project developer when he brings the three things you do not hold: the site and its permits, the local construction contracts, and the route to project financing. You keep the technology, the performance data and the offtake relationship. The deal fails when the margin split is priced after construction starts, and it fails faster when the developer wants the technology instead of the project. That is the short form of a climate tech project developers partnership, and everything below takes it apart: the two contributions, the money, the contract, and the three refusals I keep. I write this from inside the climate tech and green tech landscape in Southeast Asia.
I work through it in order: what each side brings, why founders end up developing anyway, where to find the counterpart, the contract, the margin split, the financing view, and when to walk away. The last section gives the four steps I run.
In short
- Each side: you keep technology and data, he keeps site and contracts.
- Margin: price construction risk before the split, never after.
- Demand: the offtake sits with the party who can sign it.
- Bolt-on: an existing site beats greenfield for a first plant.
- Refuse: three refusals keep the partnership honest.
In this article
What each side brings
He brings the site and its permits, the local construction contracts, and the route to project financing. You bring the technology, the performance data and the offtake relationship. The partnership holds only when both sets are written down as contributions rather than promised later.
A project developer is the party that assembles land, permissions, contractors and capital, builds the physical asset and carries it through construction. A permit is the written authorization a public authority issues before you may build or operate on a site. Project financing is long-term funding repaid out of the project’s own output, so the route to it means a counterparty a lender will recognize. A bolt-on installation is a unit placed inside a facility that already works, as against a greenfield plant, which is a new build on a site taken from nothing. Offtake is a contract in which a buyer agrees to take a defined quantity of your output over a defined period. Construction risk is the chance that the build costs more, runs longer or performs worse than planned. The margin split is the agreed division of profit between the two sides once the asset sells.
His three contributions cannot be bought quickly: land and permits take local relationships, construction contracts take subcontractors who already work for him, and the financing route takes time he has spent.
What this means for you: write the two lists side by side before anyone speaks about ownership or the split. If a line cannot be evidenced with a document it is not a contribution, it is a hope, and hopes do not survive a lender’s review.
Why founders end up developing anyway
Founders of breakthrough technology companies rarely set out expecting to become project developers, and without natural development partners early teams must rapidly build the permitting, contracting, financing and operating skill that bridges technology provider and project developer. That is the finding of the Stanford Guidebook for Early Climate Infrastructure published in April 2024, and it describes most of the founders I meet.
The pressure is arithmetic. For low-carbon infrastructure projects, often more than half of the cost of the output is driven by the cost of financing, and roughly 40 percent of the cost of renewable energy projects can be attributed to costs of financing, as published in 2024. In the latest International Energy Agency Net Zero Roadmap (2023 update), 35 percent of the emissions reductions necessary will come from technologies not yet on the market. Infrastructure funds and banks are typically only willing to back new technologies after a demonstrated history of strong operational performance and revenue generation.
A developer is a shortcut to that skill; the price is his share of the margin and his name on the site. Founders who refuse it build a permitting desk, a contracting desk and a financing desk inside a company whose product is technology: a second company in disguise.
What this means for you: decide this early, because the team you build in the first year is the answer you have already given.
Where to find the counterpart
Energy corporates in Southeast Asia are active through their venture arms, which are the investment units a corporate sets up to put its own money into startups, investing in distributed solar, carbon markets, battery optimization, battery recycling and offshore robotics; cross-border collaboration between regional national oil companies on methane measurement is also recorded. The conclusion is narrow: the counterpart sits where corporate interest and a real site coincide.
I read the Openspace analysis of venture climate investment in Southeast Asia published in June 2024 as recording that almost 30 climate-specific funds with full or majority allocations to the region have emerged since 2020, raising over US$830 million in committed capital. In 2023 generalist funds, meaning funds free to back any sector, joined over 80 percent of regional climate tech equity deals by deal count, and in the first 11 months of 2023 Singapore and Indonesia took over 90 percent of total climate deal value.
That shapes the search. A corporate that already owns the site or already buys the output beats a fund holding capital and no asset; the overlap sits in the regional funding and corporate ecosystem.
What this means for you: start from the site holder or the buyer, not from the capital. Money without an asset gives you a pitch, while an asset gives you a project.
The contract before the pitch
As set out in the Bain and Company Southeast Asia’s Green Economy 2025 report, published May 2025, with five years left until 2030 the region is not on track to meet its climate pledges and new pathways for change are needed. Three high-impact solutions are named: scaling the sustainable bioeconomy, modernizing domestic and regional grids, accelerating the electric vehicle ecosystem. By prioritizing the three, the region could create $120 billion in new economic value and up to 900,000 jobs in 2030. Enabling solutions sit alongside them: access to climate and transition finance, carbon markets, green artificial intelligence.
Treat that as a demand map, then move to documents. Secure fixed multi-year offtake contracts that support the project in the absence of policy support; avoid contract clauses that let the customer terminate for startup bankruptcy; and position the product as a premium offering beyond decarbonisation, meaning higher capacity or better quality rather than a greener label. I begin with the offtake side of the contract, because everything a lender asks for afterward depends on it.
What this means for you: bring the offtake draft, the termination clause and the pricing position into the first meeting. A developer who will not discuss them before the site is secured is telling you where the risk sits.
Splitting the margin
I read the Net Zero Insights State of Climate Tech 2025 report as showing that in 2025 capital shifted from climate ambition to commercial performance: winning technologies meet real demand, demonstrate manufacturing readiness, secure offtake and align with market signals. In 2025 venture investors took 34.1 percent of deals by investor type, governments 19.5 percent, strategics 13.8 percent, growth equity investors 13.2 percent. In 2025 nearly 50 percent fewer companies reached Seed to Series A and 80 percent fewer made it from Series A to Series B compared to 2022, despite needing six extra months to progress. In 2025 mitigation captured over 70 percent of Climate Tech funding.
The split follows the risk priced before construction, not the hours either side puts in during it. Price who carries the overrun, who carries the delay and who carries the performance miss, write those lines down, then divide what is left. Thin later-stage capital makes a late split expensive: in 2025 the passage from Series A to Series B was 80 percent thinner than in 2022, so the argument lands when your options are smallest. That pricing lives in how a first project gets financed.
What this means for you: never quote a percentage split before the construction risk has been priced and assigned. A number without that pricing behind it is only an opening position.
What the financing side sees
I take the First Citizens Bank Future of Climate Tech report published in April 2026 as the clearest read on what capital is doing. In 2025 United States venture capital investment in climate tech reached US$29 billion, the third-highest year on record behind 2021 and 2022, led by investments in clean energy. In 2025 10 late-stage deals captured 28 percent of all investment. In 2025 a record 52 percent of venture-backed climate tech companies reduced their net burn year on year as gross margins improved. Since 2024 over 50 federal actions have raised headwinds through pullbacks in funding, research, permitting and staffing.
A lender reads the partnership as one counterparty map: one party accountable for the site, one for the technology, one for the buyer, each with a bounded risk. If the split cannot be shown on a single page, the lender has to draw the boundary himself, and a boundary drawn in the dark gets treated as an unknown. That is why how project finance is actually underwritten starts from names and responsibility rather than from projections.
What this means for you: prepare the one-page counterparty map before any financing conversation. If you cannot draw it, the split is not decided yet, whatever either side believes.
When the partnership is the wrong answer
Small industrial bolt-on or modular installations into an existing facility avoid risks around land and permitting and let the developer recoup asset value if there is a customer issue, but they can fall below a minimum size that makes them difficult to finance, as published in 2024. For a first plant the trade is usually worth taking: the land risk and the permit risk disappear, and the team learns on a site that already has power, water and people. Size is what you give away, and project finance for a first plant still turns on it.
Available capital sets the outer limit. One developer raised US$300M of equity financing in 2022 from climate-focused funds, and as at end-2023 fewer than 15 percent of regional climate funds had raised more than US$100 million. A single large plant can absorb the committed capital of several funds, which is a reason to start modular.
I keep three refusals. Refuse when the developer wants the technology instead of the project. Refuse when the margin is priced after construction starts. Refuse when neither side can name the offtake buyer. Each refusal is cheap early and expensive later, and none of them is negotiable once a contractor is on site.
What this means for you: hold the three refusals as written conditions, not as preferences. Drop one and you no longer have a partnership, you have a dependency.
How I structure it
Four steps, in this order. Write the two contributions and the three refusals on one page. Price the construction risk before the split. Put the offtake and the policy inside the same documents, so a change in one does not strand the other. Set the exit before commissioning: who buys, at what point, on what evidence.
The partnership is finished only when the buyer, the developer and the lender have each signed. Two signatures give you a plan; three give you a project.
What this means for you: bring that page to the first meeting, take it back with edits, and sign nothing that leaves the buyer unnamed.
Sources
- Guidebook for Early Climate Infrastructure, April 2024.
- Openspace, June 2024.
- Bain & Company, May 2025.
- Net Zero Insights, December 2025.
- First Citizens Bank, April 2026.
Frequently asked questions
What does a project developer bring?
The site and its permits, the local construction contracts and the route to project financing. That is what he assembles before any technology is installed: land and authorization in his name, subcontractors who already work for him, and a financing path a lender will recognize. In 2025 capital shifted from climate ambition to commercial performance, so a developer arriving with a site, a permit route and a named buyer beats one arriving with a list of possible locations.
How should we split the margin?
Price the construction risk first, then split what is left. In 2024 it was published that for low-carbon infrastructure projects often more than half of the cost of the output is driven by the cost of financing, which is the exposure both sides share. In 2025 nearly 50 percent fewer companies reached Seed to Series A than in 2022, so a split left until after construction gets negotiated when capital is scarcest.
Can the developer own the technology?
No. He owns the project: the site, the permits, the construction contracts and the asset. You keep the technology, the performance data and the offtake relationship. In 2024 it was recorded that infrastructure funds and banks are typically only willing to back new technologies after a demonstrated history of strong operational performance and revenue generation, and that history sits with you. If he asks for the technology instead of the project, the shape of the deal has changed and the answer stays no.
When is a bolt-on better than a greenfield plant?
For a first plant. A small industrial bolt-on or modular installation into an existing facility avoids risks around land and permitting and lets the developer recoup asset value if there is a customer issue, but it can fall below a minimum size that makes it difficult to finance. That trade was published in 2024, and in 2022 one developer raised US$300M of equity financing from climate-focused funds to reach a first commercial plant. Take the bolt-on when land and permit risk would otherwise stop you, then check the size against what a lender will fund.
Want the developer conversation prepared on one page?
A short call is usually enough to see where your project stands.
Before the first meeting I prepare the founder on one page: the two contributions, the three refusals and the construction risk already priced, so the conversation opens at the split instead of at the vision. See my strategic partnerships work.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.