Extended Producer Responsibility: Can It Pay for Your Project?

10 min read  ·  Mar 23, 2026  ·  By Alex

extended producer responsibility revenue

A producer fee can pay for a waste project only when a mandatory rule is in force and turns that fee into a contracted cash flow to the operator. My case rests on three measured things. First, extended producer responsibility takes two shapes. In financial schemes, the public sector collects and treats waste using money raised on the private sector. In operational schemes, the private sector finances and runs collection and recovery itself. Second, Malaysia moved its national recycling rate from 15.7 percent in 2015 to 35.38 percent in 2023 as its scheme rolled out. Third, the region effectively recycled only 12 percent of its plastic waste in 2022. In the waste-to-energy and circular infrastructure branch of my work I treat that money as the layer above the base case, never as the base itself.

I work through the question in a fixed order. It runs: what the obligation actually is, how the money reaches a plant, and what the region already requires. Then: why the funding gap is real, and how the investment chain treats the fee. Finally, what the contracts decide. I close with the five checks I run and the way I stage the decision.

In short

  • The rule: only a mandatory scheme in force pays, and it pays through a contract to the operator.
  • The two shapes: financial schemes raise money on producers, operational schemes put recovery in private hands.
  • The measured result: Malaysia’s recycling rate moved from 15.7 percent in 2015 to 35.38 percent in 2023.
  • The gap: of 113 Mt of plastic waste in 2022, the region collected 19 percent and recycled 12 percent.
  • The test: a fee becomes revenue only when a contract passes it to the operator for a measured tonnage.
Facebook
Twitter
LinkedIn

In this article

What the obligation actually is

Extended producer responsibility is the rule that makes the brand owner pay for the end-of-life of what it puts on the market. The May 2025 ERIA and UNCRD briefing on extended producer responsibility in Southeast Asian countries gives a broader definition. Producers stay responsible for their products across the whole life cycle, including after consumption. A producer responsibility organisation is the body that collects those fees and spends them.

Two forms sit underneath. A financial scheme has the public sector collect and treat the waste with money raised on the private sector; an operational scheme has the private sector finance and organise collection and recovery itself, individually or collectively. The recorded data show that mandatory schemes work better than voluntary ones. Indonesia, the Philippines, Singapore and Viet Nam are implementing the obligation. Meanwhile, brunei, Cambodia, Laos, Malaysia, Myanmar and Thailand are still developing theirs.

Since 2019 Indonesia has required a producer plan and an annual report. Singapore has made packaging reporting mandatory since 2020. Since 2022 the Philippines has required registration of upstream reduction and downstream recovery programmes, and since 2022 Viet Nam has let a producer either organise recycling or pay into an environmental fund.

What this means for you: I count only an obligation already in force, with a start date I can point to, and I keep announced targets out of the revenue line.

How the money reaches a project

The market picture sits one step below the rule. The 2025 Mordor Intelligence market study of ASEAN waste management reads government-led producer responsibility schemes as a compliance driver that also produces predictable funding for infrastructure, and it puts the market at USD 33.19 billion in 2025 rising to USD 48.52 billion in 2031, a growth path that waste-to-energy projects sit inside.

Three national examples show the mechanics. Viet Nam’s decree of 2025 lifts the revenue-based exemption thresholds to USD 0.87 million and USD 1.30 million and sets recycling quotas. Singapore’s electronics scheme, running since 2021, finances take-back networks through fees paid by producers. Malaysia’s rollout helped move the national recycling rate from 15.7 percent in 2015 to 35.38 percent in 2023.

Indonesia uses plastic credits, a tradable claim on financed collection or recycling. Therefore, brands can offset recycling cost against a target of 70 percent reduction of plastic waste by 2025. In the value chain, producers and producer responsibility organisations sit beside municipalities as buyers and verifiers. Also, the recurring bottleneck is traceability across informal recovery networks. The gate fee is the tonnage charge that whoever delivers waste pays. Also, it still carries the base of most cases.

What this means for you: I read the scheme text, the payer and the audit path before I put a producer figure into cash flow, because a fee that stops at a fund never reaches my plant.

What the region already requires

Requirements are further along than recycling rates suggest. The July 2025 ISWA regional brief records Indonesia’s 2019 decree obliging producers to reduce 30 percent by 2029. Meanwhile, the country produced 35.8 million tonnes of municipal waste in 2022. It sent 47.64 percent to sanitary or controlled landfill and let 37.38 percent escape into the environment. It recycled only 7 percent in 2023.

The other four markets show the same spread. The Philippines has an ecological solid waste management act. Also, a producer responsibility law on plastic packaging, with municipal waste moving from 9.07 million tonnes in 2000 to 16.63 million in 2020 and 20.45 million projected for 2045. Malaysia targets 40 percent recycling by 2025 against an overall rate of 13.7 percent in 2025. Singapore treated about 80 percent of its municipal waste in waste-to-energy plants in 2023 and produced 1,502,487 MWh that year. Thailand counted about 25.7 million tonnes a year and a 17.6 percent recycling rate in 2025.

I use the feedstock and gate fee file side by side with these national figures, because a fee stream is only as solid as the collection rate feeding it.

What this means for you: a demanding producer rule and a low recycled tonnage can sit in the same country, so I model the tonnage first and the fee second.

Why the funding gap is real

We measure the gap; we do not assume it. The July 2025 OECD Regional Plastics Outlook reports 113 Mt of plastic waste generated in the region in 2022. The region collected 19 percent for recycling and recycled 12 percent effectively. Effective rates run from 6 percent to 14 percent against a global average of 10 percent.

Two forces widen the distance between money collected and material recovered. ASEAN mismanages 56 percent of plastic waste on average. Exported plastic waste fell by 58 percent between 2014 and 2020, from 15.5 Mt to 6.5 Mt, which forces domestic capacity to absorb what used to leave. At least 15 million people work in the informal waste sector worldwide and sit outside most funding flows. Meanwhile, low-tech methods still dominate the panorama, and the report asks for urgent investment in formal, safe infrastructure.

For the model, that is the fracture line: the gap between the fee collected and the tonnage recycled is exactly where a modelled revenue line breaks, and it is why I check project finance in Southeast Asia assumptions against collection data rather than against programme announcements.

What this means for you: I ask for the collected tonnage and the recycled tonnage separately, and I fund the case on the second number only.

How the investment chain treats it

Money follows a sequence. The June 2025 Asian Development Bank brochure on advancing the circular economy sets its chain in three parts. First come policy measures upstream. Then public and private investment and financing outside the usual instruments downstream. Then comes knowledge work and capacity development. The brochure stresses that partners carry out the transition rather than any single actor.

Two concrete markers sit inside that chain. The plastic pollution project 53068-001, with its dedicated subproject on marine plastic pollution, belongs to the same family. Also, the Philippines hosted the first regional forum on the subject in June 2025. For a plant, the practical reading is narrow: an offtake. This means meane the contract that takes the output of the plant. Also, a producer fee follow the same rule. Also, I read offtake agreements as the template for how a producer payment should be written.

A producer fee becomes usable only once it sits inside that chain as a contracted payment, not as an announcement.

What this means for you: I look for the payment clause, the counterparty and the review mechanism, and I leave anything still described as an intention outside the model.

What the contracts decide

Dates tell me what a contract can lean on. Indonesia has carried a producer obligation since 2019, and mandatory packaging reporting has applied in one market since 2020. Malaysia ran its scheme voluntarily from 2021 to 2025 and makes it mandatory from 2026. Meanwhile, a refundable deposit of 10 cents on pre-packaged beverages starts in 2026. Two other markets have carried registration duties since 2022.

Those start dates sit on a physical base that is still thin: in 2022 the region generated 113 Mt of plastic waste, collected 19 percent for recycling and effectively recycled 12 percent. So the contract text matters more than the headline, and how I match risk back to back for the output is the same discipline I apply to a producer payment: name the payer, the measured tonnage, the audit trail, the gate fee basis and the review point.

What this means for you: I write the payment obligation, the measurement method and the change mechanism into one schedule, and I sign nothing that leaves the payer or the tonnage undefined.

The five checks I run on a producer-fee revenue line

Before a producer fee enters my model I run five checks, in this order.

  • First, is the scheme mandatory and in force, since a voluntary target pays nothing.
  • Second, who legally holds the fee, and whether that holder can contract it onward to the operator.
  • Third, what tonnage underlies the fee, and whether an audit trail proves delivery of it.
  • Fourth, whether the material is traceable, because undocumented collection blocks verification of the payment.
  • Fifth, what happens to the revenue if the rate or the roadmap changes.

What this means for you: a line that fails any one of the five comes out of the base case. I would rather model a small number that survives an audit than a big one that leans on a roadmap.

How I would stage the decision

I stage the reading in four dated rows, because the sequence is what tells me where the risk sits. 2014-2020: exported plastic waste fell 58 percent, from 15.5 Mt to 6.5 Mt, and domestic recovery became unavoidable. 2022: 113 Mt of plastic waste, 12 percent effectively recycled, with producer obligations already live in two markets. 2025-2026: voluntary schemes turn mandatory, and a refundable deposit of 10 cents arrives from 2026. Over the same period the market moves from USD 33.19 billion in 2025 towards USD 48.52 billion in 2031. 2029: one market requires producers to reduce 30 percent.

What this means for you: I decide feasibility on the rows that are already behind me. The later rows stay upside until a contract makes them count.

Sources

Frequently asked questions

It can, but only when a mandatory scheme is in force and the fee reaches the operator under contract. The money funds collection, sorting and recycling capacity, and one market moved its national recycling rate from 15.7 percent in 2015 to 35.38 percent in 2023 as its scheme rolled out. Where the scheme is voluntary or still in design, I leave the money out of the model entirely.

A fee is money a producer owes a scheme or a fund. It becomes revenue for a project only when a contract passes it to the operator for a measured tonnage with an audit trail. Until that contract exists, the fee sits outside my cash flow, however large the programme looks on paper.

Four markets already operate producer obligations in some form, from an Indonesian producer plan and annual report in force since 2019 to packaging reporting from 2020 and registration duties from 2022 in two other markets. Malaysia moves from voluntary to mandatory in 2026, and one more market targets 2027. The duties differ, so I read the rule text before I model anything.

The exposure sits on the rule. If the rate, the roadmap or the eligible spending changes, a modelled fee disappears with it. That is why I keep the gate fee and the material sales as the base of the case and treat producer money as the layer above it, revisited whenever a roadmap is rewritten.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are at feasibility and want to know what a producer fee is worth in your own case, I run this screening alongside grants and incentives work, so public money and producer money are assessed on one schedule. Send me the scheme text, the tonnage and the payer, and I will tell you what can be counted.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles