Indonesia SAF Policy: What the 1% Blend From 2027 Really Covers

10 min read  ·  Nov 2, 2026  ·  By Alex

indonesia saf policy

I have read the government documents. In addition, the direct answer is this: the published rule is a roadmap rather than a finished mandate, the first obligation is a 1% blend of sustainable aviation fuel on international flights from Soekarno-Hatta. Also, I Gusti Ngurah Rai follows from 2027, and Indonesia never met the earlier blending targets set in 2015. In addition, the published trajectory then rises to 20% in 2045 and 50% in 2060. Therefore, the number to underwrite is the first step, not the last one. That is the whole picture in one line, a dated sequence with an evaluation gate in front of every later step.

For the regional setting I keep Southeast Asia SAF open beside it. The Indonesia SAF policy question therefore turns on scope and sequence, and I take it in that order.

Five plain terms carry this article. A roadmap is a published direction with dates and programmes, a blending mandate is a legal requirement to mix a share of SAF into jet fuel, an action plan lists who does what and when, feedstock is the raw material such as used cooking oil, and collection rate is the share of that material actually gathered.

In short

  • What the government published: a roadmap and national action plan to 2060, not a law.
  • First obligation: A 1% blend on international departures from 2027.
  • Airport scope: Two airports, about 53% of international flight traffic.
  • Feedstock: Used cooking oil, with a 23% collection rate today.
  • Open question: An evaluation sits in front of every step after the first.
Facebook
Twitter
LinkedIn

In this article

What Indonesia has actually published

The Government of Indonesia’s Sustainable Aviation Fuel Industry Development Roadmap and National Action Plan sets policy direction and strategies for the domestic SAF industry, and it was prepared with the Coordinating Ministry for Maritime Affairs and Investment, supported by the Ministry of Energy and Mineral Resources and the Ministry of Transportation. Its three objectives are decarbonisation of the aviation sector, energy sovereignty and security through local feedstock in accordance with the mandate of Law No. 30/2007 on Energy, and economic value creation by producing SAF at home for regional and domestic markets. Indonesia has committed to achieve net zero emissions before 2060. The updated national blending target covers 2027 to 2060, with an initial target of 1% in 2027, reaching 20% by 2045 and a long-term goal of a 50% SAF blend by 2060.

An earlier target set by the Ministry of Energy and Mineral Resources Regulation No. 12/2015, of 2% in 2016, 3% in 2020 and 5% in 2025, was not achieved.

What this means for you: I read the roadmap as a direction with dates attached. In addition, I treat 1% in 2027 as the only step I can underwrite today.

Where the first 1% applies

I place the mandate geography first, because blending mandates across Asia-Pacific are not all written the same way. Indonesia will require flights to use sustainable aviation fuel from 2027, with international flights departing the country required to use a 1% SAF share in their fuel mix. The 1% requirement applies to international flights departing from Soekarno-Hatta International Airport and I Gusti Ngurah Rai International Airport. In addition, those two airports account for approximately 53% of Indonesia’s international flight traffic. The roadmap’s programme D1.B establishes a mandate for SAF use on international flights from those two airports. In addition, the Ministry of Transportation confirmed a 2027 start, and the rule will apply only to those two airports. The same programme then increases blending for those airports until 2039 and implements a blending mandate for all flights from major airports starting in 2040.

What this means for you: The first obligation covers two airports rather than the whole network, so I size the early demand curve on that footprint and not on the national fleet.

What is running today

The technical question is the one I settle first, and sustainable aviation fuel has already been flown in Indonesia rather than only discussed. Pelita Air ran the SAF trials with an Airbus A320 on the Jakarta to Denpasar route. Also, Denpasar to Jakarta routes between August and December 2025. In addition, the trials have entered the commercial operation phase and proceeded without any problems. Engineers ran technical tests at a test cell and the engines operated normally. No technical issue arose during the six-month SAF trial on commercial flights. Implementation will depend on the readiness of SAF supplies from PT Pertamina, which is expanding production capacity through several domestic refineries.

Pertamina projects its green refinery reaching SAF production capacity of 306 million liters per year by 2027. Also, Pertamina has already conducted trials with Garuda Indonesia. Also, Pelita Air, and has signed a SAF sales contract with an international airline to support flights operating from Soekarno-Hatta Airport and Bali.

What this means for you: The hardware risk looks manageable to me. In addition, the line I test before anything else is the volume and price of SAF that the national fuel supplier can actually deliver.

What counts, and where the fuel has to go

To qualify under international sustainability frameworks, SAF must meet stringent sustainability and lifecycle emissions-reduction criteria such as those set by ICAO under the CORSIA framework. International frameworks and certification schemes require traceability and independent verification throughout the supply chain. Most SAF production uses waste and residue feedstocks through the HEFA pathway, typically delivering lifecycle emissions reductions of around 80% compared with conventional aviation fuel. In addition, SAF currently represents less than 1% of global aviation fuel use. Key markets such as the European Union exclude palm oil-based SAF from counting towards regulatory SAF mandates and targets. Europe’s SAF blending mandate kicked in on 1 January 2025 starting at 2%.

In addition, SAF produced in Asia has tended to flow to Europe where mandates create a price premium. IATA also asks governments to support the development and recognition of global SAF book-and-claim systems consistent with the purchase-based claiming approach allowed under CORSIA.

What this means for you: I keep two ledgers, one for the volume that counts under the Indonesian rule. Also, one for the volume that counts in Europe, because palm oil-based molecules satisfy the first and not the second.

Feedstock, the part that has to move first

I start the supply line with feedstock availability in Southeast Asia, because nothing else moves without it. Indonesia and Malaysia account for 58% and 25% of global palm oil production respectively. Indonesia’s roadmap focuses strongly on used cooking oil as a feedstock. The country collects only an estimated 23% of the UCO it produces domestically. Indonesia likely produces 700,000 to 900,000 tonnes of practically and economically collectable UCO per year, and aggregating 715,000 tonnes of UCO per year would provide feedstock for the production of 187,000 kiloliters of SAF. In 2024, Indonesia exported approximately 95% of its collected UCO to other countries. In addition, the government has more recently banned the export of both UCO and POME.

The roadmap’s own modelling assumes the UCO collection rate rises from 25% in 2025 to 70% in 2060 while the export rate falls from 95% in 2025 to 40% in 2060.

What this means for you: Until the collection rate moves. Also, the export ban holds, I model domestic SAF supply as constrained no matter what the blending curve says.

What a lender reads in a roadmap

I read this section through a lender’s eyes, and I start with reaching FID. IATA states that any SAF mandate needs sufficient market conditions, production capacity, infrastructure readiness and policy support in place. Neither the Indonesian nor the Malaysian proposal has fully crystallized into law, limiting investor certainty. SAF remains 4 to 6 times more expensive than fossil avtur in Indonesia. Developing alternative SAF production technologies such as Alcohol-to-Jet, Fischer-Tropsch. Also, Power-to-Liquid needs an estimated investment of US$6.14 billion to meet domestic SAF demand until 2060. Projections put Indonesia’s aviation fuel demand at 15.76 million kiloliters by 2060.

Global SAF production should reach around 2.4 million tonnes in 2026, just 0.8% of aviation fuel use. That costs airlines $4.3 billion. A roadmap gives me a direction and a first date, and it does not give me a contracted buyer.

What this means for you: I separate the policy date from the demand date. This happens because a lender will fund the second one and the roadmap only publishes the first.

Where the sequence can stall

Indonesia did not meet its first national blending target. This the roadmap itself reads as a sign that the industrial environment may not have been ready. The ministry will set the initial blend at 1% to ensure safe, effective and compliant implementation. After the government implements that blend, it will run a comprehensive evaluation before considering a gradual increase. That sentence is the hinge of the policy: each step is conditional on the evaluation after the previous one. In addition, the evaluation sits after the first compliance year rather than before the debt tenor starts. I therefore treat 2027 as a test date, not as the start of a fixed schedule.

Published readings of the later steps differ, so I hold them apart. One account describes a planned increase to a 5 percent SAF blend in 2029 to 2030, and puts the long-term figure at 30 to 50 percent by 2060. I record each reading against its own source and I do not merge them into a single curve.

What this means for you: The policy has an evaluation gate where a debt schedule has a drawdown. In addition, I ask which of the two my numbers assume before I sign anything.

How I would model it if it were my file

I treat the file as a table rather than a story. Also, I write the target line as a sequence of dated steps, 1% in 2027, 20% in 2045, 50% in 2060. In addition, I mark which of those steps has an evaluation in front of it. I put the airport scope next to it, because the first obligation covers two airports and not the whole network. In addition, I keep the feedstock line separate, with the collection rate. Also, the export ban as the two variables that decide whether domestic supply exists at all. I run the model with no increase after the 2027 evaluation.

In addition, I show the lender the difference in one line. I add the cost line as published, at 4 to 6 times fossil avtur. Therefore, the premium is visible from the first cell. My last row is the signed offtake, because that is the only row a lender will count.

What this means for you: the file I hand over has five rows, target, scope, feedstock, cost and offtake. Four rows already sit in the public documents, and only the fifth is mine to negotiate.

Sources

Frequently asked questions

It is the Sustainable Aviation Fuel Industry Development Roadmap and National Action Plan, which proposes a blending target of 1% in 2027 rising to 20% by 2045 and 50% by 2060, built on three objectives: decarbonisation of the aviation sector, energy sovereignty and security under Law No. 30/2007 on Energy, and economic value creation from domestic SAF production.

On international flights departing Soekarno-Hatta International Airport and I Gusti Ngurah Rai International Airport, which account for approximately 53% of Indonesia’s international flight traffic, and implementation is targeted to begin in 2027 with those two airports only.

Yes. The Ministry of Energy and Mineral Resources Regulation No. 12/2015 set targets of 2% in 2016, 3% in 2020 and 5% in 2025, and those targets were not achieved, which the roadmap reads as a sign that the industrial environment may not have been ready.

It gives a direction and a first compliance date, but the proposal has not fully crystallized into law and SAF remains 4 to 6 times more expensive than fossil avtur, so a project still needs a contracted buyer before a lender will count the demand line.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are sizing a project or a lending file against this roadmap, I can test the scope, the sequence. Also, I agree the feedstock line with you before we fix the model. In addition, the commercial anchor I look for first sits in offtake agreements.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles