Insights
Insights on low-carbon fuel finance
Notes and guides on how low-carbon fuel and circularity projects get financed, find offtake and reach FID in Southeast Asia.
Browse by topic, or read the latest articles below.
What this hub covers
Fuel and sector guides
Pillar guides on SAF, green methanol, hydrogen and PtX, and waste-to-energy.
How to finance and reach FID
Explainers on financing a project, securing offtake and moving toward a final investment decision.
Market notes
Shorter outlook pieces on SAF, green hydrogen, green ammonia and other low-carbon fuel markets.
Latest articles
Articles from the WeConnect Asia archive, and new notes as they are published.
Vietnam, Indonesia, Malaysia and the Philippines host green hydrogen projects past announcement. See who builds what, at scale and near FID.
Green hydrogen projects in Southeast Asia have ambition and capital interest, but almost no signed offtake. Here is what developers in Indonesia, Malaysia, Vietnam and the Philippines need to fix before FID.
Green hydrogen technology choices in Southeast Asia compared: alkaline, PEM and ATR electrolysis on cost, efficiency, scale and bankability.
A 600 MW electrolyzer in Batam, paired with solar and batteries, is targeting pipeline exports to Singapore at $3 per kg. Here is what that price point tells you about plant design.
A benchmark guide to green hydrogen production costs in 2026: the power-price-to-cost table every developer should know, the China electrolyzer cost gap, and realistic timelines for parity with grey hydrogen.
A green ammonia plant is five blocks wired together. I walk through the anatomy, the capex split and what a lender checks before FID.
To export SAF to Europe, a Southeast Asia plant needs certified feedstock, a credible buyer and logistics. Here is the checklist before FID.
E-methanol project finance rests on CO2 supply, power cost and a shipping offtake. I explain what lenders check and where first deals stick.
A developer's walkthrough of the green hydrogen production process, from electrolyzer choice to renewable power supply, with Vietnam's seawater-electrolysis Tra Vinh plant and Sarawak's modular 10 MW project as real-world benchmarks.
Have a project to discuss?
Tell me where your project stands. I will tell you what to read, and who to talk to.