We Connect Asia

Insights

Insights on low-carbon fuel finance

Notes and guides on how low-carbon fuel and circularity projects get financed, find offtake and reach FID in Southeast Asia.

Browse by topic, or read the latest articles below.

What this hub covers

Fuel and sector guides

Pillar guides on SAF, green methanol, hydrogen and PtX, and waste-to-energy.

How to finance and reach FID

Explainers on financing a project, securing offtake and moving toward a final investment decision.

Market notes

Shorter outlook pieces on SAF, green hydrogen, green ammonia and other low-carbon fuel markets.

Latest articles

Articles from the WeConnect Asia archive, and new notes as they are published.

How biogas power plants convert captured methane into electricity through gas engines, with a real Malaysian multi-site Jenbacher engine project and a Thai utility microgrid demonstration as reference points.
Green hydrogen is made by splitting water with renewable power. I explain the basics, where projects get built and what investors check.
Southeast Asia's biomethane potential is enormous and almost untapped. Here is what feedstock, offtake and certification structure actually gets a project in Malaysia, Indonesia or Thailand financed.
Why Singapore's 300 MW biomethane sandbox is a regional demand signal aimed at biogas producers in Malaysia and Indonesia, and what it means for how developers should design their projects for export.
Why scaling biomethane production in Southeast Asia increasingly means clustering multiple feedstock sources rather than building a bigger single plant, with Indonesia's eight-mill, 830,000 MMBtu/year cluster as the regional reference.
SAF offtake gets most of the attention. Waste-to-energy and biomethane projects need their own version, built around a different buyer and a different commodity. Here is what that looks like.
Malaysia's 16-year biogas Feed-in Tariff looks attractive on paper, but the real decision for developers and palm oil mill owners is local consumption versus PPA versus grid injection, and distance to the point of interconnection is what actually decides it.
Before a hydrogen production plant reaches FID, the site must answer five questions on power, water, land, permits and offtake.
A clear-eyed look at the green hydrogen investment landscape in Southeast Asia: the USD 19 billion in tracked projects, the gap between announced capital and actual FID, and what that means for developers and investors.

Have a project to discuss?

Tell me where your project stands. I will tell you what to read, and who to talk to.