We Connect Asia

Insights

Insights on low-carbon fuel finance

Notes and guides on how low-carbon fuel and circularity projects get financed, find offtake and reach FID in Southeast Asia.

Browse by topic, or read the latest articles below.

What this hub covers

Fuel and sector guides

Pillar guides on SAF, green methanol, hydrogen and PtX, and waste-to-energy.

How to finance and reach FID

Explainers on financing a project, securing offtake and moving toward a final investment decision.

Market notes

Shorter outlook pieces on SAF, green hydrogen, green ammonia and other low-carbon fuel markets.

Latest articles

Articles from the WeConnect Asia archive, and new notes as they are published.

Toyo Engineering, PIHC and Itochu are not building a new ammonia plant in Aceh, they are retrofitting one. Here is why that production route changes a project's economics and timeline.
The ammonia production process runs from water and air to electrolysis and synthesis. I walk through each step and where projects stall.
What separates a biomethane plant from a biogas plant: the gas-upgrading step that enables grid injection and vehicle fuel markets, with Malaysia's 2025 grid injection milestone and real Southeast Asia potential and cost data.
The biogas production process explained through its four biological stages, hydrolysis, acidogenesis, acetogenesis, and methanogenesis, plus the CSTR and GFS tank technology used in Thailand's livestock wastewater biogas projects.
Your feedstock choice shapes biogas production economics: yield per tonne, collection radius and transport cost decide it, not the digester.
Petronas, Enilive and Euglena are building a 650,000 tonne biorefinery in Johor that makes SAF, HVO and bio-naphtha from the same feedstock pool. Here is why that flexibility is what got it past FID.
Power-to-liquid turns renewable power, water and CO2 into drop-in fuels. I explain the chain, the cost drivers and what investors check.
How biogas plants work in Southeast Asia, from palm oil mill effluent (POME) capture to pipeline-grade biomethane, with Indonesia's 125-million-tonne POME opportunity and a Malaysian multi-site build-operate-own structure as real examples.
Green ammonia is made from renewable hydrogen and nitrogen. I explain uses in fertiliser, shipping and power, and what it takes to finance.

Have a project to discuss?

Tell me where your project stands. I will tell you what to read, and who to talk to.