Home » Maritime Fuel Regulation: The Three Regimes That Create Demand for Low Carbon Marine Fuels
Maritime Fuel Regulation: The Three Regimes That Create Demand for Low Carbon Marine Fuels
10 min read · Nov 2, 2026 · By Alex
Three regimes will decide whether a low carbon marine fuel finds a buyer. The International Maritime Organization’s Net-Zero Framework won approval on 11 April 2025, but adoption is not complete. Meanwhile, FuelEU Maritime has been in force since 1 January 2025. The European emissions trading system covers 40% of shipping emissions in 2024 and 100% in 2026. I read them as one calendar for a project at concept stage. In maritime fuel regulation, all three will create demand, and each does it on its own date. I set them beside the wider sustainable marine fuel picture so the dates can be read together.
I write from the perspective of a fuel project developer who needs a compliant sale, not a summary of documents. What follows is what each rule requires, the date it applies, and the price it puts on doing nothing. I keep the sources visible so readers can check every date.
In short
- IMO: Approved on 11 April 2025, adoption vote adjourned in October 2025 to 2026.
- FuelEU: In force since 1 January 2025, a 2% intensity cut in 2025 rising to 80% in 2050.
- EU ETS: Shipping coverage went from 40% in 2024 to 100% in 2026.
- Cost: 39 euro per tonne of non-compliance in 2025, rising to 1,997 euro per tonne in 2050. Specifically, the figure applies to a fossil fuel.
- Verification: A scheme recognized by the Marine Environment Protection Committee must verify emissions and sustainability.
In this article
Three regimes, three dates
The Marine Environment Protection Committee approved the International Maritime Organization’s Net-Zero Framework. Specifically, the committee met at its 83rd session, from 7 to 11 April 2025. As a result, the plan set formal adoption for October 2025 and entry into force for 2027. The IMO FAQ records that the committee met from 14 to 17 October 2025. Then it adjourned for one year, to 2026. Approval and adoption therefore stay two separate states. Under tacit acceptance, the text passes after a minimum period unless someone objects formally. Ships have applied FuelEU Maritime, regulation (EU) 2023/1805, in full since 1 January 2025. The European emissions trading system covered 40% of shipping emissions in 2024, 70% in 2025 and covers 100% in 2026. Three geographies, three calendars, one fleet.
What this means for you: I plan around dates that already exist, not announcements. Consequently, the adjournment recorded in the IMO FAQ overtakes any project that assumes an October 2025 adoption. The three calendars are the ones I keep in my file.
The global rule
The framework sits in a new Chapter 5 of Annex VI of MARPOL, which has 108 Parties covering 97% of the world merchant fleet by tonnage (IMO, 11 April 2025). It binds ocean-going ships above 5,000 gross tonnage, the volume measure used to set regulatory thresholds. Also, those ships emit 85% of the total CO2 emissions of international shipping.
Two obligations follow. A global fuel standard requires ships to cut their annual greenhouse gas fuel intensity, written in grams of carbon dioxide equivalent per megajoule and measured well-to-wake, from fuel production to combustion on board, covering carbon dioxide, methane and nitrous oxide (IMO FAQ). The global economic measure requires ships above the thresholds to acquire remedial units. For example, a remedial unit balances an emission deficit. By contrast, zero or near-zero technologies earn rewards. Two compliance tiers apply: a Base Target and a Direct Compliance Target. As a result, exceeding the second generates surplus units. The framework itself is where I read those two tiers.
What this means for you: a fuel that only clears the Base Target generates no surplus. Therefore, I read the two tiers before I quote a price.
The European rule
FuelEU Maritime caps the yearly average greenhouse gas intensity of the energy used by ships above 5,000 gross tonnage calling at European ports, whatever their flag, and cuts it by 2% in 2025 against the 2020 average, then 6% in 2030, 14.5% in 2035, 31% in 2040, 62% in 2045 and 80% in 2050 (European Commission). DNV puts the 2020 baseline at 91.16 gCO2e/MJ. DNV notes that the requirement covers 100% of energy on voyages and port calls inside the EU or EEA. In addition, it covers 50% of the energy on voyages in or out. Those ships are 55% of all ships and 90% of the sector’s CO2 emissions.
From 1 January 2030, passenger and container ships must take shore power. Specifically, the ports concerned are those covered by the alternative fuels infrastructure rules. In addition, from 1 January 2035 the duty extends to every EU port developing that capacity. The European intensity ladder is the most predictable of the three.
What this means for you: I model a European offtake against a dated ladder. Therefore, a published percentage sets what I must hit in 2030, and it will not move.
What each rule pays for
Price is where regulation becomes demand. For a fossil reference fuel, FuelEU non-compliance costs 39 euro per tonne in 2025. By 2035 the charge is 353 euro per tonne, and by 2050 it reaches 1,997 euro. At an allowance price of 100 euro, the trading system adds 321 euro per tonne for that same fuel, an allowance being a permit to emit one tonne of carbon dioxide equivalent that trades on a market (Methanol Institute, September 2024). Allowances traded between 50.45 euro and 104.81 euro between May 2021 and May 2024. Also, shipping emissions coverage rises from 40% in 2024 to 100% in 2026. On the International Maritime Organization side, receipts from the economic measure fund a Net-Zero Fund that rewards low-emission ships and supports innovation, infrastructure and a just transition (IMO, 11 April 2025). The cost of compliance is the line a lender reads first.
What this means for you: I convert every deficit into the currency of my contract. Consequently, I do it year by year, before I sign an offtake.
How compliance units move
Both systems run on units rather than on declarations. Under the framework approved on 11 April 2025, a ship balances a deficit by transferring surplus units from other ships, by using banked surplus units, or by acquiring remedial units through contributions to the Net-Zero Fund. A digital registry follows the status of each ship, recording banked units, remedial units, calculations, transfers and cancellations (IMO FAQ). A ship that clears its target can bank or trade the surplus. Also, a ship on zero or near-zero fuels qualifies for rewards. FuelEU Maritime works the same way at European level.
The International Maritime Organization requires independent verification of emissions and sustainability. It accepts only a certification scheme recognized by its Marine Environment Protection Committee (IMO FAQ). Moreover, the Methanol Institute analysis of September 2024 models ships pooling their intensity reductions. The certificate side of a fuel sale is a regulated record, not a claim.
What this means for you: I ask who signs the certificate and where the unit record sits. The record matters because my buyer’s auditor will read it.
What the rules mean in Asia
The framework follows the ship, not the flag: it applies to ocean-going ships above 5,000 gross tonnage wherever they trade, and enforcement rests with flag States, port States and coastal States (IMO FAQ). The European rule follows the port call. This is why a producer in Southeast Asia selling into Europe reads FuelEU Maritime even with no European asset, since the intensity limit applies to ships calling at European ports regardless of flag (European Commission). The Global Maritime Forum sets the range of outcomes. Adoption as agreed later in 2026 would mean entry into force in 2028 and application in 2029. By contrast, a prolonged deadlock would delay regulatory certainty for several years.
Its 2023 strategy target, that zero or near-zero fuels reach at least 5% of the energy used by international shipping by 2030 with an aspiration of 10%, is the demand signal I model. The mandate landscape is what turns my volume into a compliant sale.
What this means for you: I size my plant against a published percentage for 2030, not against a ship order book I cannot verify.
What I would ask before I plan around a rule
I ask five questions in writing before I let a rule into my model. First, which milestone has the measure reached: approved, adopted or already in force, and on which date. Second, which ships and which voyages it covers, by gross tonnage and by port call. Third, what the intensity metric is and which baseline year it uses. Since FuelEU Maritime measures against a 2020 baseline, the framework sets a target for each year until 2035. Fourth, what a deficit costs in the currency of my contract, year by year. Fifth, who verifies the fuel and where the unit record sits. In fact, the IMO FAQ states that emissions and sustainability need independent verification. Only a scheme recognized by the Marine Environment Protection Committee qualifies. I keep those five answers on one page. Also, each line carries a date, a ship class and a source.
What this means for you: I must answer a rule on all five lines in writing. As a result, a rule I cannot answer that way stays out of my base case for the project.
How I would build the calendar if it were my file
I keep four dated rows on one sheet. First, the approved row carries the Marine Environment Protection Committee approval of 7 to 11 April 2025. In addition, it carries the adjournment of 14 to 17 October 2025. Second, the in-force row carries FuelEU Maritime from 1 January 2025. Moreover, it carries the trading system at 40% in 2024, rising to 100% in 2026. The cost row carries 39 euro, 353 euro and 1,997 euro per tonne of non-compliance for 2025, 2035 and 2050. My last row is the verification row. It names the scheme that will sign my fuel, because no unit in the rows above exists without it. I would also mark the two dates I cannot control. One is the adoption vote, rescheduled to 2026. Consequently, entry into force follows 16 months after it.
What this means for you: every line carries a date, a figure and a published source. I hand this sheet to a financier or a fuel buyer, so nobody has to take my word. Finally, the sheet states the rule’s stage: approved, adopted or in force.
Sources
- IMO, 11 April 2025.
- IMO FAQ page, consulted 16 November 2026.
- Global Maritime Forum, page consulted 16 November 2026.
- European Commission, page consulted 16 November 2026.
- DNV, page consulted 16 November 2026.
- Methanol Institute, September 2024.
Frequently asked questions
What is the IMO maritime fuel rule called?
It is the IMO Net-Zero Framework, approved at the 83rd session of the Marine Environment Protection Committee from 7 to 11 April 2025 and written into a new Chapter 5 of Annex VI of MARPOL. It is the first regulation in the world to combine binding emission limits with a greenhouse gas price for a whole sector, pairing a global fuel standard that lowers greenhouse gas fuel intensity with a global mechanism built on units (IMO, 11 April 2025).
Which ships does the IMO Net-Zero Framework cover?
Ocean-going ships above 5,000 gross tonnage, which account for over 85% of global shipping emissions. Ships below that threshold are not covered at present, and a discussion covers their possible inclusion between 400 and 5,000 gross tonnage (IMO FAQ).
What does FuelEU Maritime require from 2025?
A 2% cut in the greenhouse gas intensity of the energy used on board against the 2020 average, rising to 6% in 2030 and 80% in 2050, measured well-to-wake. Passenger and container ships must also take shore power: from 1 January 2030 in the ports covered by the alternative fuels infrastructure rules, and from 1 January 2035 in every EU port developing that capacity. The limit covers 100% of the energy on voyages inside the EU or EEA and 50% on voyages in or out (European Commission; DNV).
Is the IMO rule already law?
Not yet. The draft regulations were approved in April 2025, the adoption vote scheduled for October 2025 was adjourned until 2026, and entry into force is expected 16 months after adoption under tacit acceptance (IMO FAQ). Once adopted, the framework will be reviewed every five years.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you want the intensity ladder applied to your own voyages and fuel volumes, I run that calculation with you: EU compliance and carbon intensity support, so the percentages, dates and cost lines above sit in one model for your project. It is the step I take before any offtake conversation.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.