Home » Green Methanol Carbon Intensity: The Numbers a Buyer Will Check
Green Methanol Carbon Intensity: The Numbers a Buyer Will Check
10 min read · Nov 2, 2026 · By Alex
The number you must prove depends on which rule is asking. For a European renewable fuel the fossil comparator is 94 gCO2eq/MJ. In addition, the ceiling is 70 percent below it, that is 28.2 gCO2eq/MJ delivered, recorded by the European Hydrogen Observatory on 3 November 2026. For ships the baseline is the fleet’s 2020 average from fuel sourcing to the ship’s engine, called well-to-wake, at 91.16 gCO2e/MJ, recorded by DNV on the page consulted on 16 November 2026. Also, for the global fuel standard my methanol carbon intensity number is read against a current average of 93.3 gCO2eq/MJ, with zero and near zero fuels generally at up to 19.0 gCO2eq/MJ, recorded on the framework FAQ consulted on 16 November 2026. I settle the molecule first, on the green methanol explained page.
Carbon intensity is the grams of carbon dioxide equivalent attached to each megajoule of fuel. In addition, a fossil comparator is the reference fuel a rule measures a renewable fuel against. Because each regime draws its boundary differently, one sentence saying the number is X cannot serve three reviewers.
In short
- European renewable fuel: 94 gCO2eq/MJ comparator and a 28.2 gCO2eq/MJ ceiling, directive page updated 3 November 2026.
- Fleet baseline: 91.16 gCO2e/MJ, the 2020 fleet average, topic page consulted 16 November 2026.
- Global fuel standard: 19.0 gCO2eq/MJ near zero against a current average of 93.3 gCO2eq/MJ, framework FAQ consulted 16 November 2026.
- Boundary: well-to-wake combines well-to-tank and tank-to-wake, working group’s page updated 16 June 2025.
- Proof: independent verification and the offtake contract, port study published November 2025.
In this article
Three numbers, three questions
Three published baselines answer three different questions: the European ceiling of 94 gCO2eq/MJ and its 28.2 gCO2eq/MJ limit. Both recorded on 3 November 2026, the fleet baseline of 91.16 gCO2e/MJ for 2020, recorded on 16 November 2026, and the near zero level of 19.0 gCO2eq/MJ against a current average of 93.3 gCO2eq/MJ, recorded on 16 November 2026. A reviewer never asks for a number in the abstract, because every rule asks for it against something.
Each regime counts the same molecule on a different boundary and against a different reference, so one sentence saying the number is X cannot serve three reviewers. I treat a baseline as the reference figure a rule then reduces against, and I write the method beside every value. Before any of these calculations start, the green methanol explained page fixes the molecule itself.
What this means for you. I bring one figure per rule into the room, each with its boundary, its reference and its date, rather than one headline number a reviewer can dismiss.
The fleet baseline
The topic page consulted on 16 November 2026 records that FuelEU Maritime requires the annual average greenhouse gas intensity of energy used by ships trading in the EU or the EEA, expressed in gCO2e per megajoule and calculated in a well-to-wake perspective covering extraction, cultivation, production. In addition, transport of the fuel plus the energy used on board, and that the baseline is the average well-to-wake intensity of the fleet in 2020, 91.16 gCO2e/MJ. The same page, consulted on 16 November 2026, records reductions of 2 percent in 2025, 6 percent in 2030, then an acceleration from 2035 to reach 80 percent by 2050, and that the requirement applies to 100 percent of energy on voyages and port calls within the EU or the EEA and 50 percent on voyages into or out of it. The FuelEU Maritime page carries that trajectory in full.
Also, the European Commission’s own FuelEU page, consulted on 16 November 2026, records Regulation (EU) 2023/1805 in force since 1 January 2025, the same reduction series of 2 percent in 2025, 6 percent in 2030, 14.5 percent in 2035, 31 percent in 2040, 62 percent in 2045 and 80 percent in 2050, the coverage of carbon dioxide, methane and nitrous oxide on a well-to-wake basis, and the fact that ships above 5,000 gross tonnes are 55 percent of all ships and 90 percent of the sector’s carbon dioxide emissions.
What this means for you: I pair my figure with the reduction due in the voyage year and call the gap between the two the compliance balance.
The same measure at global scale
The framework FAQ consulted on 16 November 2026 records that the greenhouse gas fuel intensity is expressed in grams of carbon dioxide equivalent per megajoule and covers carbon dioxide, methane and nitrous oxide across the whole fuel life cycle on a well-to-wake basis, and that zero. In addition, near zero emission fuels and technologies generally sit at up to 19.0 gCO2eq/MJ against a current average of 93.3 gCO2eq/MJ.
The same FAQ, consulted on 16 November 2026, records that the framework applies to ocean-going ships above 5,000 gross tonnes, which emit 85 percent of international shipping’s carbon dioxide, that emissions. In addition, sustainability must be verified independently by a recognised sustainable fuel certification scheme, and that the MEPC agreed in October 2025 to postpone its adoption session by one year. The IMO net zero framework page explains how a ship will hold that number.
Because the intensity is calculated over the whole life cycle. The figure a fuel carries travels with the fuel and is checked where the ship complies.
What this means for you: I call a fuel near zero only when it sits at or below 19.0 gCO2eq/MJ recorded on 16 November 2026 under the framework’s own method, and I attach the independent verification to it.
The comparator behind the 70 percent
The directive page updated on 3 November 2026 records that the maximum greenhouse gas intensity threshold is 70 percent of a fossil fuel comparator of 94 gCO2eq/MJ, which puts a renewable fuel of non-biological origin at no more than 28.2 gCO2eq/MJ delivered to the final consumer. A renewable fuel of non-biological origin, an RFNBO, is made from renewable electricity and captured carbon dioxide. The same page, updated on 3 November 2026, records that two delegated acts of 10 February 2023 set the production methodology and the life cycle calculation, Regulation (EU) 2023/1184 and Regulation (EU) 2023/1185.
Also, the same page, updated on 3 November 2026, records that renewable electricity must come from an installation commissioned within 36 months before the electrolyser and without public funding, that installations operational before the end of 2027 follow additionality only from 1 January 2038, and that RED III has been in force since November 2023 with a 2030 transport choice between a 14.5 percent greenhouse gas reduction and a 29 percent renewable share. The RFNBO page sets out that definition.
What this means for you: the electricity statement decides most of the result, so I place it in the data room beside the intensity table rather than after it.
Comparing two molecules on one basis
The fuel tester’s note from VPS, consulted on 17 November 2026, records that the industry bunkers 230 million tonnes of fuel a year for 716 million tonnes of carbon dioxide equivalent, that 13 ports now offer methanol bunkering while that methanol is predominantly grey and its emissions in the engine are close to those of conventional fossil fuels, and that green methanol sources offer near-zero greenhouse gas emissions. On 17 November 2026 the same note also records that methanol carries half the energy of today’s maritime fossil fuels and a flash point of 12 degrees Celsius, and that 39 methanol powered ships are at sea with 262 on order.
GESAMP’s working group page, updated on 16 June 2025, records that tank-to-wake runs from the ship’s fuel tank to its use as the downstream emissions, that well-to-tank runs from primary sourcing to bunkering as the upstream emissions, and that a life cycle assessment combines the two into one well-to-wake figure, with the guidelines covering carbon dioxide, methane and nitrous oxide. The same page, updated on 16 June 2025, records that the first guidelines were adopted at MEPC 80 and revised at MEPC 81 in April 2024, and that the 2023 IMO strategy puts zero and near zero fuels at 5 to 10 percent of energy used by international shipping by 2030. The SAF. In addition, methanol comparison applies the same discipline to two fuels.
What this means for you: I publish one figure with both halves of the chain named, because an engine-only claim tells a reviewer nothing about where the carbon came from.
What a mandate accepts as proof
The port study by Oceans North and Arup, published in November 2025, records a lifecycle reduction of at least 90 percent when moving from heavy fuel oil to e-methanol on the high end of its ranges, where lifecycle means the total from fuel production through to use, and that 30 years of production at the studied plant would displace 11.5 million tonnes of carbon emissions over its life.
Also, the same study, published in November 2025, records a plant of 200,000 tonnes a year by 2040 in four phases. A levelised production cost of about 1,860 USD a tonne of e-methanol against 383 USD for marine gasoil, 357 USD for very low sulphur fuel oil and 234 USD for heavy fuel oil on an equivalent energy basis, and it lists securing product offtake agreements among the constraints it identifies. In addition, a mandate or a buyer reads those two things together: the calculated saving and the contract that carries it. The low carbon fuel mandates page shows what each regime accepts.
What this means for you. A high percentage without a signed offtake is a projection, and I label it as a projection in every table I build.
What I would demand in a data room
I ask for five documents. The measured intensity with its method and its boundary. Therefore, I can see whether it is well-to-wake or only tank-to-wake. The electricity statement behind it, since the additionality rules decide most of the result. Also, the carbon source statement, since captured carbon dioxide must not be claimed twice. The certificate that ties the figures to the site. And the independent verification that a buyer will ask for anyway.
I also ask for the reference each figure is measured against. That is because a ceiling of 94 gCO2eq/MJ recorded on 3 November 2026. In addition, a fleet baseline of 91.16 gCO2e/MJ recorded on 16 November 2026 are different objects. Two numbers calculated on different boundaries are not comparable, however close they look. Nothing in that package depends on a conversation with me.
What this means for you: I hand over a package where every figure carries its method, its reference and its date. Therefore, a reviewer can check it before asking me anything.
How I would keep the number
I keep four dated rows. The fuel row carries the value in gCO2e per megajoule on a well-to-wake basis. Also, the reference row carries 94 gCO2eq/MJ and the 28.2 gCO2eq/MJ ceiling recorded on 3 November 2026. The ship row carries 91.16 gCO2e/MJ as the 2020 baseline recorded on 16 November 2026 and the reduction due in the year of the voyage. In addition, the evidence row carries the verification report.
Every row states its method, because two numbers calculated on different boundaries are not comparable. I update the reduction row each year, and I never move a projection into the measured row.
Moreover, I date every row on the day the source was consulted or published. Therefore, an older figure can never pass as a current one. In addition, I keep the four rows on a single page that a reviewer can read without a covering note.
What this means for you: when the compliance reviewer opens the file. The figure they need sits beside its reference, its boundary and its date. In addition, nothing has to be rebuilt from memory.
Sources
- European Hydrogen Observatory, 3 November 2026.
- DNV, FuelEU Maritime, 16 November 2026.
- European Commission, FuelEU Maritime, 16 November 2026.
- IMO, The IMO Net-Zero Framework FAQs, 16 November 2026.
- GESAMP, WG 46, 16 June 2025.
- VPS, 17 November 2026.
- Oceans North and Arup, Port of Vancouver E-Methanol Study, November 2025.
Frequently asked questions
Which carbon intensity number does my methanol actually need?
It depends on the question asked: 28.2 gCO2eq/MJ is the European renewable fuel ceiling against a fossil comparator of 94 gCO2eq/MJ recorded on 3 November 2026, 91.16 gCO2e/MJ is the 2020 fleet baseline that FuelEU Maritime reduces against, recorded on 16 November 2026, and the global fuel standard looks at whether a fuel sits at or below the near zero level of 19.0 gCO2eq/MJ against a current average of 93.3 gCO2eq/MJ recorded on 16 November 2026.
What is the difference between well-to-wake and tank-to-wake?
Tank-to-wake covers what happens in the ship’s engine from the fuel tank onwards, well-to-tank covers everything upstream from primary sourcing to bunkering, and well-to-wake combines the two, which is the boundary both European and global rules use. That is why an engine-only figure cannot be compared with a full chain figure, even when both are expressed in gCO2e per megajoule.
Why does the same fuel get two different percentages?
Because the baselines are different objects: one is a fossil comparator set in a directive, one is the measured 2020 average of a fleet, recorded on 16 November 2026, and one is a current fleet average against which a near zero level is defined.
Who verifies the figure I publish?
The framework FAQ records that emissions and fuel sustainability must be verified independently by a sustainable fuel certification scheme recognised by the MEPC, and a study like the port one records its own assumptions alongside its results. I publish the scheme name and the report date next to the value.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you want a second reader before these figures leave the data room, I can check the intensity table. The reference each row uses and the evidence behind it. I work from the same documents a compliance reviewer will ask for.
I do not provide investment advice or arrange investments. Also, I act as a strategic advisor and facilitator.nd facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.