We Connect Asia

Methanol

Methanol Feedstock Stress Test: Five Questions Before You Sign the Supply Model

10 min read  ·  Oct 13, 2025  ·  By Alex

methanol feedstock stress test

A methanol plant fails because its feedstock, the raw material it converts, was never free. Every tonnage in the model assumes nobody else is buying. The September 2025 assessment is blunt: less than 35 percent of the global biomass resource potential projected for 2050 is realistically available for bioenergy and biofuels once competing uses are taken out, and around 1,000 Mt of biogenic CO2, meaning CO2 released by recent biological activity, will be shared between e-fuels, bioenergy with carbon capture and removals. That is methanol feedstock supply risk, and the answer to what happens if supply drops is a stress test, a written check of the supply model under strain: contracted tonnage after competing uses, seasonality, substitutability, and a re-supply clause written before the model. The green methanol industry page frames the product this feedstock has to serve.

The 2025 IATA and Worley Consulting assessment sets out the problem: global biomass resource potential could exceed 12,000 Mt by 2050 while industries already use about 60 percent of total biomass resources, so the question is what is left after everyone else has taken their share. I treat that remainder as a contested pool and date every figure.

In short

  • Availability: less than 35 percent of the biomass potential projected for 2050 is realistically available for bioenergy and biofuels once competing uses are taken out, recorded in September 2025.
  • Residues: the leftovers of harvesting and processing: about 12 percent of unconstrained potential, roughly 1,230 Mt in 2030 and 1,580 Mt in 2050.
  • Biogenic CO2: around 1,000 Mt cost-effective by 2050, shared with e-fuels, bioenergy with carbon capture and removals.
  • Price: feedstock from 0 to 17 USD a megajoule in 2021 moves bio-methanol between 320 and 770 USD a tonne.
  • Contract: tonnage after competing uses, an indexation formula and a re-supply clause, written before the model.
Facebook
Twitter
LinkedIn

In this article

What a feedstock stress test actually tests

A feedstock stress test is a written exercise, not a sensitivity table added once the model is finished. I take the supply model as presented, cut the input volume or raise the input price, and read what the plant still delivers to its lenders before I accept the assumption. The test asks five questions in a fixed order: what tonnage is left after competing uses; what the CO2 line is worth if only biogenic volumes count; what the feedstock price band does to my unit cost and to the levelized cost of production, meaning the all-in cost of one tonne across the operating life of the plant; which competitor claims the residue first; and whether the price is indexed, with a stated party to carry the shortfall. Those five checks are what I mean by methanol feedstock supply risk.

What this means for you: the test turns an input assumption into a credit assumption, so I run it while the supply model is still editable rather than after the contracts are drafted.

Counting what is really available

That assessment, published in September 2025, records that less than 35 percent of the global biomass resource potential projected for 2050 is realistically available for bioenergy and biofuels because competing uses take priority. After bioenergy and biofuel demand is served, accessible biomass falls to around 12 percent of the unconstrained potential: about 1,230 Mt in 2030 and 1,580 Mt in 2050, enough for just over 300 Mt of biofuel in 2050. The 2050 mix is 58 percent agricultural residues, 16 percent forestry residues and wood waste, 15 percent municipal solid waste and 11 percent crops and used oils. The same document forecasts about 400 Mt of sustainable aviation fuel in 2050 against the 500 Mt needed, a shortfall of 100 Mt, and names the pace of technology rollout rather than feedstock as the main barrier. The green methanol production page sets out the routes those inputs feed.

What this means for you: if the model assumes unconstrained biomass, the availability line is the first line I strike, and I replace it with the 12 percent accessible share and its date.

The same residues are already spoken for

The same assessment, published in September 2025, records that Europe has 65 to 70 Mt of forestry residues and wood waste available between 2030 and 2050, facing growing competition from traditional energy uses and from emerging bio-based industries such as bio-methanol. It puts Europe’s biogenic CO2 at about 150 Mt in 2050, around 15 percent of global availability. For ASEAN, in that September 2025 record, about 30 percent of agricultural residues remain available for bioenergy, about 25 percent of forestry residues from the timber industry could be collected sustainably for roughly 30 Mt a year to the biofuels market, competition from the biogas market may limit the use of palm oil mill effluent, and municipal solid waste generation should grow by 20 percent by 2050.

On 16 May 2025, Argus recorded Asian methanol demand at about 4.1 million tonnes in 2024 rising to 4.8 million tonnes in 2028, Southeast Asian capacity moving from 7.5 to 10.8 million tonnes after Sarawak came online, biodiesel at 45 percent of regional demand in 2024, and 11 projects in China representing more than 3 million tonnes a year of capacity put on hold. The SAF feedstock availability page for Southeast Asia shows what aviation is asking from the same resource.

What this means for you: when the same residue has two buyers, I need a dated statement of who takes it first, not a note that the resource exists somewhere.

Biogenic CO2 is a market, not a pipe

The European Biogas Association recorded in September 2025 that conventional European CO2 demand was 13.9 Mt a year in 2024 with the merchant market accounting for 56 percent, and that the Commission impact assessment projects emerging markets, essentially e-fuels and storage, will need 344 Mt of CO2 by 2040 for a 90 percent net reduction. The same record puts e-fuels at more than 13 times current merchant volumes within 15 years. Direct air capture is estimated at 300 to 500 EUR a tonne by 2050, and in Germany the absence of a bioCO2 price premium over fossil CO2 can hold back investment while bioethanol production also supplies cheap CO2.

The 2025 feedstock assessment puts cost-effective biogenic CO2 availability at around 1,000 Mt by 2050, over 900 Mt capturable at capture rates of about 90 percent, and notes that a supply limited to non-fossil volumes creates competition between sectors including e-methanol, bioenergy with carbon capture and removals. In that same 2025 assessment, more than 5,000 Mt of industrial CO2 could be cost-effectively captured where rules permit fossil CO2. The biogas production economics page explains where this CO2 comes from.

What this means for you: my CO2 assumption is a purchase with a competing buyer attached, so I date the volume, the source and the price basis in the model and test the line against them.

What the price does to the model

The 2021 outlook from IRENA and Methanol Institute records biomass and municipal solid waste feedstock costs between 0 and 17 USD a megajoule. In that 2021 outlook, bio-methanol costs 320 to 770 USD a tonne with feedstock up to 6 USD a gigajoule and falls to 220 to 560 USD a tonne with process improvements. The same 2021 figures put e-methanol at 800 to 1,600 USD a tonne with CO2 from bio-energy carbon capture at 10 to 50 USD a tonne, and at 1,200 to 2,400 USD a tonne with direct air capture CO2 at 300 to 600 USD a tonne, with 250 to 630 USD a tonne expected by 2050, against fossil methanol at 100 to 250 USD a tonne. Waste streams from other industrial processes simplify feedstock logistics and improve plant economics.

The same outlook puts renewable methanol output below 0.2 Mt a year against about 98 Mt of conventional methanol, with life-cycle emissions around 0.3 gigatonnes of CO2 a year, about 10 percent of chemical sector emissions. A fossil pathway reaches 500 Mt by 2050 and 1.5 gigatonnes of CO2 a year. The power-to-liquid explained page covers the route that depends on cheap renewable power and CO2.

What this means for you: I index the feedstock line and push it through the levelized cost of production, because a band this wide will not hold still.

Writing the supply contract that survives the test

GIZ and NIRAS recorded in 2024, in a pre-feasibility study for e-methanol from biogas and green hydrogen, a recommended equity share of about 30 percent from project company partners, available up front to help secure loan guarantees, funding and investment; a weighted average cost of capital, the blended cost of equity and debt, held at 11 percent in the base case of its sensitivity analyses; and a front-end engineering design phase, the detailed design work between concept and construction, already looking for financing, partners and buyers, with infrastructure agreements, local permits and insurance contracts inside the project company.

The same September 2025 biogas study records that biogas upgrading separates biomethane and bioCO2 and that the CO2 stream feeds hydrogenation to methanol, so the CO2 contract belongs to the input chain. The 2025 feedstock assessment makes the point that agricultural residues, forestry residues and municipal solid waste each need their own collection, pre-treatment and transport logic. The offtake agreements page is where I would draft those clauses.

What this means for you: I draft the supply clause next to the infrastructure agreements, the permits and the insurance, because a re-supply promise outside the project company is a promise nobody has signed.

The five numbers I put in the model before I sign

I ask five questions in writing, before any supply contract is drafted, and I expect a dated answer to each. What tonnage is left after competing uses, using the 12 percent accessible share of unconstrained biomass potential recorded in September 2025. What happens to the CO2 line if only biogenic volumes count, with around 1,000 Mt available globally by 2050 in that September 2025 assessment. What the feedstock band does to my unit cost and to the levelized cost of production, the 0 to 17 USD a megajoule range recorded in 2021. Which competitor takes the residue first, given that Europe’s forestry residues face bio-methanol demand and ASEAN palm oil mill effluent faces the biogas market. And is the price indexed, since bio-methanol moved between 320 and 770 USD a tonne on feedstock alone in the 2021 outlook. None of the five needs a forecast; each is answered from published, dated data, which is why I can run the test before the final investment decision rather than after it.

What this means for you: five answers, five dates, one file. An answer without a date is an assumption I cannot put in front of a lender, so it stays out of the model until someone can source it.

How I would run the test if it were my own file

I keep four dated rows. The availability row carries the 12 percent accessible share of unconstrained potential, 1,230 Mt in 2030 and 1,580 Mt in 2050, from IATA in September 2025. The CO2 row carries around 1,000 Mt of cost-effective biogenic CO2 and the 344 Mt of CO2 needed by 2040, from the same assessment and the European Biogas Association in September 2025. The price row carries 0 to 17 USD a megajoule and the 320 to 770 USD a tonne bio-methanol band from the 2021 outlook. The Asia row carries 4.1 million tonnes of demand in 2024 and the 45 percent biodiesel share from Argus on 16 May 2025. Alongside each row I name the competing user, the bio-methanol plant, the biogas market or the aviation sector, so a cut in volume can be traced to the buyer who took it. I update a row only when a later publication replaces the figure, never when a counterparty restates a claim. Every row carries its date, and any row I cannot date does not go in the file.

What this means for you: when a lender asks where a number came from, four rows and four dates answer it on one page, and the supply model stops being a matter of faith.

Sources

Frequently asked questions

It is a written check of five things: tonnage left after competing uses, CO2 availability if only biogenic volumes count, the feedstock price band, which competitor claims the residue first, and whether the price is indexed, using the availability and cost bands published in September 2025 and 2021. I run it before the supply contracts are drafted, so a cut in volume or a rise in feedstock cost is read as a credit question rather than an operational surprise.

None is safe alone: the September 2025 assessment records Europe’s forestry residues facing bio-methanol demand, ASEAN palm oil mill effluent facing the biogas market, and around 1,000 Mt of biogenic CO2 to be shared with bioenergy with carbon capture and removals. The same assessment puts accessible biomass at about 12 percent of the unconstrained potential, so every new claim on a residue reduces what a plant can contract.

The 2021 outlook puts biomass and municipal solid waste feedstock between 0 and 17 USD a megajoule, with bio-methanol at 320 to 770 USD a tonne on feedstock up to 6 USD a gigajoule, falling to 220 to 560 USD a tonne with process improvements. In the same 2021 figures, e-methanol runs 800 to 1,600 USD a tonne with CO2 from bio-energy carbon capture at 10 to 50 USD a tonne and 1,200 to 2,400 USD a tonne with direct air capture CO2 at 300 to 600 USD a tonne, while fossil methanol costs 100 to 250 USD a tonne.

A supply contract that names the tonnage after competing uses, the re-supply route when the residue goes elsewhere, the indexation formula and the party that carries the shortfall, drafted with infrastructure agreements, permits and insurance inside the project company as the 2024 pre-feasibility study does. That study holds the weighted average cost of capital at 11 percent in its base case and recommends partner equity of about 30 percent up front, which is the structure the supply clause sits in.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you want the stress test run against your own supply assumptions before the file goes to credit, this is the work I do: every input dated, sourced and challenged against the competing buyer. The feasibility and financial model service sets out how I would build and test the model.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles