Methanol Market Players: Producers, Prices and Licensed Bunker Suppliers

10 min read  ·  Nov 2, 2026  ·  By Alex

methanol market players

The market splits into three layers that do not answer the same question. Total methanol supply in 2024 was 94 million tonnes, of which only 400,000 to 500,000 tonnes of renewable product was sold. A contract price sheet, the price list a producer posts for a set window, shows 700 USD a tonne in Asia-Pacific and 625 USD a tonne in China, posted on 29 October 2026, and 875 EUR a tonne in Europe for 1 October to 31 December 2026. Also, a bunkering licence, a port’s permission to supply methanol to ships, went three times in Singapore out of 13 candidates, from 1 January 2026 to 31 December 2030. Those are the methanol market players I contact first, starting from the green methanol industry page.

Everything I quote below is dated and checkable. I keep announced capacity, posted price and licensed delivery in three separate columns, because a directory entry that mixes them sends the wrong email first, and the order of contact matters as much as the names.

In short

  • Supply: 94 million tonnes of methanol in 2024, with 400,000 to 500,000 tonnes of renewable product sold.
  • Pipeline: more than 200 projects announced in February 2025 for 45.8 million tonnes by 2030, of which 20 to 40 percent may move.
  • Price: 700 USD a tonne in Asia-Pacific and 625 USD a tonne in China, posted on 29 October 2026.
  • Demand: 350 methanol-capable newbuildings and nearly 700 methanol-ready ships ordered at the start of 2025.
  • Delivery: three methanol bunkering licences in Singapore, 1 January 2026 to 31 December 2030.
Facebook
Twitter
LinkedIn

In this article

What the methanol market is actually made of

Who do I approach, in which order, and on which price reference? Three groups that do not answer the same question. Producers: total methanol supply in 2024 was 94 million tonnes, of which only 400,000 to 500,000 tonnes of renewable product was sold. Price reference: a posted contract price sheet gives 700 USD a tonne in Asia-Pacific and 625 USD a tonne in China, posted on 29 October 2026. Licensed delivery: Singapore awarded three methanol bunkering licences out of 13 candidates, valid from 1 January 2026 to 31 December 2030.

I keep those layers apart because they answer different questions. A producer tells me which molecule I can buy and from which chain of production routes. The paths from feedstock to finished methanol. A price sheet tells me which reference belongs in a term sheet. Also, a licensee tells me who physically delivers on a date. A single directory entry that lists one company under all three headings mixes an announced capacity, a posted price and a licence. In addition, none of the three is a transaction.

What this means for you: write three lines before you write any name. In addition, let each line hold only its own layer.

Who produces the 94 million tonnes

IRENA recorded in 2021 that around 98 million tonnes of methanol are produced per annum, nearly all from fossil fuels, with life-cycle emissions of about 0.3 gigatonnes of CO2 a year, roughly 10 percent of chemical sector emissions. Production had nearly doubled over the decade to 2021, a large share of the growth in China. At a cost of 100 to 250 USD a tonne for fossil methanol. In that same 2021 record, less than 0.2 million tonnes of renewable methanol is produced a year, that term covering bio-methanol and e-methanol.

Also, in Asia, supply was about 4.1 million tonnes in 2024 and is seen at 4.8 million tonnes in 2028, while Southeast Asian capacity rose to 10.8 million tonnes from 7.5 million tonnes after the Sarawak launch, with biodiesel driving 45 percent of Southeast Asian methanol demand in 2024. MIDA recorded on 23 July 2024 the launch of the Sarawak Petchem complex at Tanjung Kidurong, Bintulu, with annual capacity of 1,750,000 tonnes, a 7 billion RM project that makes Sarawak Petchem the second largest methanol producer in Malaysia after PETRONAS Chemical, and Malaysia the first methanol producer in the Asia-Pacific region.

What this means for you: that capacity is conventional methanol. Therefore, I start mapping from the Southeast Asia green methanol page.

How much of that market is actually green

The 2025 milestones report puts 2024 supply at 94 million tonnes with just 400,000 to 500,000 tonnes of renewable product sold, and tracks more than 200 announced projects in February 2025 for a potential 45.8 million tonnes by 2030. It expects only 20 to 40 percent of them to move forward. That is 7 to 14 million tonnes in the next five years, and records about 4 million tonnes of low-carbon, blue, bio-methanol and e-methanol capacity operational or under construction in February 2025. China holds half of the global project pipeline, and the institute states more than 100 members and consultative status with the International Maritime Organization.

None of those announced tonnes is an offer. The 45.8 million tonnes announced in February 2025 is a list of intentions and the 7 to 14 million tonnes is an expectation, while what actually sold in 2024 stayed at 400,000 to 500,000 tonnes. The low carbon fuels investment page shows who funds the gap between an announcement and a project that reaches construction.

What this means for you: ask which row of that pipeline a counterparty sits in, and date the answer.

Who actually buys the fuel

Argus recorded on 16 May 2025 that Asian methanol demand was about 4.1 million tonnes in 2024 and is expected at 4.8 million tonnes in 2028, that biodiesel led the growth and represented 45 percent of regional demand in 2024, that shipowners are the driver of announced capacity, and that 11 projects in China representing more than 3 million tonnes a year of capacity have been paused. Shipowners set the pace on both sides, so a buyer who opens with capacity while the counterparty is thinking offtake starts in the wrong place.

The same record shows the buyer side in vessels. More than 1,000 vessels classed for methanol entering service over five years, drawn from an orderbook. The list of ships ordered but not yet delivered, of 350 methanol-capable newbuildings and nearly 700 methanol-ready ships at the start of 2025. Those are orders, not deliveries. The marine fuel offtake page covers how that demand is contracted.

What this means for you. I read paused capacity and ordered ships as two different signals, and I date both before I act.

Which price you can point at

Methanex posts regional contract prices: Europe 875 EUR a tonne valid 1 October to 31 December 2026, posted on 30 September 2026. North America a non-discounted reference of 4.36 USD a gallon, that is 1,450 USD a tonne, valid 1 to 30 November 2026, posted on 28 October 2026; Asia-Pacific 700 USD a tonne and China 625 USD a tonne for the same window, posted on 29 October 2026. The sheets are updated at the end of every month. Posting can be delayed, and the gallon figure converts at 332.6 gallons a tonne.

A posted sheet is a reference, not a transaction price. Because the European window runs a quarter. In addition, the Asian window a month, two counterparties can each quote numbers that are not comparable, so I record the posting date beside the figure and use the sheet as an index line in a term sheet. Nothing more. The methanol bunkering page is the layer where a price becomes a delivery.

What this means for you. Quote the posted number with its posting date, and never write it down as what anyone paid.

Who can put fuel in your tank

Singapore’s Maritime and Port Authority announced on 24 November 2025 that it would award methanol bunkering licences from 1 January 2026. Following a call for applications launched in March 2025. Licences went to Global Energy Trading Pte Ltd, Golden Island Pte Ltd and PetroChina International (Singapore) Pte Ltd out of 13 candidates, assessed on supply chain reliability, operability, safety systems. In addition, the sustainability of the methanol supplied. They run five years, from 1 January 2026 to 31 December 2030, subject to conditions. In addition, the framework will keep evolving with operational experience, technology and international standards.

A licence is not a volume. It tells me which supplier the port has already examined on those four criteria and for which window. That is more than a directory name. However, still short of a nominated parcel, and for a concept-stage buyer that prior look is the useful part. The sustainable maritime fuels page is the frame those licences sit in.

What this means for you: I ask which licence covers the date I need, then what that licensee has actually moved.

The five questions I ask before I choose a market contact

These five questions come before any name enters my file, and each one has a dated number behind it.<\/p>

  • Which chain of production routes, and how much of it is renewable?<\/strong> Total supply was 94 million tonnes in 2024 with 400,000 to 500,000 tonnes of renewable product sold.<\/li>
  • Also, Which published price sheet does the counterparty reference?<\/strong> 700 USD a tonne in Asia-Pacific, posted on 29 October 2026.<\/li>
  • Which port and which licence does the delivery run through?<\/strong> Three licences in Singapore, valid from 1 January 2026 to 31 December 2030.<\/li>
  • Which document travels with the lot?<\/strong> Does it trace to a project inside the 45.8 million tonnes announced in February 2025, or to capacity actually operational or under construction then, about 4 million tonnes?<\/li>
  • What volume is committed rather than announced?<\/strong> More than 1,000 vessels classed for methanol over five years, from an orderbook of 350 methanol-capable newbuildings at the start of 2025.<\/li><\/ul>

    What this means for you: any question I cannot answer with a dated number stays open. In addition, I do not shorten the list to fill a slot.<\/p>

How I would write the market note for my own file

Four rows, four dates, no free text:

  • Supply: 94 million tonnes of total supply in 2024, of which 400,000 to 500,000 tonnes of renewable product was sold.
  • Capacity: 45.8 million tonnes of projects announced in February 2025, against 7 to 14 million tonnes expected to move in the five years that follow.
  • Price: 700 USD a tonne in Asia-Pacific, posted on 29 October 2026.
  • Licence: three Singapore bunkering licences, 1 January 2026 to 31 December 2030.

Every row carries its date, and any row I cannot date does not go in the file. The note stays on one page, it separates what was sold from what was announced. In addition, it carries the source line beside each figure so that I can open the same page again in a year. In addition, see whether the row moved.

What this means for you: build that note before your first call. That is because it is the only version of the market both sides can check.

Sources

Frequently asked questions

Three groups, and they answer different questions. First, producers of the roughly 98 million tonnes of methanol made each year as recorded in 2021, largely from natural gas and coal, with a large share of the growth in China. Second, traders and offtakers who contract around regional contract price sheets. Third, licensed bunker suppliers, in Singapore three licensees chosen from 13 candidates and valid from 1 January 2026 to 31 December 2030.

Small. In 2024 total supply was 94 million tonnes and only 400,000 to 500,000 tonnes of renewable product was sold, that is bio-methanol and e-methanol rather than the fossil molecule. In February 2025 more than 200 projects were announced for a potential 45.8 million tonnes by 2030, of which only 20 to 40 percent may move forward, which would be 7 to 14 million tonnes in the next five years.

The posted regional contract price sheet, because it is dated, published and checkable: 700 USD a tonne in Asia-Pacific and 625 USD a tonne in China for 1 to 30 November 2026, posted on 29 October 2026, and 875 EUR a tonne in Europe for 1 October to 31 December 2026, posted on 30 September 2026. A posted sheet is a reference, not a price anyone paid.

Because they are the only layer assessed on supply chain reliability, operability, safety systems and the sustainability of the methanol supplied, and they control the physical delivery window from 1 January 2026 to 31 December 2030. The call for applications was launched in March 2025 and three licensees were selected out of 13 candidates, which tells me who the port has already examined before any parcel moves.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are at concept stage and need a sequence rather than a list, I work with you on the strategic partnership side: I map producers, price references and licensed suppliers against your delivery window, keeping announced capacity, posted price and licensed delivery in separate lines. The first pass comes from published sources only, so the first conversation starts on dated ground.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.

More about me·Get in touch