Non-Food Oil Crops for SAF: What Jatropha's Boom Actually Proved

10 min read  ·  Nov 2, 2026  ·  By Alex

non food oil crops saf

Non-food oil crops only hold up in a sustainable aviation fuel file when three things are shown at once: a yield proven on real plots. A domestication completed before planting. In addition, a sustainability record a certifier will accept. Jatropha shows what happens without them. Plantations covered 900,000 hectares in 2008 against projections of 4.7 million hectares by 2010 and 12.8 million by 2015, and only 1.19 million hectares were growing by 2011 as expected yields failed to appear. I open with the regional picture in sustainable aviation fuel feedstock availability in Southeast Asia, because non food oil crops saf claims have to answer to that record. In addition, the record is still thin and mostly small scale.

This is a feasibility read for a feedstock supplier asking whether jatropha. Camelina, carinata or pongamia can be counted as real supply for a SAF project. I work only from what RSB, Mongabay, IATA, EUCASS, IRENA and Stillwater Publications put on the record. In addition, I keep every claim tied to its source.

In short

  • Three tests: a yield proven on real plots, a domestication completed before planting, and a sustainability record a certifier accepts.
  • Jatropha record: 900,000 hectares in 2008 against 12.8 million projected for 2015, with 1.19 million hectares growing by 2011.
  • Regional evidence: RSB finds jatropha and pongamia mostly deployed on a small scale, with very little information on large-scale plantations.
  • Fuel route: the Annex A2 pathway under ASTM D7566, approved in July 2011, lists jatropha, algae, camelina and yellow grease.
  • Cost frame: the dominant lipid route costs 2 to 2.5 times conventional aviation fuel, and microalgae SAF via that route is USD 11.50 per litre in Malaysia.
Facebook
Twitter
LinkedIn

In this article

The short answer: three tests before any planting

A non-food oil crop earns a place in my file only with a yield proven on real plots, a domestication completed before the plantation. In addition, a sustainability record a certifier will accept. Domestication here means the work of selecting and stabilising a wild plant until its oil content and its yield repeat season after season on ground I control. Jatropha is the reference case for what happens when that work is skipped.

By 2008 plantations covered some 900,000 hectares in Latin America, Africa. In addition, Asia according to a market study prepared for WWF, while projections estimated 4.7 million hectares by 2010 and 12.8 million hectares by 2015, and only 1.19 million hectares were growing by 2011. The RSB puts the regional picture plainly: jatropha and pongamia have been mostly deployed on a small scale, with very little information available on their performance in large-scale plantations.

What this means for you. I would not take a hectare number seriously until the crop repeats its yield on plots I can inspect, across seasons, under my own site’s soil and water conditions.

What these crops are, and why anyone wanted them

The RSB describes jatropha as a drought-tolerant perennial shrub from Central America that thrives on marginal land, that is, land of low present productivity. With moderate rainfall, grows rapidly and produces seeds containing 30 to 40% oil within two years. The same source records that the seed contains the toxic substance curcasin and is unfit for human or animal consumption. That is what removes the food competition argument. The RSB also records pongamia as a leguminous tree whose seeds can yield up to 40% crude oil by weight, which fixes nitrogen. In addition, restores degraded land, with Indonesia holding 14 million hectares of degraded and marginal land. The sustainability claim is the product here. Therefore, it belongs beside the criteria I have to meet in SAF sustainability criteria.

What this means for you: the oil percentage. In addition, the food competition story are the easy half. In addition, I would treat them as a claim until the criteria say this crop and this plot qualify.

What the boom left behind

Researchers describe a hype-and-fizzle cycle: a boom in investment but not of research, action taken on alleged advantages. In addition, yields underestimated, because jatropha was practically undomesticated when it was promoted. A 2009 report warned that jatropha’s high land demand would put it into direct conflict with food crops, and a 2011 global review found that cultivation outpaced both scientific understanding of the crop and knowledge of how it fits into rural economies. Land called marginal proved elusive.

Also, Land written off as unused was often already used by communities for agroforestry, hunting and gathering. Carbon accounting closed some cases, since carbon payback. The time a system takes to repay the carbon debt it created, was put by a study from Mexico at between two and 14 years for jatropha plantations associated with forest loss. In addition, in some scenarios the debt may never be recovered. The compliance angle sits in EU compliance and carbon intensity.

What this means for you. I would treat an unquantified carbon payback as an open eligibility question on my project, not as a reputational footnote to argue about later.

What the rules and the certifier do with them

The ASTM picture matters because it decides what a crop oil can actually become. Also, the IATA technical certification sheet lists hydroprocessed esters and fatty acids SPK, or HEFA-SPK. Under Annex A2 of ASTM D7566, approved in July 2011. With oil-based feedstocks including jatropha, algae, camelina and yellow grease, and a 50% blend limit. So the crop is named inside a fuel standard long before it behaves like a supply. The crop then has to clear the carbon test as well as the fuel test. That is where the carbon payback figure returns as an eligibility question rather than a moral one. Either way, SAF must be blended with Jet A before use, normally at existing fuel terminals. I read the whole eligibility chain through CORSIA.

What this means for you: inclusion in an ASTM annex answers whether the oil can be made into qualified jet fuel. In addition, it answers nothing about whether my hectares will arrive on schedule.

What the volume looks like today

IATA records that in 2050, of an estimated 189 million tonnes of oil-based feedstock available for bioenergy. In addition, biofuels, 82 million tonnes could be used for SAF. With a theoretical maximum of oil-based HEFA SAF of 63 million tonnes, and oil-based HEFA projected at just over 15% of SAF in 2050. EUCASS records that first-generation lipid feedstocks dominate current production at more than 90%, that waste cooking oil and tallow should supply 40% of all SAF feedstock by 2030, and that algae carries a theoretical yield of 30,000 litres per hectare a year at cultivation. In addition, harvesting costs 5 to 10 times above terrestrial biomass pathways.

Also, in Southeast Asia the RSB records about 1,000 hectares a year of jatropha in Cambodia and notes that a Petronas and Idemitsu agreement is exploring non-edible oil feedstock trees such as pongamia and jatropha for SAF. I hold that arithmetic against feasibility and financial model numbers.

What this means for you: the volume that exists today is waste lipids. In addition, a planted oil crop would enter as a small addition to a pool that is already spoken for.

Three ways the crop bet fails

First, the yield does not repeat. Pongamia research concluded that it still cannot be considered a significant and stable source of biofuel feedstock due to persisting knowledge gaps. In addition, jatropha yields stayed poor despite tolerating drought and degraded land. Second, the land claim collapses on inspection, with land grabs, conversion of food crop lands and clearing of natural areas recorded during the boom, and vague definitions of marginal land costing local communities their access to ecosystem services. Third, the economics of the alternative: HEFA costs are currently 2 to 2.5 times that of conventional aviation fuel with feedstock carrying the lion’s share of production cost. In addition, IRENA puts microalgae-derived SAF via HEFA at USD 11.50 per litre in Malaysia, nearly 20 times the current Jet A-1 price of USD 0.6 per litre.

What this means for you. I would separate these three failure modes in my file, because a yield problem, a land problem and a price problem each kill the project at a different stage. In addition, none of them is fixed by a larger planting target.

The order I would run the work in

I would test the claim before I model the plantation: prove the yield on my own plots across several seasons, establish who owns the land. In addition, what it was already used for, confirm the certification route. In addition, the carbon payback position, confirm an offtaker will accept the fuel, and only then price the hectare. Two anchors hold that sequence. The RSB recommends expanding research into low ILUC risk crops such as pongamia, jatropha and miscanthus suitable for degraded or unused land, and that is an invitation to gather data rather than a statement of availability. Stillwater Publications makes the structural point that lipids are by-products.

Meaning outputs produced alongside a main product rather than for their own sake, which a planted oil crop is not. Nothing in either anchor says the hectare exists for me today. I would build the supply plan in feedstock supply terms from those two anchors.

What this means for you: sequence beats enthusiasm here, and every month of plot data I collect first is a month of capital I do not have to defend against a projection later.

How I would run this if it were my file

I would put my own evidence against the published record before it reaches committee: the 900,000 hectares of 2008 and the 1.19 million hectares of 2011 against projections of 12.8 million by 2015; the 30 to 40% oil in jatropha seed within two years against the regional small-scale record; the Annex A2 listing of jatropha, algae and camelina from July 2011; the carbon payback range of two and 14 years from the Mexican study; and the USD 11.50 per litre algae figure that frames what a novel oil costs today.

The published base is itself thin. The RSB could use only 17 articles out of 85 for its quantitative analysis, and found no data at all for animal fats, while still projecting that regional feedstock could translate into about 45.7 million tonnes of SAF annually by 2050. Any gap between those lines and my own plot data is where the project either earns a place or stops.

What this means for you: bring the five dated lines and my plot record to the same table. In addition, let the difference between them set the size of the planting rather than the other way round.

Sources

Frequently asked questions

Not at scale. The RSB records jatropha and pongamia as mostly deployed on a small scale with very little published information on large-scale plantation performance, ASTM lists them under the HEFA-SPK annex approved in July 2011, and oil-based HEFA is projected at just over 15% of SAF in 2050, so the crop qualifies as a fuel route before it qualifies as a volume.

Investment ran ahead of research. Plantations covered 900,000 hectares by 2008 against projections of 12.8 million hectares by 2015, only 1.19 million hectares were growing by 2011, yields stayed poor, the crop was practically undomesticated when it was promoted, and land grabs and clearing followed.

Camelina shares the qualification but sits in a different evidence position. The RSB lists it among the alternative oilseed crops under consideration with carinata, tall oil and algae oils, IATA lists camelina alongside jatropha and algae in the HEFA-SPK annex approved in July 2011, and the RSB regional tables do not quantify it, listing only jatropha, pongamia and miscanthus as potential crops for further research.

Three checks in order: multi-season yield on the actual plots, land ownership and previous use together with a carbon payback position, and a buyer plus certification route that accepts the fuel.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are weighing non food oil crops saf options against residues. In addition, waste lipids, I can put the published record next to your site data and open the conversation with the counterparties who fund and offtake this kind of supply through investor introductions.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia