We Connect Asia

SAF

Double Claiming in Book and Claim: How to Keep One Reduction Counted Once

10 min read  ·  Nov 2, 2026  ·  By Alex

saf certificate double claiming

When I buy certificates for SAF through book and claim, my first question is how I stop double counting. That question comes before price. The answer is that I am looking at three separate failures rather than one. The ICAO criteria define double issuance as more than one unit issued for the same emission reduction. They define double use as the same issued unit used twice, for instance duplicated in registries. In addition, they define double claiming as the same reduction counted twice by both buyer and seller. An airline and a host country can be that pair. The controls are a secure registry with serial numbers and identified holders. Next comes retirement of the Scope 1 claim before the Scope 3 retirement. The quantity never exceeds my own activity. That is the SAF certificate double claiming problem as I meet it.

The buyer’s side of the desk

I write this from the buyer’s side of the desk, where the exposure is a claim I cannot defend at audit. Three sets of rules meet in that file: the ICAO emissions unit criteria, the book and claim integrity principles, and the Science Based Targets initiative conditions.

In short

  • Three failures: Double issuance, double use and double claiming are separate events, and I control them separately.
  • Origin: The words come from the ICAO emissions unit criteria, which govern carbon offset credits, not certificate rules.
  • Order: The Scope 1 claim is retired before the Scope 3 retirement.
  • Registry: Serial numbers, identified holders and a secure registry keep one unit counted once.
  • Compliance: SBTi conditions apply from 1 February 2027, and no registry has its recognition yet.
Facebook
Twitter
LinkedIn

In this article

The short answer: three failures, not one

The vocabulary I use here comes from the ICAO emissions unit eligibility criteria, which govern carbon offset credits, not from the rules that SAF certificates follow. The criteria split the problem into three words. Double issuance is more than one unit issued for the same emissions or emissions reduction. One issued unit serving twice is double use, for instance when two registries hold the same unit. Double claiming happens when both the buyer and the seller count the same emissions reduction. An airline and a host country often form that pair. The criteria also require individually identified units with serial numbers. They must sit in a secure registry with identified owners or holders. Each unit counts only once towards a mitigation obligation (ICAO). Double counting is the umbrella phrase that covers all three.

What this means for you: I put the three definitions on the first page of my file, because a clause that only says no double counting has not chosen which failure it prevents.

Why an offset vocabulary sits in a certificate article

The ICAO criteria address carbon offset credits. Also, I keep that origin visible rather than treat them as certificate rules. The bridge is CORSIA, where an aircraft operator reduces its offsetting requirements through CORSIA eligible fuels, which include CORSIA sustainable aviation fuels and CORSIA lower carbon aviation fuels. The same rule book sits behind both sides of the transaction. Eligible programmes must require and demonstrate that host countries account for the units issued from those activities, which I call corresponding accounting by a host country, so that double claiming does not occur between the airline and the host country (ICAO). A clear and transparent chain of custody is another integrity criterion. Units must count only once towards a mitigation obligation.

What this means for you: before price, I ask which programme issued the units. I also ask whether the host country can claim the same reduction. I walk away if that answer is missing.

What actually prevents it inside book and claim

Inside book and claim the physical fuel and the claim move separately, so the controls sit on the paperwork. The certificate follows the model of energy attribute certificates. It covers a quantity such as one metric ton made from sustainable feedstock. And the sustainability criteria decide what qualifies (DHL). I own the environmental benefits without physically possessing the fuel, receive an independently verified certificate, and work through four steps: book, supply, delivery and claim. For logistics book and claim, DHL names three integrity principles: matching the transport type, preventing double counting, and independent third-party verification. A serial number is the unique identifier on an individual unit, tracked through issue, transfer and retirement, and retirement is the act of cancelling it in a registry so that nobody can claim it again (ICAO).

What this means for you: I put three clauses in writing. They are the serial number, the registry where retirement will happen, and independent third-party verification of the claim. I ask for the registry log afterwards.

Who retires what, and in which order

A SAF registry is a database that records the issuance, transfer and retirement of certificates. Therefore, a book and claim system stays consistent and transparent and avoids double claiming and double counting (World Economic Forum). The published examples I can name are three registries. They are the Roundtable on Sustainable Biomaterials registry, the SAF certificate Registry and the ISCC credit transfer system. The registry standard in the same source requires one retirement order. The Scope 1 claim must retire before the Scope 3 retirement. That keeps the accounting of reduction claims accurate. The same source separates a carbon inset from a carbon offset. A carbon inset funds a project inside the aviation value chain. A carbon offset funds projects outside it. So SAF procurement counts as an inset rather than an offset.

What this means for you: I name the registry and the retirement order in the contract. Then I check that my certificate appears in the registry log after retirement.

The compliance overlay that makes it visible

The Science Based Targets initiative published its Corporate Net-Zero Standard Version 2.0 on 11 June 2026. Also, it takes effect on 1 February 2027. It recognises certificates traded through mass balance or book and claim, but only under conditions. Direct action comes first, so I must show that activity-level solutions remain limited before I rely on certificates. I report certificates separately from my inventory. Also, the integrity criteria require that they match the fuel in my inventory. They come from a relevant fuel system and I quantify them conservatively. Activity must fall within 12 months unless a longer period applies. The volume never exceeds my activity, and each unit retires in a secure registry (Sylvera). I also confirm before purchase that no compliance mandate has used the fuel. That matters because mandates oblige suppliers rather than buyers. That is where the same volume counts twice.

What this means for you: I make that confirmation a closing condition rather than a post-signing promise. The reporting date of 1 February 2027 does not move.

Three ways it still happens

Three ways still put one reduction into two accounts. First, the same tonne serves two obligations. A certificate can carry the airline’s Scope 1 claim, the end user’s Scope 3 claim, or both. Many programmes sell only the Scope 3 part (Sylvera). Second, the accounting bases differ: CORSIA uses 89 grams of CO2 equivalent per megajoule while RED II uses 94. RED II is the one ReFuelEU Aviation relies on. Carbon intensities also vary with the certification scheme methodology, which creates an accounting mismatch across certificates (Sylvera). At the same carbon intensity the reduction looks larger against the EU baseline. Third, the paperwork lags the trade. Some suppliers had not yet registered certificates on a registry. That extends the retirement cycle by up to a month (Sylvera).

What this means for you: at offer stage I ask three questions. Which claim attaches, which baseline applies, and when the certificate enters a registry.

The order I would run the work in

First I write the claim in the contract, naming Scope 1, Scope 3 or both, before price talk (Sylvera). Second I require serial numbers and retirement in my company’s own name, with a documented record (RMI; Sylvera). Third I check the order of retirement, Scope 1 before Scope 3. That is what the registry standard requires (World Economic Forum). Fourth I confirm that the producer holds a Sustainability Certification Scheme approved by the ICAO Council under CORSIA. I also confirm that no mandate already counts the batch (ICAO; Sylvera). Only then I book the volume. I treat policy risk as the factor that decides whether today’s price holds at my next reporting date. Also, each step I complete early removes an argument I would otherwise have at audit.

What this means for you: I keep price out of the conversation until I write down all four checks. Therefore, each check gets harder to renegotiate once I book the volume.

How I would run this if it were my file

One page before committee, and nothing longer. The rest of the file is evidence, not argument. That page carries the three ICAO definitions. The page also carries the rule that one unit counts only once (ICAO). It also lists the four book and claim steps. Matching, preventing double counting and third-party verification are the principles (ICAO; DHL). The retirement order is Scope 1 before Scope 3, with three published registries (World Economic Forum). The SBTi conditions and the 1 February 2027 date also appear, with no registry recognised yet (Sylvera). Finally, the page lists the December 2023 launch of the SAF certificate Registry (RMI). RMI and the Environmental Defense Fund launched it with Sustainable Aviation Buyers Alliance and Energy Web. Anyone who reads that page once should answer four questions. Who issued the unit, who holds it, who retired it first, and which volume of mine it sits against.

What this means for you: I draft that page before any outside party sees the file. The sequence of controls makes the claim defensible.

Sources

Frequently asked questions

Double claiming is the same emissions reduction counted by both the buyer and the seller, for instance by an airline and by the host country. Double issuance is more than one unit issued for the same reduction, and double use is one issued unit used twice, for instance if a unit is duplicated in registries. Double counting is the wider phrase that covers all three (ICAO), which is why it is too vague to use as a contract clause.

Not if the controls are in place. Units must be individually identified through serial numbers in a secure registry with clearly identified owners or holders, counted only once towards a mitigation obligation, and retired in my company’s own name with a documented record (ICAO; Sylvera). Some suppliers take up to a month to register the certificate, and that lag is where I watch.

In the order the registry standard sets: the Scope 1 claim is retired prior to the Scope 3 retirement, so that the accounting of reduction claims stays accurate (World Economic Forum). In practice the party holding the Scope 1 claim retires first, and I retire the Scope 3 claim after that.

The claim I am buying, the serial number and retirement in my own name, the requirement that the volume never exceeds my activity and stays within 12 months, the confirmation that the fuel was not already used to meet a compliance mandate, and independent third-party verification of the claim (Sylvera; DHL).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you want a second set of eyes on a certificate contract before you sign it, I review the claim language, the registry, the retirement order and the baseline behind the reduction. See how I work on EU compliance and carbon intensity.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles