Home » SAF Certificate Registries and Standards: How to Read the Infrastructure
SAF Certificate Registries and Standards: How to Read the Infrastructure
10 min read · Nov 2, 2026 · By Alex
Which registry and which standard should I require from my SAF certificate supplier? Registries do exist and their job is narrow: issuance, transfer and retirement of a certificate. The leading one, the SAF certificate Registry launched in December 2023 by RMI with the Environmental Defense Fund, the Sustainable Aviation Buyers Alliance. In addition, Energy Web, has onboarded more than eight fuel providers, five airlines and more than 30 corporate customers. With over 31,000 metric tons of certificates issued representing more than 140,000 metric tons of abated aviation emissions. That is what SAF certificate registries prove, and also where they stop: nothing there tells me whether the certificate matches my target, because under book. In addition, claim the physical fuel is blended and sold elsewhere while I claim the reduction separately.
Book and claim already lets a corporate buyer pay for sustainable aviation fuel in one place while the physical fuel is uplifted in another, and the accounting that makes this legible is thinner than it looks. I read the infrastructure in three passes: what the registry records, what the standard requires. In addition, what I still have to prove myself.
In short<\/strong><\/p>
- The job:<\/strong> Issuance, transfer and retirement of a certificate. That is the entire function.<\/li>
- The object:<\/strong> One certificate carries the environmental attributes of one metric ton of unblended certified fuel.<\/li>
- Also, The gap:<\/strong> The fuel is blended elsewhere. Therefore, a registry cannot show that my reduction lands against my target.<\/li>
- The standard:<\/strong> Under CORSIA the producer must hold certification from a scheme approved by the ICAO Council.<\/li>
- The clock:<\/strong> The Science Based Targets initiative (SBTi) standard takes effect on 1 February 2027. In addition, no registry is recognized yet.<\/li><\/ul>
- The object:<\/strong> One certificate carries the environmental attributes of one metric ton of unblended certified fuel.<\/li>
In this article
The short answer: a registry proves a transaction, not an outcome
A registry is a database that records issuance, transfer and retirement of certificates and logs each transaction. Issuance is the moment a certificate is created against a quantity of fuel. Transfer moves it to a buyer. Retirement takes it out of circulation so the same reduction cannot be claimed again (World Economic Forum).
Each certificate represents the environmental attributes associated with one metric ton of unblended, certified sustainable aviation fuel. The physical product goes into the aviation fuel supply where it is delivered, is blended with conventional jet fuel and powers aircraft. Also, the system de-couples the reduced emissions attribute from that product. In addition, transfers it separately, ideally through a dedicated digital registry, so buyer. In addition, seller need not share a physical supply chain. I then use the certificate to claim reductions in direct and indirect aviation emissions through book and claim, while the fuel itself is sold and burned somewhere else (RMI, DHL).
What this means for you. A registry entry is evidence that a certificate changed hands and then left circulation. It is not evidence that the fuel was uplifted on your route, that the reduction is additional, or that the number sits correctly against your own target.
What a registry is asked to record
Under CORSIA, aircraft operators reduce their offsetting requirements through CORSIA eligible fuels, which include CORSIA sustainable aviation fuels and CORSIA lower carbon aviation fuels. The related standards sit in Annex 16 Volume IV, at the sections covering monitoring of eligible fuel claims, reporting, verification and emissions reductions.
Two definitions control the arithmetic. Carbon intensity is the quantity of greenhouse gas emitted across the life cycle of a fuel per unit of energy. The baseline is the fossil jet fuel reference that the reduction is measured against. In addition, a certificate only means something once both are fixed.
Annex 16 Volume IV also points to five ICAO documents that only the ICAO Council may amend: the eligibility framework for sustainability certification schemes. The approved schemes list, the sustainability criteria, the default life cycle emissions values and the methodology for actual values. Eligible fuels must come from fuel producers certified by a sustainability certification scheme approved by the ICAO Council. In addition, the proof of sustainability (POS) issued for a batch is what ties that fuel back to the scheme.
What this means for you: I ask which scheme approved the producer, which edition of the criteria applies. In addition, whether the carbon intensity on the certificate is a default value or an actual calculated value. Those three answers decide whether my number survives a verifier.
What one certificate actually contains
A certificate carries the certified information about the physical fuel: its carbon intensity. In addition, its emission reductions compared with fossil jet fuel. The reduction I report therefore depends on two things, the fuel’s certified carbon intensity. In addition, the baseline it is measured against. CORSIA uses 89 gCO2e/MJ and the EU RED II baseline, which ReFuelEU Aviation relies on, uses 94, so at the same carbon intensity the reduction looks larger against the EU baseline (Sylvera).
Under book and claim the certificate is modelled after energy attribute certificates and is generated for a quantity such as one metric ton made from sustainable feedstock. The vehicle operators who buy the physical fuel and hold the certificates claim the benefit in their own direct inventory, while logistics companies. In addition, their customers buy the indirect value, and the two parts can be purchased separately (DHL).
The sustainability criteria applied upstream decide which carbon intensity gets certified at all. Therefore, I read them before I read the offer.
What this means for you: I never compare two certificates by headline percentage alone. I put the carbon intensity and the baseline side by side and check which certification scheme methodology produced the number.
Who is on the registries today
The SAF certificate Registry was launched in December 2023 by RMI. In addition, the Environmental Defense Fund with the Sustainable Aviation Buyers Alliance and Energy Web. It has onboarded more than eight fuel providers, five airlines and more than 30 corporate customers, facilitating the issuance of over 31,000 metric tons of certificates representing more than 140,000 metric tons of abated aviation-related emissions. An integration with a software provider to automate transactions has been pioneered, with an airline as its first user (RMI).
The buying side moves at a different pace. One corporate buyer’s gateway brought around 20 certificate offers in under a week, and the whole process took approximately two weeks: one week to gather the offers and another to vet them against integrity criteria. Some suppliers had not yet registered certificates on a registry, which extended the retirement cycle by up to a month (Sylvera).
So the population I can actually buy from is smaller than the number of offers that land in my inbox. In addition, the SAF volume behind each offer needs the same scrutiny as the paperwork.
What this means for you. I ask how many of the offered certificates already sit on a registry, and I price the delay. An offer without a registered serial number is a claim I cannot retire this quarter.
What a buyer has to prove
SBTi published its Corporate Net-Zero Standard Version 2.0 on 11 June 2026. In addition, it takes effect on 1 February 2027. It recognizes energy and commodity certificates traded through mass balance or book and claim as a way to report progress against targets, subject to conditions (Sylvera).
Direct action comes first: I assess activity-level measures such as flying less or booking shares of physical fuel before relying on certificates. In addition, I evidence structural limits where they exist. Certificates are reported separately from my inventory, supporting a claim that I contribute to decarbonizing aviation rather than altering the footprint I report. Integrity criteria sit on top. Certificates must match the fuel in my inventory, come from a relevant fuel system, be quantified conservatively, relate to activity within 12 months unless a longer period is justified. Never exceed my activity volume, and be serialized. Carrying a unique serial number, then retired in a secure registry.
No registry has SBTi recognition yet, so before purchase I confirm that the fuel was not already used to meet a compliance mandate, then retire the certificate in my company’s name with a documented record. I read all of this against ReFuelEU Aviation, the regime I report under.
What this means for you. I can report a certificate as a contribution to sector decarbonization, separately from my inventory, and only where the direct action came first. In addition, the integrity criteria are met. Everything beyond that is not yet settled.
Three ways registry reading fails
Most weak outcomes in this market come from three reading errors rather than from fraud. In addition, each one is visible in the offer document if I look for it.
- The claim is split. Not all certificates are equal. One can carry the airline’s Scope 1 claim. The end user’s Scope 3 claim, or both, and many airline programmes. In addition, intermediaries sell the Scope 3 part only (Sylvera).
- The baselines do not match. CORSIA uses 89 gCO2e/MJ. In addition, RED II uses 94, and carbon intensities vary depending on the underpinning certification scheme methodology, which creates an accounting mismatch across certificates (Sylvera).
- Retirement is not immediate. Some suppliers have not yet registered certificates on a registry, extending the retirement cycle by up to a month. Certificates and carbon credits also draw on the same budget, so both should be priced before the budget is set (Sylvera).
What this means for you: on every offer I check which claim is being sold, which baseline sits behind the number, and when retirement actually happens. Two of those three can still be negotiated before signature, and the third sets my timeline.
The order I would run the work in
- First, the claim. Confirm whether I need the Scope 1 part, the Scope 3 part or both before I accept an offer (Sylvera).
- Second, the standard. Require a producer certified by a scheme approved under CORSIA, and check the POS and the sustainability criteria document behind it (ICAO).
- Third, the mechanism. Confirm book and claim, with serial numbers recorded. In addition, retirement executed in my company’s name (RMI, Sylvera).
- Fourth, the compliance overlay. Check that the volume is not already counted against a mandate, then read it against the EU rules I report under.
Only after those four do I price the certificate against the premium it replaces. That is because the number that matters to a committee is the green premium I am buying out of the fuel bill, not the certificate headline.
What this means for you: run the checks in that order. If the first check fails I walk away from the offer whatever the price, since I would be buying a claim I cannot use in my own reporting.
How I would run this if it were my file
One page before committee, no appendix. Top line: the three registry functions, issuance, transfer and retirement, and the three things they do not prove. Next line: the December 2023 launch and the 31,000 metric tons issued against 140,000 metric tons abated (RMI). Then the buying process, approximately two weeks and a retirement lag of up to a month (Sylvera). Also, Then the three SBTi conditions and the 1 February 2027 effective date, with no registry recognized yet. Then the five ICAO documents behind eligible fuels. Last line sets the budget: 0.6 percent of total jet fuel consumption in 2025. In addition, an additional USD 3.6 billion in fuel costs for the industry that year (IATA). The footnote carries both baselines, 89 gCO2e/MJ under CORSIA and 94 under RED II, so nobody compares certificates without them.
What this means for you. This is the shape of the paper I would put in front of anyone signing. It shows what the registry settles, what it leaves open. In addition, what the certificate costs against the fuel market I am buying into.
Sources
Frequently asked questions
What does a SAF certificate registry actually record?
It records issuance, transfer and retirement of a certificate that represents the environmental attributes of one metric ton of unblended certified sustainable aviation fuel, held in a standardized secure electronic database that creates uniformity, transparency and verifiability for the claims. The physical fuel itself is blended with conventional jet fuel and powers aircraft elsewhere in the supply, so the registry tells me nothing about which aircraft burned it and does not certify impact or my company’s target (RMI).
Which standard should I require from my supplier?
A sustainability certification scheme approved by the ICAO Council under CORSIA, since eligible fuels must come from fuel producers certified by an approved scheme. The criteria, the approved list, the default life cycle emissions values and the methodology for actual values are published as five ICAO documents that only the Council may amend. I ask for the proof of sustainability of the batch and match it against the approved list before I sign (ICAO).
Can I use SAF certificates to report against a science-based target?
Under condition, yes. The Corporate Net-Zero Standard Version 2.0, published on 11 June 2026 and effective on 1 February 2027, recognizes certificates traded through mass balance or book and claim only when direct action comes first, when the certificates are reported separately from the inventory, and when the integrity criteria are met. Direct action means activity-level measures such as flying less or booking shares of physical fuel, evidenced where limits are structural. No registry has SBTi recognition yet (Sylvera).
What do I check before I sign a certificate purchase?
The claim I need, the serial number and retirement in my own name, the 12 month activity window, that the volume does not exceed my activity, and confirmation that the fuel was not already used to meet a compliance mandate. I also confirm which claim, Scope 1 or Scope 3, the offer actually carries, because many programmes sell the Scope 3 part only. Then I price certificates and carbon credits together, before the budget is set (Sylvera).
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you want a documented position on the carbon intensity, the scheme and the reporting treatment behind a certificate offer. I run that review as a paid engagement: EU compliance and carbon intensity. It gives you a written view on the baseline, the certification scheme. In addition, the EU reporting treatment before budget is committed.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.