SAF Export Markets: Where Southeast Asian Producers Can Sell
10 min read · Nov 2, 2026 · By Alex
I read a destination as a published obligation rather than as a stated intention. The European Union sets a 2% share from 2025 and 70% by 2050, the United Kingdom sets 2% in 2025 and 10% in 2030, Japan targets 10% of the fuel its airlines burn by 2030, and South Korea opens at 1% for international departures in 2027. That is my answer to where a Southeast Asian plant can sell: where a rule forces fuel into the tanks. I read saf export markets as a schedule of binding dates. Also, I size offtake volume against those dates, starting from the offtake questions I put to a buyer.
A minimum share is the smallest percentage of jet fuel that a rule requires to be sustainable aviation fuel, blended into the fuel aircraft uplift. That definition is where saf export markets begins for me: dates, bearers and eligibility rules, in that order.
In short
- Europe: 2% from 2025 rising to 70% by 2050, with fuel suppliers carrying the duty.
- United Kingdom: 2% in 2025, 10% in 2030 and 22% in 2040, plus tradeable certificates with a cash value.
- Japan: 10% of Japanese airline fuel by 2030, run through a public-private council.
- South Korea: 1% in 2027 rising to 7 to 10% by 2035, with the later ratios still to be confirmed.
- Proof: a certified chain of custody, a separate accounting for emissions, and only 1.9 Mt of supply in 2025.
In this article
The short answer: obligations, not intentions
I treat each destination as a text I can cite rather than an ambition to weigh. The European Union sets a minimum share of 2% of SAF from 1 January 2025. It then reaches 70% by 2050 (European Commission). The United Kingdom starts at 2% of total UK jet fuel demand in 2025. It then reaches 10% in 2030 (Department for Transport). Japan aims to replace 10% of the fuel consumed by Japanese airlines with SAF by 2030 (ICAO). South Korea requires a 1% SAF blend on international departures from 2027 (Argus Media). None of those figures forecasts a price; each states a quantity that a named party must deliver under a rule. My unit of comparison is the obligation, its bearer and its first binding year.
What this means for you: I do not ask a refiner what it plans to buy, I read the rule that tells it what it must buy, and I start every destination file with those three lines.
Europe, the deepest published schedule
Europe publishes the ladder of percentages I can date furthest ahead. The schedule runs 2% from 2025, 6% from 2030 with an average synthetic share of 1.2% between 2030 and 2031, 20% from 2035, 34% from 2040, 42% from 2045 and 70% from 2050, each step carrying its own synthetic sub-share (European Commission). Fuel suppliers carry the supply duty, airports must facilitate access to the fuel, and aircraft operators must uplift at least 90% of their yearly fuel requirement at a Union airport, which closes the tankering route around the obligation (European Commission). I record the demand context from IATA. For example, airlines paid a premium for the 1.9 Mt of SAF available in 2025 (IATA). I map the route itself in my guide to exporting SAF to Europe, because a European route follows a regulation with a fixed timetable rather than a voluntary programme.
What this means for you: you can date a European file years ahead. As a result, I quote volume against the year written in the regulation, never against a buyer’s current appetite.
The United Kingdom: obligation plus certificates
The UK SAF Mandate starts at 2% in 2025 and increases linearly to 10% in 2030. In addition, it rises to 22% in 2040 and holds there until supply certainty improves (Department for Transport). A company must register under the mandate if it owns and supplies 15.9 terajoules or more of relevant aviation turbine fuel in an obligation year. The mandate secures demand and incentivises supply through tradeable certificates with a cash value. Therefore, every claim needs independent verification against the voluntary schemes and third party verifiers that the department publishes. The department is also developing a SAF revenue certainty mechanism with a levy design, a delivery plan. Also, a contract allocation strategy, so UK pricing carries a published support channel next to the obligation.
IATA records that the UK mandate has triggered price spikes that airlines absorb (IATA). I read that pairing as a low carbon fuel mandate with a price channel attached.
What this means for you: I separate certificate value from fuel price in every UK model, because the certificate is verified along its own claims path.
Japan: a target held through a public-private council
Japan’s quantified target is to replace 10% of the fuel consumed by Japanese airlines with SAF by 2030. Meanwhile, a public-private council holds it, bringing together airlines, airport companies, oil companies and the ministries involved (ICAO). The mechanism rests on supply targets for 2030 established on current legislation, with airlines setting their SAF use target in a decarbonization promotion plan, and support that includes capital investment support for large-scale SAF production facilities and a tax credit of 30 yen per liter for SAF produced and sold in Japan (ICAO). Japan also supports registration and certification of SAF as CORSIA eligible fuel, where CORSIA is the ICAO framework for reporting emissions on international flights, and it is developing an ASEAN-Japan certification guidebook by FY2026 (ICAO). I treat Japan as a destination where CORSIA alignment is part of the sale, not a formality behind it.
What this means for you: I confirm the certification route and the guidebook timeline with the Japanese authorities before I quote a delivered volume into Japan.
South Korea: a phased blending obligation
The Ministry of Land, Infrastructure and Transport and the Ministry of Trade, Industry and Energy released a SAF blending mandate roadmap in September 2025 (InfluenceMap). A blending obligation is a required SAF percentage that fuel suppliers must deliver. The roadmap starts at 1% in 2027, rises to 3 to 5% by 2030 and to 7 to 10% by 2035, with later ratios to be confirmed (Argus Media; InfluenceMap). The duty falls on fuel suppliers, penalties are deferred for a period, up to 20% of the annual obligation can be carried over for up to three years, and from 2028 departures must uplift at least 90% of SAF and jet fuel at the departure airport (InfluenceMap; Argus Media). Eligibility decides the demand: SAF counts only if it meets CORSIA requirements.
This means meane a minimum 10% reduction in net greenhouse gas emissions against conventional jet fuel, and nine domestic airlines already fly some short-haul routes on a 1% blend (Argus Media). This is the policy risk I track.
What this means for you: I check which percentage binds now and which is still to be confirmed before a Korean volume enters a base case.
What a producer proves before a shipment
I put documentation ahead of price. First is the certificate chain: entities where significant changes to properties and environmental attributes take place must be certified, including feedstock producers and providers, transporters, traders, producers, blenders and suppliers, and the documents I ask for are the proof of sustainability, the proof of compliance issued under a scheme such as ISCC or RSB, and the product transfer document (IATA). Second is the accounting: once SAF is blended it can no longer be traced physically. Therefore, emissions reductions are accounted for separately through mass balance or book and claim, and CORSIA already accepts book and claim reporting based on purchase records (IATA).
Third is supply: SAF output reached 1.9 Mt in 2025, only 0.6% of total jet fuel consumption, is projected at 2.4 Mt and 0.8% in 2026, and airlines that committed to 10% SAF by 2030 may have to re-evaluate those commitments (IATA). I place that paperwork and that supply curve inside the Southeast Asian SAF picture.
What this means for you: I will not price a cargo until the chain of custody, the accounting method and the buyer’s verification path are named in the same paragraph.
How I sequence the destinations
I begin with the obligation text and its bearer, because a target carried by airlines. Also, a duty carried by fuel suppliers call for a different contract. Japan routes the target through airline decarbonization plans inside a public-private council (ICAO). Meanwhile, europe and the United Kingdom place the duty on fuel suppliers (European Commission. Department for Transport), and MOLIT and MOTIE do the same in Korea (InfluenceMap). I then date every file, since Korea’s later ratios are still to be confirmed. Meanwhile, the European schedule is fixed in a regulation (InfluenceMap; European Commission). I keep certification eligibility ahead of price in the checklist. In fact, a fuel that does not count towards the obligation has no mandate demand behind it. I never forecast a destination volume beyond the published share and the published year. When two files tie, I pick the one with the earliest binding year.
What this means for you: a destination enters my plan only when four things sit on one page. They are the text, the bearer, the year and the eligibility rule.
The decision rule I apply
I pick a destination only when I can name the obligation, its bearer, its first binding year. Also, its eligibility rule in four lines, and I park the file when any one of the four is missing. I then route the volume through the offtake structure that fits the tenor the buyer can actually sign. This is where a long contract with a producer and a short annual renewal part company. Price comes after that: IATA reports SAF above fossil jet fuel by a factor of 2. However, the factor reaches 5 in mandated markets (IATA). I also keep payment terms inside the same four lines. A buyer that cannot sign the tenor cannot carry the obligation either. I carry only the map I can defend line by line.
What this means for you: I write the four lines before I build the model. As a result, I abandon the model the moment one of those lines stops being true.
Sources
- IATA, 9 December 2025.
- European Commission, 18 October 2023.
- Department for Transport, 13 July 2026.
- ICAO, 7 August 2024.
- Argus Media, consulted 16 November 2026.
- InfluenceMap, consulted 16 November 2026.
Frequently asked questions
Which destination has the clearest published demand?
The European Union publishes the longest schedule, with minimum shares fixed in a regulation from 2% in 2025 to 70% in 2050. The United Kingdom publishes 2% in 2025, 10% in 2030 and 22% in 2040, Japan publishes 10% of airline fuel by 2030, and South Korea opens at 1% in 2027 (European Commission; Department for Transport; ICAO; Argus Media). I read clearest as most dated and most fixed, which puts Europe at the top of my list and Korea at the end of it.
Does a Japanese buyer need CORSIA eligible SAF?
Japanese authorities work on CORSIA eligible fuel: they supported the registration of a new feedstock through the ICAO process, and they are developing an ASEAN-Japan certification guidebook by FY2026 to build knowledge of the certification process across the region (ICAO). I therefore ask a Japanese buyer for its certification path before I discuss price.
How firm are the Korean blending targets?
The first binding step is the 1% blend in 2027, while the 3 to 5% share for 2030 and the 7 to 10% share for 2035 are still to be confirmed against domestic capacity and global market conditions, and penalty enforcement is deferred for a period (InfluenceMap; Argus Media). I treat 2027 as hard and everything after it as a file I revisit whenever MOLIT and MOTIE publish.
Can an exporter rely on a single destination?
Not if the volumes are concentrated: SAF output was 1.9 Mt in 2025, which is 0.6% of total jet fuel consumption, and airlines with 10% commitments for 2030 may have to re-evaluate them, so I spread destination risk across more than one published obligation (IATA). One plant selling into one mandate carries that mandate’s enforcement risk on a single cargo stream.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you want the destination map turned into an offtake shortlist with obligations, bearers, binding years and eligibility rules in four lines each, I run that work with founders and project teams through my strategic partnerships service. It starts with the published texts, not with a buyer list.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.