SAF FID Readiness Checklist: What Lenders Ask for Before Final Investment Decision

9 min read  ·  Jul 2, 2026  ·  By Alex

saf fid readiness checklist

Before a lender commits to your sustainable aviation fuel project, it asks for a credit file, not a pitch. That file holds a completed front-end engineering design (FEED), signed feedstock contracts, a firm offtake (a contract with volume, price and delivery terms), permits, a downside model that still repays debt, and a risk register with a named owner on every line. Together these make up SAF FID readiness, the evidence required before the final investment decision (FID) is signed. I hold every file to that standard in How to reach FID on a SAF project.

About 600 SAF production announcements have been made since 2016, yet only about 35 sites are in production and 2.4 Mt of SAF is expected in 2026. That distance sits in ICAO’s de-risking window and the financing death valley. Readiness is the discipline of closing it with documents a credit committee can check.

In short

  • Credit file: completed FEED, signed feedstock contracts, firm offtake, permits, a downside model and a risk register with named owners.
  • Evidence per check: each of the 10 ranks ties to a named document, an internal owner and a proof.
  • Two equal pillars: feedstock and offtake carry equal weight, and a letter of intent carries none.
  • Stress before sizing: a 20% input price shock and the loss of the largest supplier come before the debt is set.
  • Score band: 80 to 100 bankable, 65 to 79 near bankable, 50 to 64 in development, 0 to 50 early stage.
Facebook
Twitter
LinkedIn

In this article

What readiness actually means in a credit file

The file I assemble has six parts, and every one is checkable: a completed FEED, feedstock contracts signed for the full requirement, a firm offtake with a buyer whose credit survives review, site control, utilities and permits, a downside model that still covers debt when inputs get expensive, and a risk register with a named owner on every line.

Behind that file the market is still thin: 11 technical pathways, 18 ACT-SAF studies completed, and a long-term outlook of up to USD 3.2 trillion from fuel suppliers and USD 4.07 trillion from operators by 2050. At that scale lenders screen on evidence rather than ambition. Where the money comes from is the next question, and I set out the routes in How to finance a SAF project.

What this means for you: treat readiness as an evidence problem. Each of the six parts should exist as a dated document with a name attached before you request a meeting with a lender.

Ten checks, each tied to a document and an owner

ICAO’s Finvest bankability checklist ranks 10 items: 1 Project narrative, 2 Technology readiness, 3 Construction risk, 4 Delivery capability, 5 Feedstock security, 6 Infrastructure and permits, 7 Capital structure, 8 Contracted revenue, 9 Creditworthy counterparties, 10 Policy support. The ranking matters less than the format behind it: every rank has to arrive as a named document, an internal owner and a proof you hand to the lender.

The entry checklist and the bankability checklist are the only two mandatory steps on the Finvest path. The bankability training behind the checklist asks the blunt question that decides everything: can this project earn enough cash, reliably enough, to attract investment and repay its debt? The proofs are role-specific: development brings the budget, the team register and the risk register with owners; engineering brings test results and independent review; finance brings the model, the contractual schedule and the data room; operations brings operating references and acceptance tests.

What this means for you: assign one owner to each of the 10 ranks and ask that owner for the single document they would hand a lender. Where no document exists, that rank is your work queue.

Feedstock and offtake: two equal pillars

Feedstock and offtake are the two equal pillars of the credit file. A letter of intent on either side is a placeholder; the lender wants contracts covering volume, quality, price and delivery, with termination rights written in.

Feedstock is where most files weaken. Contracts must be as watertight as the offtake, because recontracting risk and sub-investment-grade suppliers transfer straight into the model. The same used cooking oil is contested by biodiesel, renewable diesel and SAF. HEFA is proven but limited on inputs, while e-fuels promise scale against a biogenic CO2 supply that is limited and expensive; that trade is the one I work through in e-SAF project finance.

On the revenue side, the teaching case uses a 10-year purchase contract for 60 000 tonnes per year with price, volumes, eligibility and termination rights, plus buyer credit review and payment security. In the illustrative developer case the contrast is visible: non-binding MOUs with 2 major airlines against one firm contract with a major OEM for 15 million litres per year over 10 years, with an option to 60 million. Only one of those is a pillar.

What this means for you: score feedstock security and contracted revenue side by side. If one is signed and the other is not, you have one pillar and a hope.

The engineering file: from feasibility to FEED

Worley notes that many SAF projects never get past early development. The causes it names are familiar: uncertainty on feedstock and economics, technology and licensor selection risk, integration complexity, permitting challenges and gaps in FID readiness. Its de-risking tools are the ones lenders expect: levelized cost analysis, CAPEX and OPEX ranges, and risk registers prepared for lenders and investors.

My illustrative developer case runs about 180 million litres per year on the HEFA pathway, with a technology provider that has 2 other plants, FEED completed, an EPC (engineering, procurement and construction contract) contractor identified but not signed, a cost estimate good to plus or minus 25%, a team of 6, used cooking oil contracts covering 70% of needs with the remaining 30% importable, 25% equity committed, a construction cost estimated at 550 million USD, and target operations in 2029. ICAO ran the feasibility study in 2025, and the next step is an approach to a group of commercial banks, development finance institutions (DFIs) and strategic investors.

Construction risk sits at rank 3. The proof is a contingency provision sized against the cost estimate, a contractor credit review, and delay and performance remedies written into the construction contract.

What this means for you: an unsigned EPC with a plus or minus 25% cost estimate tells a lender the price is a range and the schedule is a guess. Close the contract, size the contingency, then send the file.

Permits, infrastructure, certification and policy

Rank 6 covers infrastructure and permits: a secured site, confirmed utilities and the permits themselves. Rank 10 covers policy support: long-term support and rules that are promulgated rather than proposed. Between them sits certification, where the lender wants a CORSIA (Carbon Offsetting and Reduction Scheme for International Aviation) certification plan, traceability on every batch and audit evidence, because eligibility decides whether the fuel earns revenue at all.

Predictability matters as much as the permit. ICAO’s financing session of 3 to 5 April 2023, a source now older than two years, records banks asking for clear criteria and harmonised frameworks, and calling predictability of offtakes and regulatory reliability essential.

Mandates are the floor you beat, not the reason you win. The illustrative case carries a potential 5% carbon intensity reduction mandate from 2030 that is not yet enacted, and one of the three high-impact actions taken six months later is that mandate adopted effective 2030. The wider policy direction sits in low-carbon fuel mandates, and it is urgent: SAF has to go from 0.1% to 10% of global kerosene by 2030, which means 300 plants in the next 7 years.

What this means for you: assemble permits, utility confirmation and the certification plan as one package with one owner, because ranks 6 and 10 are read together by the same reviewer.

The downside case the lender will run

The lender does not size debt on your base case. In the training case, base cash available for debt service is 24 million USD against an 18 million USD payment, a debt service coverage ratio (DSCR) of 1.33 times, cash available for debt service over the payment due. Add an input shock of 16 million USD and coverage falls to 0.89 times.

The stress combines two events: a 20% input price increase and the loss of the largest supplier. Loss allocation is where sponsorship gets tested. The sponsor carries the first losses, as I set out in low carbon fuels investment, the lender sizes on stressed flows, and a public financier or insurer covers a defined risk.

Public money is the bridge. ICAO has run workshops with 35 public and private financing institutions, and blended finance works as a de-risking catalyst when criteria are clear; those institutions are covered in development finance institutions. Three financing archetypes are on the table: a public loan with a public guarantee, a commercial loan with a public guarantee, and a commercial loan without a guarantee. The public route carries a DOE Loan Programs Office review that takes 6 to 12 months or more. Returns follow: about 15% IRR on leveraged funds for operating projects, more than 20% with development risk, more than 40% in venture capital for pre-offtake projects, and a fund above 100 million USD wants an exit market at 5 to 7 years.

What this means for you: run the 20% shock and the loss of your largest supplier on your own model before a lender does, and name who absorbs each loss.

Scoring your own file before anyone else does

The Finvest self-assessment scores each criterion from 1 to 5: 5 is investment-ready, 4 means minor issues, 3 is promising, 2 raises significant concerns, and 1 marks a critical weakness. For each line I answer Yes, Partial or No against the document that would prove it, then total the score into one of four bands: 80 to 100 is Bankable, 65 to 79 is Near Bankable, 50 to 64 is In Development, 0 to 50 is Early Stage.

The band tells you what to do next. Early Stage means build the narrative and the feasibility work. In Development means finish FEED, sign contracts and close permit gaps. Near Bankable means the data room, model and downside case get a dry run with people who will say no. Bankable means you can start the process.

What this means for you: score the file honestly before a lender scores it for you, because a Partial on a contract line is worth more than a confident slide.

The three actions that move the score most

Send the file in an order that lets a reviewer confirm each claim. First the risk register with owners, the team register and the development budget. Second the FEED, the test results with independent review, the cost estimate with its contingency provision and the contractual schedule. Third the signed feedstock and offtake contracts, the data room and the downside model carrying the 20% input price increase and the loss of the largest supplier.

Then take the three actions with the highest impact: a 15-year offtake with a major airline for 60 million litres per year, feedstock repositioned on an aggregator with risk guarantees, and the 5% mandate adopted effective 2030.

Everything above returns to the same pair: feedstock and offtake, two equal pillars, signed rather than intended.

What this means for you: send the risk register first, the engineering file second, and the two signed pillars third, then ask for the meeting once every line carries an owner, a document and a date.

Sources

Frequently asked questions

It depends on the band you start from. The two checklists are the only mandatory steps, and the path publishes durations of about 12 months, about 24 months and 18 to 48 months. A file at 50 to 64 needs the long window because contracts and permits are still open; a file at 65 to 79 usually needs the shorter one.

In practice I send the risk register with named owners first, because it shows who is accountable for everything that follows, then the completed FEED, because it converts the cost estimate from a guess into a basis. A lender that finds an owned risk register and a finished FEED will keep reading; one that finds only a feasibility study usually stops.

They count for nothing in a credit file. The teaching case in the bankability training has a plant of 100 000 tonnes per year from used cooking oil, supplier letters and airline interest, and no financing at all: contracts must cover volume, quality, price and delivery before a lender will model the revenue.

No. A mandate is a floor you beat, not a buyer. In the illustrative case the potential 5% carbon intensity reduction mandate from 2030 was not yet enacted when the file was assembled, and even adopted it never replaced the signed 10-year purchase contract with price, volumes, eligibility, termination rights, buyer credit review and payment security. Predictability of offtakes and regulatory reliability are two separate tests.

Want this checklist run against your own file?

A short call is usually enough to see where your project stands.

If you want this checklist run against your own file, I work through it with you on project finance support, starting with the risk register and the contract schedule.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia