Green Sukuk for SAF Projects: What the Islamic Route Changes
10 min read · Jun 2, 2026 · By Alex
If you are a sustainable aviation fuel developer in Southeast Asia, standing before a final investment decision (FID), asking whether Islamic capital markets can carry your file.
For example, The direct answer is yes, under three conditions. The money is confined to eligible green projects that are also compliant with Shariah (Islamic law). Specifically, The documentation passes a Shariah board, and you commit to tracking and reporting the spend. Instead, Those three conditions decide whether a green sukuk (Islamic investment certificates representing an interest in real assets) is realistic for a SAF plant rather than a label on paper. Specifically, I hold the wider comparison against bank debt and equity in my guide on Islamic finance for SAF projects. Furthermore, From here I work through green sukuk project finance as a developer meets it: an eligible use of proceeds, a Shariah approval gate, and a reporting burden that runs for the life of the instrument.
Green sukuk project finance: the destination date
Aviation has already fixed the destination date, and the capital has to follow it. Instead, ICAO has adopted a collective long-term global aspirational goal for net-zero carbon emissions by 2050, and IATA has committed its member airlines to achieve net-zero emissions from operations by 2050, bringing the industry into alignment with the Paris Agreement’s 1.5 degree target (Dentons, 30 June 2026). Instead, Meeting that commitment requires new technology, accessible SAF, operational efficiencies, market-based measures. Also, a fundamental reshaping of how aviation is financed (Dentons).
In short
- Route: A green sukuk fits a SAF project only when eligible spending, Shariah board approval and published reporting run together.
- Frame: The Green Bond Principles supply four components: use of proceeds, project selection, management of the money and reporting.
- Shariah gate: Documentation approval and a sufficient pool of Shariah-compliant assets are gating items, not paperwork collected at the end.
- Market: Sustainable sukuk issuance reached USD 13.4 billion in 2023, the seventh consecutive record year since 2017.
- Price: The yield advantage exists but is small, so demand rather than price is the stronger argument for the label.
In this article
What a green sukuk is, and whether it fits a SAF project
A green sukuk is a use of proceeds instrument, where use of proceeds means the way the raised money must be spent. The proceeds, or an equivalent amount, are exclusively applied to finance or re-finance new or existing eligible green projects aligned with the four core components of the ICMA Green Bond Principles, and those projects must also satisfy Shariah conditions (ICMA, Islamic Development Bank and LSEG, April 2024).
The aviation numbers explain the interest. However, IATA’s net-zero 2050 commitment assumes that most aviation’s decarbonisation will come from SAF, supported by new aircraft technology, operational improvements and carbon removals, and Dentons names project finance and capital markets solutions as the instruments to support SAF plants, airport green infrastructure and low-emission ground operations (Dentons, 30 June 2026).
What this means for you: if you hold an eligible SAF plant. Consequently, A spending plan you can defend and a habit of disclosure. Instead, This route is available to you, and the three conditions above are the entry ticket rather than an optional extra.
The green frame you are buying into: four components
Green bonds are instruments where the proceeds or an equivalent amount will be exclusively applied to finance or re-finance new or existing eligible green projects aligned with the four core components of the Green Bond Principles, and the same components govern a green sukuk: use of proceeds, project selection, management of the proceeds and reporting (ICMA, Islamic Development Bank and LSEG, April 2024).
The environmental objectives behind them are climate change mitigation, climate change adaptation, natural resource conservation, biodiversity conservation, and pollution prevention and control, with eligible categories including renewable energy and energy efficiency (ICMA…). For example, On review the Principles recommend an external review before issuance, most commonly a second party opinion (an independent assessment of a financing framework) published on the issuer’s website (ICMA…).
After closing, market practice tracks equivalent amounts of net proceeds. Also, The recommendation is an external auditor or third party to verify that internal tracking, and allocation plus impact are reported annually (ICMA…).
What this means for you: the four components are a work plan with dates on it. Also, a SAF developer who can satisfy all four before pricing has removed the most common objection an investor will raise.
The Shariah layer on top of it
Sukuk are defined under AAOIFI Shari’ah Standard No. 17 as certificates of equal value representing undivided shares in ownership of tangible assets, usufruct and services or in the ownership of assets of particular projects or special investment activity (ICMA, Islamic Development Bank and LSEG, April 2024). Furthermore, Two obligations sit on top of the green frame: legal documentation approved by a Shariah board composed of Islamic scholars with financial acumen, and a sufficient amount of Shariah-compliant assets to underpin the structure (ICMA…).
Shariah principles prohibit riba (interest), excessive uncertainty (gharar) and investment in harmful activities. Meanwhile, requiring transactions to be underpinned by real economic activity and risk sharing (Dentons, 30 June 2026). For example, A negative screening excludes assets from sectors such as revenues from selling alcohol, gambling, adult entertainment and weapons (ICMA…).
Board approval also asks that the business and assets of the obligor align with the objectives of Shariah, safeguarding human life, faith, intellect, posterity, and property and wealth (ICMA…).
What this means for you: the Shariah board is a second filter with its own timetable. Therefore, your green framework and your Shariah screening have to be designed together rather than run in sequence.
The market: size, growth and who is already buying
The sustainable sukuk market began in 2017, and issuance reached USD 13.4 billion in 2023, above the USD 9.4 billion recorded for 2022 and the seventh consecutive record year (ICMA, Islamic Development Bank and LSEG, April 2024).
Supply is concentrated: issuers from Malaysia, Indonesia. Meanwhile, The UAE and Saudi Arabia collectively raised 83.3 percent of the cumulative total by that quarter, with the Indonesia government the largest single issuer in 2023 (ICMA…).
UNDP and Kuwait Finance House put green sukuk issuance at a record USD 11 billion by the third quarter of 2024 and estimate that USD 30 billion to USD 50 billion could be raised through green and sustainability sukuk by 2025 (UNDP IICPSD and Kuwait Finance House, 2024). Moreover, The claim the investor holds in your own file is a separate question, which I set out in green bond vs green sukuk.
What this means for you: this is a real market with real volume. However, it is concentrated in a handful of jurisdictions, so where you issue will shape your pricing at least as much as what you finance.
Malaysia and Indonesia: where a SAF issuer would actually go
The Securities Commission of Malaysia introduced the Sustainable and Responsible Investment Sukuk Framework in 2014, and the world’s first green sukuk followed in 2017 when Tadau Energy issued MYR 250 million for a large-scale solar photovoltaic plant, certified by CICERO (UNDP IICPSD and Kuwait Finance House, 2024). Meanwhile, The framework lets issuers align with national standards or with ICMA’s Green Bond Principles,.
Indonesia has been the pioneer in sovereign green sukuk since 2018: a first issuance on 1 March 2018 at 3.75 percent over 5 years for USD 1,250 million on a wakala (agency contract) structure listed in Singapore and Dubai, then a 30-year issuance in 2021 and a 10-year tranche in June 2022, with total issuance of USD 6.9 billion reported by the study (UNDP…).
What your project has to satisfy to travel on these frames is a separate exercise, and I set out the test in SAF sustainability criteria.
What this means for you: both markets will fund a SAF issuer, but only against a framework they already recognise. Therefore, matching your documentation to the local frame is cheaper than inventing one.
What a SAF developer actually has to produce
The label is a production exercise as much as a financing one. In fact, I need eligible projects, a framework, tracking of the money and published impact, and the aviation version of that impact report runs on fuel-efficiency data. In fact, SAF usage metrics and emissions-intensity performance, sometimes verified by independent assurance providers (Dentons, 30 June 2026).
Key performance indicator (KPI) choice is where deals are won or lost. Instead, In sustainability-linked sukuk the selection and calibration of KPIs is critical, and aviation examples include emissions intensity per revenue tonne kilometre, absolute emissions trajectories and SAF uptake percentages (Dentons). For example, The precedent is not theoretical: Etihad Airways launched a USD 600 million transition sukuk in 2020. In fact, The world’s first sustainability-linked sukuk and the first transition-labelled financing in global aviation, (Dentons).
Two cautions come from the market studies. However, Issuance costs are higher because of external certification and reporting mandates (UNDP IICPSD and Kuwait Finance House, 2024). Whether SAF mandates carry the rest of your revenue case is a separate question, and I treat it in SAF mandates.
What this means for you: budget for data collection and assurance from the start, because an impact report you cannot evidence is the fastest route to losing the label.
Pricing, demand and what it means for your term sheet
The yield advantage is real but small. Also, it goes by the greenium (the yield advantage a green instrument can achieve over a conventional one). In 2020 the National Mortgage Corporation of Malaysia issued a 3-year sustainability SRI sukuk that recorded a yield 2 basis points lower than its non-SRI sukuk (UNDP IICPSD and Kuwait Finance House, 2024).
Demand is the stronger argument. Around 55 percent of investors intend to invest in green and sustainability sukuk in coming years, and the reasons the study records run in this order: fulfilling an ESG investment mandate, alignment with Shariah principles, higher returns and attractive pricing (UNDP…).
On the borrower side, lenders and investors increasingly scrutinise aviation exposure through an ESG lens, and borrowers with credible decarbonisation strategies can access green or sustainability-linked products on more favourable terms (Dentons, 30 June 2026). None of that replaces the gates a project must clear, which is where reaching FID starts, and where project finance structuring earns its place.
What this means for you: price the label as a modest gain, and treat the investor base. Also, the ESG lens as the reason to do the work rather than the 2 basis points.
How I would run this if it were my file
I would start from the use of proceeds, not from the instrument. I would write the list of eligible projects first, check it against the Green Bond Principles objectives. Also, the ASEAN exclusions, and only then decide whether the sukuk label is worth the extra process (ICMA, Islamic Development Bank and LSEG, April 2024).
I would put the Shariah board in the room before the framework is drafted, because documentation approval and the asset pool requirement are gating items rather than signatures collected at the end (ICMA…). Therefore, I would budget for the external review, the verification of allocation and the annual impact report as part of the cost of the ticket (UNDP IICPSD and Kuwait Finance House, 2024).
I would choose the structure from the assets I hold. Wakala where a managed portfolio carries the instrument, ijara (lease contract) where lease assets do, istisna’a where the plant is still being built (ICMA…. Latham and Watkins, 2015). Norton Rose Fulbright records that the most frequently used structures in Middle East project finance are the Istisna’a-Ijara and Wakala-Ijara combinations (Norton Rose Fulbright, 2016. A republished article whose original dates from February 2010, older than two years).
Green sukuk project finance: the KPIs I would keep
I would keep the aviation KPIs auditable and aligned with what buyers. Also, regulators already measure, the way the Etihad Airways transition sukuk did (Dentons, 30 June 2026). And I would read the instrument as one slice of the capital stack: equity, bank debt and the offtake (the contract under which a buyer takes the plant’s output) still decide whether the file is financeable at all.
What this means for you: sequence the work, framework first, Shariah board second, structure third, and only then pricing, because every step you run in the wrong order costs you a round of redrafting.
Sources
- Dentons, 30 June 2026.
- ICMA, Islamic Development Bank and LSEG, April 2024.
- UNDP and Kuwait Finance House, 2024.
- Norton Rose Fulbright, 2016, republished article originally published February 2010, older than two years.
- Latham and Watkins, 2015, older than two years.
Frequently asked questions
Is a green sukuk just a green bond with an Islamic label?
The green part is the same: both are use of proceeds instruments aligned with the four core components of the Green Bond Principles, and sukuk share many features with conventional bonds. What the sukuk adds is the Shariah dimension: certificates represent undivided shares in ownership of tangible assets, usufruct and services rather than a debt, the documentation must be approved by a Shariah board, and a sufficient pool of Shariah-compliant assets must underpin the structure (ICMA, Islamic Development Bank and LSEG, April 2024; Latham and Watkins, 2015).
What can the proceeds of a SAF green sukuk pay for?
The proceeds, or an equivalent amount, are exclusively applied to finance or re-finance eligible green projects that are also Shariah-compliant. The Green Bond Principles objectives that apply are climate change mitigation, climate change adaptation, natural resource conservation, biodiversity conservation and pollution prevention and control (ICMA, Islamic Development Bank and LSEG, April 2024).
What does the Shariah board add that the green framework does not already ask for?
The green framework governs how the money is chosen, tracked and reported; the Shariah board governs whether the instrument can exist at all, approving the legal documentation and confirming that enough Shariah-compliant assets are available. (ICMA, Islamic Development Bank and LSEG, April 2024).
Who checks that the money actually reached the projects?
Three separate checks apply: a pre-issuance external review, most commonly a second party opinion published on the issuer’s website, an external auditor or third party verifying the internal tracking of proceeds after issuance, and annual allocation and impact reporting to investors (ICMA, Islamic Development Bank and LSEG, April 2024).
Want a green sukuk structure assessed for your file?
A short call is usually enough to see where your project stands.
If you want me to test your file against this route before you spend on framework drafting. The useful first step is investor introductions.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.