Home » Takaful for SAF Projects: What Islamic Insurance Does and Does Not Cover
Takaful for SAF Projects: What Islamic Insurance Does and Does Not Cover
10 min read · Jun 2, 2026 · By Alex
Islamic finance for sustainable aviation fuel opens several funding routes, and the question underneath them all is simple: does Islamic insurance cover a SAF plant’s project risk? Yes, in the general takaful lines: takaful is Islamic insurance built on mutual contribution rather than risk transfer, a contribution (the premium equivalent in takaful) paid by each participant (the policyholder equivalent in takaful); the cover answers property damage to buildings, inventory and machinery, marine cargo, personal accident and machinery failure. What it is not is conventional risk transfer, because the participant pays that sum as wholly or partially tabarru (the donation a participant pays into the common fund), and the fund is used mutually to assist members against a defined loss. That distinction is what matters most on a SAF file at FID (final investment decision) or financial close.
I write from the side of the file rather than the side of the product, because the question at close is never whether an arrangement sounds Shariah compliant, it is whether the binder responds when a column fails or a cargo lot is spoiled. What follows covers what the policies answer, how the funds are held, what a credit committee should test, and what has to be arranged before the decision point.
In short
- Coverage: general takaful lines answer plant damage, Property Takaful for buildings, inventory and machinery, Marine Takaful for cargo, plus personal accident and machinery failure.
- Fund mechanics: the contribution sits in the Participants’ Takaful Fund, separate from the Shareholders’ Fund, and a deficit is covered by a Qard-e-Hasn (an interest-free loan).
- Documentation: maintenance and insurance procurement sit with the borrower under a service agency agreement, while title passes to the Islamic financiers under the EPC.
- Capacity: retakaful (Islamic reinsurance) began in Malaysia, window operations are common in Pakistan and Indonesia, and written contributions grew from USD 19 billion in 2017 to approximately USD 30 billion in 2022.
- Screening: interest, gambling and excessive uncertainty are out, and the Shari’ah Supervisory Board’s view on your specific risks should be in writing.
In this article
What takaful covers on a SAF project, in plain terms
General Takaful covers losses or damages to properties, assets or possessions from specified events, typically a year or less, and its non-motor lines include fire, marine cargo, personal accident, burglary and machinery failure. Property Takaful protects against damage from fire, lightning and explosions across buildings, inventory and machinery, and Marine Takaful covers cargo moved by ships, planes or roads. That is a workable set for a plant under construction and in operation.
ICAO has adopted a collective long-term global aspirational goal for net-zero carbon emissions by 2050, IATA has committed its member airlines to net-zero from operations by 2050 on the assumption that most decarbonisation comes from SAF, and the Air Transport Action Group’s Waypoint 2050 analysis suggests the transition will cost USD 4.7 trillion. Dentons names project finance and capital markets solutions as the instruments to support SAF plants, and total global Islamic financial assets surpassed USD 5 trillion in 2025. Shariah principles prohibit interest (riba), excessive uncertainty (gharar) and harmful activities while requiring real economic activity and risk sharing, which is where this alternative comes from.
What this means for you: treat the schedule as named lines rather than one project policy, because the cover exists in pieces and the mutual fund behind it is what your credit memo must describe accurately.
How the money is held
Takaful derives from the Arabic word Kafalah, mutual guarantee, and rests on Tabarru and Ta’awun: a system of mutual cooperation among policyholders who reimburse each other from a pool managed by a takaful operator. Two funds sit apart, and that is the structural fact I would internalise first: the Participants’ Takaful Fund and the Shareholders’ Fund. Surplus in the participants’ fund is shared among participants only, investment returns are distributed between participants and shareholders on Mudarabah principles, and a deficit is met by the operator through an interest-free loan, the Qard-e-Hasn, recovered from future surpluses.
The two most used contracts are mudaraba, a profit-sharing partnership where the operator is mudarib and the participants are capital providers, and wakala, an agency contract. Business forms run from non-profit or cooperative, through commercial with separated shareholders’ and participants’ funds, to a scheme offered through a window of a conventional insurer.
What this means for you: ask for the fund diagram before you ask for the quote, because whether a shortfall is met by a Qard-e-Hasn and whether surplus returns to participants determine what your recovery looks like after a loss.
Which policies a plant actually needs
General Takaful contracts typically last a year or less, while Family Takaful products run 5 to 20 years, so a SAF plant sits firmly on the general side, where the useful lines are Property Takaful, Marine Takaful and Miscellaneous General Takaful tailored to corporate needs.
Anyone taking security needs two contractual details more than the line list. Obligations that would ordinarily fall to the Islamic lenders as owner and lessor, such as maintenance and procurement of insurance, are performed by the borrower under a service agency agreement and recouped within the rental payments, while title to the relevant assets typically passes to the Islamic financiers under the EPC or construction contract (Norton Rose Fulbright, 2016, an older source whose original dates from February 2010). Islamic finance is principally asset-based, so lenders bear some ownership risk and negotiate the procurement obligation as closely as the policy.
What this means for you: review the insurance procurement clause and the title clause in the same sitting, since a borrower obliged to arrange cover as agent while financiers hold title creates two obligations, either of which can fail alone.
What a credit committee should test
A takaful undertaking is a hybrid of a mutual and a commercial company, which is why supervision is harder, and governance disclosures should include Shari’ah governance arrangements. Supervisors must also ensure firms do not falsely hold themselves out as takaful firms or their products as Shariah compliant (IFSB and IAIS, 2006, an older source).
A Shari’ah Supervisory Board, typically three or more members, is a prerequisite for every takaful operator, and because scholars proficient in both Islamic law and insurance are scarce they often serve on multiple boards. Risk acceptance is the open question: opinions vary on the permissible extent of risks, especially large-scale risks with limited participants such as government projects, and insured events and exclusions are not standardised.
In 2024 Islamic insurance assets and gross written contributions increased by 16.9 percent and 15.4 percent, reaching USD 54.4 billion and USD 28.6 billion by the third quarter of 2024, against 3.20 percent premium growth in the broader insurance market. Capacity of that size is part of the bankability file rather than a separate insurance exercise.
What this means for you: test the board, the supervision and the risk acceptance opinion as three separate diligence items, because a fast-growing balance sheet does not tell you whether this peril will be approved.
Where the Shari'ah screen meets your coverage
To be acceptable to Islam, any form of insurance should avoid riba, maisir (gambling) and gharar, and Shariah principles require transactions underpinned by real economic activity and risk sharing. The same logic runs through the policy wording, the investment of the fund and the reinsurance route.
One caution is older and explicit: some Shari’a scholars have questioned the enforceability of insurance provisions on the basis that a contract of insurance has been associated with gambling, an activity proscribed by the Shari’a (Norton Rose Fulbright, 2016, an older source whose original dates from February 2010). That is a scholarly position rather than market practice, but it surfaces when a particular risk goes to the board. It also sits next to your SAF sustainability criteria, because a Shariah-compliant fund and a feedstock that fails a sustainability test are two different failures.
What this means for you: ask in writing which of your risks the board has already accepted and which it has not, because an untested risk is a coverage question that arrives after the loss instead of before it.
Capacity, retakaful and what to arrange before financial close
Retakaful, the equivalent of conventional reinsurance, was developed initially in Malaysia, and at the time of the IFSB and IAIS paper most takaful operators reinsured with conventional reinsurers, acceptable so long as there is no practicable Shariah-compliant alternative. Window operations are prevalent in Pakistan and Indonesia, where most have evolved into full-fledged takaful entities.
The market has scale but not uniformity: written contributions grew from USD 19 billion in 2017 to approximately USD 30 billion in 2022, while the Islamic Financial Services Board records limited availability of Islamic financial instruments, concentration risks in investment portfolios and pressure in less mature markets. Government sponsors can also provide some protection, third party or environmental risk, through an indemnity or statutory relief, and capacity of any kind has to be arranged before the route to FID is settled.
What this means for you: lock retakaful capacity, window or full-fledged, and any government indemnity before the file moves to close, because capacity that arrives after the decision point is a gap you will be asked to explain.
Cost, process and the rest of the risk allocation
The fee structure differs in a way that shows up in a quote: elevated wakala fees can reduce participants’ contributions and hurt competitiveness, and a Wakala Fee, Mudarib Share and Qard-e-Hasn are takaful-specific concepts with no conventional equivalent. Investments sit inside the fund and are Shariah compliant, a constraint the sector lists alongside limited permitted investment avenues.
The reporting you will be asked for runs in parallel: fuel-efficiency data, SAF usage metrics and emissions-intensity performance measured against KPIs such as emissions intensity per revenue tonne kilometre. Those numbers tie back to your offtake (the contract under which a buyer takes the plant’s output) and to the asset documentation, where title transfer and beneficial ownership issues arise with the Cape Town Convention of 2001 on International Interests in Mobile Equipment. Etihad Airways in 2020 set the precedent with a USD 600 million transition sukuk, the world’s first sustainability-linked sukuk, linked to a 20 percent reduction in emissions intensity of its passenger fleet by 2025, a 50 percent reduction in net emissions by 2035 and net-zero carbon emissions by 2050.
For the wider sequence see how to finance a SAF project, and for insurance in the contract package, contracting and risk management.
What this means for you: budget wakala fees and the reporting package together, because the emissions-intensity and SAF usage numbers that service your disclosure are the ones an auditor will test against your offtake and your contribution history.
How I would run this if it were my file
I would map every risk in the EPC or construction contract against a named policy before pricing anything, because Property Takaful, Marine Takaful and Miscellaneous General Takaful are the lines that answer construction, logistics and machinery damage. I would confirm the fund structure in writing: which fund holds the contribution, who covers a deficit through a Qard-e-Hasn and where the surplus goes. I would fix the reinsurance route early and treat capacity as a closing condition. I would ask the Shari’ah Supervisory Board for its view on the specific risks in writing, since risk acceptance is where scholarly opinions diverge most. And I would read takaful as one layer of the capital stack, not the whole risk plan.
What this means for you: run those checks as one sequence on one page, and at financial close you will know exactly which risk sits in the participant fund, which sits behind the lender’s security, and which sits nowhere yet.
Sources
- Dentons, 30 June 2026.
- Islamic Financial Services Board, May 2025.
- Society of Actuaries Research Institute, April 2024.
- Norton Rose Fulbright, 22 September 2016, an older source whose original dates from February 2010.
- Islamic Financial Services Board and International Association of Insurance Supervisors, August 2006, an older source.
Frequently asked questions
Is takaful just insurance with an Islamic label?
No. Takaful rests on Tabarru and Ta’awun, participants contribute into a common fund, the Participants’ Takaful Fund is segregated from the Shareholders’ Fund, surplus is shared among participants only, investments are Shariah compliant and a Shari’ah Supervisory Board is required.
Who pays when the participant fund runs short?
The operator steps in: in the event of a deficit the takaful operator provides an interest-free loan, the Qard-e-Hasn, recovered from future surpluses, whereas in a mutual members indemnify each other.
Can a project rely on takaful alone for construction risk?
Not alone. Insurance provisions have been questioned by some Shari’a scholars, government sponsors may supply protection through an indemnity or statutory relief, and title to the assets passes to the Islamic financiers under the EPC, so the contract package and the security package have to sit together.
Does retakaful capacity exist in Southeast Asia?
Yes, with a history: retakaful was developed initially in Malaysia, window operations are prevalent in Indonesia, where most have evolved into full-fledged takaful entities, and takaful written contributions grew from USD 19 billion in 2017 to approximately USD 30 billion in 2022.
Want the takaful cover tested against your own risk register?
A short call is usually enough to see where your project stands.
If takaful risk mitigation is the open item on your live SAF file, I work it alongside the capital plan through project risk allocation and the contracting package that supports it.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.