Home » Who Buys Green Hydrogen? The Buyers I Would Approach First
Who Buys Green Hydrogen? The Buyers I Would Approach First
10 min read · Jan 2, 2026 · By Alex
Ammonia producers, refineries and methanol producers are the three groups taking hydrogen in Southeast Asia. In fact, that demand reached 4 Mt in 2024. Ammonia took 49 percent, refining 31 percent and methanol 20 percent (December 2025). Green hydrogen means hydrogen made from renewable electricity by splitting water. Also, an offtaker is the buyer that signs a contract for the output. That is the answer to who buys green hydrogen in this region. Also, it holds before I open any offtake negotiation. I work from demand that already exists rather than from the project pipeline. The three groups sit inside hydrogen, power-to-liquid and e-fuels. Announced buyers and contracted buyers are not the same thing, and that distinction runs through everything below.
Below I set the buyer groups in the order I would approach them. For each one I give what it absorbs, what I ask first, and the evidence I want. That evidence comes before I spend a week in a negotiation. In fact, the order is mine, and every figure carries the date of its publication.
Three lines of context
In short
- Demand: Southeast Asia consumed 4 Mt of hydrogen in 2024, split 49 percent ammonia, 31 percent refining and 20 percent methanol (December 2025).
- Gap: buyers announced 7 Mtpa of purchase agreements between 2021 and 2025 against 1.6 Mtpa firm (December 2025). In addition, 94 percent of planned offtake capacity has no identified offtaker (January 2026).
- Buyers: Ammonia producers first, then refineries, then methanol producers, in that order.
- Credit: Financed projects show a constant presence of creditworthy offtakers or substantial credit enhancements (January 2026).
- Sequence: I approach the group that already runs hydrogen in its own process before the group that has signed a memorandum.
In this article
Where the demand actually sits
Between 2021 and 2025, buyers announced 7 Mtpa of purchase agreements worldwide. Also, only 1.6 Mtpa of that is firm. Meanwhile, developers plan 16.5 Mtpa of export projects to 2030, with only 4.2 Mtpa showing an identified buyer (December 2025). Across planned offtake capacity as a whole, 94 percent carries no identified offtaker against 6 percent that carries one (January 2026). A firm offtake is a binding purchase contract that a lender counts as revenue when it sizes the debt.
The gap between an announced buyer and a contracted buyer is the gap between a press release and a payment obligation. An announced buyer is a name on a memorandum or a stated policy target. A contracted buyer has accepted a volume, a duration, a price mechanism and a remedy for non-delivery. Announced volume is a claim about intent, contracted volume a claim about money. I keep the two apart in every model I build, because only the second one moves a financing.
What this means for you: count only the volume with a named buyer under signature before you price anything, and treat the rest as a lead rather than as demand.
The three buyer groups that already use hydrogen
The IEA briefing of 9 December 2025 puts Southeast Asian demand at 4 Mt in 2024. By use, ammonia takes 49 percent, refining 31 percent and methanol 20 percent. Specifically, Indonesia takes 35 percent, Malaysia 22 percent, Viet Nam 15 percent and Singapore 12 percent (December 2025).
Ammonia producers absorb 49 percent in 2024 because ammonia carries hydrogen in a molecule that already moves by ship. What I ask first: is there a buyer specification for carbon intensity, and is the volume firm or a memorandum?
Refineries absorb 31 percent in 2024 because they consume hydrogen in their own process, so the volume stays continuous. What I ask first: what they intend to displace, their own output or a new purchase?
Methanol producers absorb 20 percent in 2024, the smallest of the three groups. What I ask first: whether the threshold comes from their customer or from a national rule?
Production routes and certification for the molecule sit in my note on how green hydrogen is made and certified.
What this means for you: open with the group that already buys hydrogen today, since an existing purchasing habit shortens a negotiation.
Ammonia and methanol buyers in detail
The Green Hydrogen Organisation paper of 2024 reports that only 10 percent of announced projects have identified a buyer, and that of the contracted volume 13 percent is contractually binding, 7 percent is pre-contractual and 80 percent is memorandums or unspecified.
The project usually held up as proof the model works is NEOM: it reached financial close in May 2023. Moreover, the market oversubscribed it more than two times. 23 banks and investment companies provided 8.4 billion USD of non-recourse financing (2024). Financial close is when all parties sign the financing documents. Also, the funds become available. Non-recourse financing means lenders repay themselves from project revenue alone, with no claim on the sponsors’ wider assets.
An ammonia buyer and a methanol buyer read a contract differently: the ammonia buyer is buying an export position, the methanol buyer an input. The ammonia side sits in green ammonia offtake in Southeast Asia.
What this means for you: check how many rivals actually have a buyer, because only 10 percent of announced projects had identified one in 2024, and price your approach on that.
The deals that are already signed
The Oxford Institute for Energy Studies study of August 2025 records two agreements worth reading closely. In March 2025 RWE and TotalEnergies agreed 30 000 tonnes of green hydrogen per year for 15 years starting in 2030. In May 2025 ExxonMobil and Marubeni signed an agreement for about 250 000 tonnes of low-carbon ammonia per year from Baytown, Texas.
Neither is a firm contract taking delivery today, and the first would not move a molecule before 2030. A mandate is a legal requirement to use a stated share of a fuel. Also, in 2024 mandates and demand targets became the mechanisms for closing the price gap between green and fossil hydrogen.
Both therefore count as long dated purchase commitments rather than firm contracts. The policy instruments are set out in low carbon fuel mandates.
What this means for you: read any signed agreement for a start date, a volume and a remedy. As a result, those three decide whether you are looking at a contract or at an intention.
What a buyer's credit is worth to me
The Oxford Institute for Energy Studies review of January 2026 shows the offtake as the anchor of the financing in projects that have reached FID, the final investment decision. It also shows that the presence of investment grade offtakers or substantial credit enhancements is a constant feature of financed projects, and that off-take and market risk followed by political and regulatory uncertainty are the most critical barriers to financing in emerging markets and developing economies.
Investment grade is the credit category that begins at BBB- (2024), which is why I ask for a rating or for credit support before I discuss price.
The same review notes that some European projects reached FID with contracts of 5 to 7 years, needing an equity contribution of around 50 percent to offset the shorter revenue certainty (January 2026). Short contracts move risk onto the sponsor, who prices it into the offer.
The method I use is set out in how to secure offtake agreements.
What this means for you: treat the buyer’s credit as part of the price, since a weaker offtaker asks you to carry more of the risk you were trying to sell.
What I refuse to count as a buyer
Within the offtake capacity that does have an offtaker, 20 percent is unspecified, 29 percent is memorandums of understanding, 15 percent is pre-contractual agreements, 23 percent is self-consumption and 13 percent is firm commitments (January 2026). Self-consumption is a real offtake for the owner, but it is not a market for anyone else. An announced capacity is not operating capacity, a signed agreement is not a firm contract. Also, a memorandum is not revenue (2024).
Three tests decide whether I open a negotiation. First, does a named legal entity commit to take the volume. Second, is there a remedy it pays if it does not take delivery. Third, does the credit behind it stand alone or need support.
Everything else is intelligence, useful for planning and useless for a revenue model.
What this means for you: run the three tests on every name you are handed. Instead, keep the conversation but take the volume out of your revenue case if one fails.
What this means for a Southeast Asian developer
Announced regional projects equal 12 percent of current demand. Meanwhile, only 6 percent of announced capacity has reached FID (December 2025). Close to 11 Mtpa of potential sits below 6 USD/kg by 2030, most of it in Indonesia (December 2025). No certification scheme is in place in the region, with work running in three countries and five countries holding a national strategy (December 2025).
That combination is why my sequencing differs from a cost ranking. Cheap potential without a certification route cannot reach the buyers who need it. Therefore, a buyer who cannot certify your molecule will not sign for it.
The geography of the pipeline is mapped in green hydrogen projects in Southeast Asia for developers.
What this means for you: before you approach anyone, know which certification route your volume will travel on, because in this region that work is still running in three countries as of December 2025.
How I sequence the approach
The IEA page of five key questions from 2025 closes the sequence. Firm purchase agreements cumulate to less than 2 Mtpa, or 5 percent of the production potential announced for 2030. Specifically, 9 percent of announced projects have secured committed investment against 0.5 percent in emerging economies. In fact, the cost of capital can reach 15 percent in emerging economies. That is three times the level of advanced economies (2025).
Committed investment means pledged money, not spent money. As a result, that gap is where projects stop.
I approach refineries first, because they consume hydrogen in their own process and the need stays continuous. Ammonia producers come second in my approach, because they hold the largest share of regional demand in 2024. I approach methanol producers third, because their share is the smallest and their specification questions take longest to settle.
What this means for you: work the list in that order and let each refusal tell you what the next buyer will ask for.
Sources
- Oxford Institute for Energy Studies, Hydrogen Offtake Agreements https://www.oxfordenergy.org/wpcms/wp-content/uploads/2025/08/ET50-Hydrogen-Offtake-Agreements.pdf, August 2025.
- Green Hydrogen Organisation, Key considerations for green hydrogen offtake agreements https://gh2.org/sites/default/files/2024-05/GH2_Considerations%20for%20Hydrogen%20Offtake%20Agreements_2024.pdf, 2024.
- Oxford Institute for Energy Studies, Bankability of Hydrogen Projects: Key Risks, Financing Challenges and Mitigation Solutions https://www.oxfordenergy.org/wpcms/wp-content/uploads/2026/01/ET52-Bankability-of-Hydrogen-Projects.pdf, January 2026.
- IEA, Global Hydrogen Review 2025, Southeast Asia, 9 December 2025 https://iea.blob.core.windows.net/assets/745a259b-9cb7-4e1d-9ba1-a8b63d1eaae8/GHR2025_SEA_Webinar.pdf, 2025.
- IEA, Global Hydrogen Review 2025, Five key questions about hydrogen https://www.iea.org/reports/global-hydrogen-review-2025/five-key-questions-about-hydrogen, 2025.
Frequently asked questions
Who buys green hydrogen today?
Ammonia producers, refineries and methanol producers, in that order. In Southeast Asia demand reached 4 Mt in 2024, with ammonia at 49 percent, refining at 31 percent and methanol at 20 percent (December 2025). The same demand splits by country as Indonesia at 35 percent, Malaysia at 22 percent, Viet Nam at 15 percent and Singapore at 12 percent (December 2025).
Which buyer should a new project approach first?
The group that already runs hydrogen in its own process and can absorb volume at scale, in a market where announced projects equal 12 percent of current demand and only 6 percent of announced capacity has reached FID (December 2025). It already has a meter and a specification, so the conversation starts at volume rather than at explanation.
How many announced buyers are real?
Few. Only 10 percent of announced projects had identified a buyer in 2024, and of the contracted volume 13 percent was contractually binding, 7 percent was pre-contractual and 80 percent was memorandums or unspecified (2024). Even inside the capacity that has an offtaker, firm commitments are 13 percent of the total (January 2026).
What makes an offtaker worth negotiating with?
Credit quality and commitment. Investment grade begins at BBB- (2024), and financed projects show a constant presence of investment grade offtakers or substantial credit enhancements, a pattern recorded in January 2026. Credit support can take the form of a letter of credit, a bank guarantee, a parent guarantee or retained sums (2024). A buyer that can hold a long-dated volume without credit support is worth more to a financing than a bigger name that will not commit.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you are at concept stage and want the buyer list narrowed before the first call, my offtake structuring work runs from buyer selection through term sheet review, so you open the negotiation knowing which of the three groups you are actually talking to and what evidence it will ask you for.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.