Home » Woody Biomass SAF Feedstock: What Is Left After the Pulp and Pellet Mills
Woody Biomass SAF Feedstock: What Is Left After the Pulp and Pellet Mills
10 min read · Nov 2, 2026 · By Alex
Woody biomass is a feedstock for sustainable aviation fuel only when I can show a balance rather than a headline number. The RSB counts 31.5 million tonnes a year of forest and wood industry residues in Southeast Asia in dry mass. Dry mass is the weight once drying removes the water. That is 8.4% of the 375.3 million tonnes of regional feedstock. The RSB converts them to just 2.8 million tonnes of SAF through Fischer-Tropsch. Pulp and paper, wood pellets and bioenergy already contest those tonnes. Therefore, what I can contract is the balance after competition, not the regional statistic. I read the wider context in feedstock availability in Southeast Asia, then I test whether a woody biomass SAF feedstock survives that context.
The question I ask here
My question here is narrow: is there a balance I can actually buy in this region, and what decides whether it reaches a fuel specification. Three things settle it: what the certifier counts as a residue and which conversion route I run. The third is who else already holds the same fibre.
In short
- The number: RSB counts 31.5 million tonnes a year of forest and wood industry residues in Southeast Asia, converting to 2.8 million tonnes of SAF through FT.
- The catch: Fastmarkets notes those resources already serve pulp and paper, wood pellets and bioenergy, so an aggregate figure is not a contract.
- The route: Gasification with FT qualifies under ASTM D7566, while pyrolysis-to-jet does not yet.
- The cost: An FT plant in Malaysia approaches USD 9.5 per litre of SAF against USD 0.7 per litre for the lowest HEFA plant in Indonesia.
- The order: Catchment first, then the residue definition, then transport, then the qualified route.
In this article
The short answer: it is a balance, not a headline number
The RSB counts 31.5 million tonnes a year of forest and wood industry residues in Southeast Asia in dry mass. That is 8.4% of the 375.3 million tonnes of regional feedstock. FT converts them into 2.8 million tonnes of SAF. That is a literature figure, not a booked supply. Fastmarkets warns that these resources sit far apart and already serve pulp and paper, wood pellet and bioenergy markets. Aggregate estimates of biomass availability may therefore miss the volumes commercially accessible for SAF. The commercially accessible volume depends on regional forest conditions, competing demand, material collection and transport costs. Also, the ability to secure reliable supply over the life of a project. The residue family is one of five feedstock families the RSB tracks, and until 2030 the focus of the region stays on oils and fats, with lignocellulosic feedstocks gaining weight towards 2050 as ATJ uptake grows.
What this means for you: I treat 31.5 million tonnes as a ceiling on the family, not as supply. I start my file from what remains after the mills have bought the same fibre.
What counts as a woody residue
The RSB scope is narrow on purpose. It counts only wood from plantations, including woody material and residues removed from trees, orchards or plantations of domesticated species such as Eucalyptus, generated by re-planting, pruning, plot cleaning and removing specific trees. Anything outside that definition sits outside the number I just quoted. Fastmarkets adds the practical inventory a buyer actually scans: forestry residues, sawmill and other wood-processing byproducts, and low-value fibre unsuitable for higher-value markets. The second list is wider than the first, and the gap between them is where a study gets into trouble. This matters for my file because the sustainability evidence I show has to match the scope the certifier applies. I set that scope before I quote any tonnage: the SAF sustainability criteria decide which trees and which operations I am allowed to count at all.
What this means for you: I write the residue definition into the study first and let the tonnage follow it, because a number built on a wider definition than the certification scope will not survive diligence.
The conversion route decides whether the tonne is worth anything
Gasification (heating the wood with limited oxygen to produce syngas) followed by FT rebuilds that syngas into hydrocarbons upgraded to jet fuel. Preprocessing, gasification, FT synthesis and fuel upgrading sit in a single facility that requires substantial capital, dependable feedstock supply and consistently high plant utilisation. In 2009 ASTM International added FT synthetic paraffinic kerosene (FT-SPK) to Annex A1 of ASTM D7566. Therefore, FT-SPK from woody biomass can qualify regardless of the feedstock used to produce the syngas. Pyrolysis-to-jet is less commercially mature because it has not yet qualified under ASTM D7566 and must still demonstrate reliable production of specification-compliant SAF at commercially viable yields. Buyers have not established supply chains for forest and agricultural residues. Also, the low energy density of forest residues limits the economical transportation distance from a refinery.
Therefore, a project may need to densify loose residues into pellets or bio-oils. I read the maturity picture in the Fischer-Tropsch pathway.
What this means for you: I quote a tonnage only once I qualify the route and solve transport. An unqualified pathway leaves the residue at the roadside.
What the cost side looks like
Lignocellulosic SAF is less sensitive to feedstock costs and more reliant on CAPEX. IRENA puts an FT plant in Malaysia at an approach to USD 9.5 per litre of SAF produced. Meanwhile, HEFA plants have the lowest capital intensity, the one in Indonesia lowest at USD 0.7 per litre, with all three countries assuming a nameplate capacity of 2,000 tonnes of feedstock per day. FT remains uncompetitive until the industry reaches nth plant status, which IRENA calls a major barrier in Southeast Asia. Also, Indonesia’s rice husk FT route reaches USD 1.2 per litre only when the industry earns that status. Logistics costs remain the largest hurdle, given one-way collection, transport and storage of bulk biomass with low energy density. The sustainable aviation fuel price sits on top of both lines, and the gap does not close by itself.
What this means for you: I price the tonne against the capital it unlocks rather than against a jet fuel benchmark, because the residue is cheap and the plant is not.
What Southeast Asia specifically holds
Country by country the RSB records Indonesia 13.1 million tonnes a year, Malaysia 8.2, Vietnam 5.3, Thailand 3.7 and Myanmar 1.3 of forest and wood industry residues, out of 31.5 regionally, all in dry mass. IRENA reads the same region through residues and wastes. Indonesia leads with 9.3 million tonnes a year of SAF potential from agricultural residues. Of that potential, 7.5 million tonnes a year comes from plantation residues. Malaysia sits at 1.6 million tonnes a year because other uses already take a high share of its residues. The same study notes that relying solely on residues and wastes to meet SAF demand would be risky. Existing utilisation and future competition from shipping fuels and biochar both cut the available volume. Logistics and conversion costs add the same pressure. I set that against the Southeast Asia SAF picture.
What this means for you: I read Indonesia as the country where a plantation residue balance is most likely to exist, and Malaysia as the country where that balance has largely already been taken.
Three ways the wood assumption fails
First, competitors already hold contracts for that fibre. Fastmarkets records that homebuilding, repair and remodeling account for about 70% of softwood lumber demand. That demand supports sawlog harvesting and sawmill residuals. Pulp and paper mills, bioenergy facilities and wood pellet producers compete for the same local feedstock. Feedstock prices could therefore face upward pressure. Pulp mill closures may weaken harvesting activity, transportation networks and processing infrastructure, increasing supply-chain risk. Second, the project record: in 2023 the gasification/FT approach lost Red Rock Biofuels before construction finished. The plant planned to use forest residues. Third, the headline overstatement: McKinsey counted about 580 million tonnes of forestry residues a year. That estimate ignores competition for feedstocks, and analysts treat it as too high. The ICCT puts lignocellulosic feedstocks at about 2.1% of 2030 jet fuel demand under an optimistic deployment rate.
What this means for you: I assume other users hold the national statistic until my own count proves otherwise. I structure the file so that one upstream closure does not stop it.
The order I would run the work in
I start from the catchment, not from the national statistic. I work inside a collection radius, the distance within which I can gather residues at a workable cost. There I confirm what the forest products industry already sells. I confirm the residue definition and the certification scope I am claiming. The next check is the densification step, if transport distance is the binding constraint. The conversion route has to qualify. Only then I price the tonne against the capital it unlocks. Two anchors hold the sequence. The first is the RSB scope, limited to plantation wood and residues from re-planting, pruning, plot cleaning and removing specific trees. The second is Fastmarkets’ four tests for commercially accessible volume: regional forest conditions, competing demand, collection and transport costs, and reliable supply over the life of the project. My supply chain and infrastructure work sits on those four tests.
What this means for you: I run the four tests in order and stop at the first failure, because a residue that fails one of them is not available at any price.
How I would run this if it were my file
I put my own catchment balance against the published numbers before I take anything to committee. The regional figure is 31.5 million tonnes a year for 2.8 million tonnes of SAF. Indonesia holds 13.1 and Malaysia 8.2 million tonnes of the same family. I check the ASTM FT-SPK qualification from 2009 and the capital gap between USD 9.5 and USD 0.7 per litre. The Red Rock closure reminds me that a forest residue project can stop before it starts. Fastmarkets records that across the US South many SAF projects sit where timber resources and forest-product supply chains exist. That is the siting logic I copy. If those lines hold, I take the file forward with a supply position that names the mills, the radius, the densification step and the qualified route. If one of them does not hold, I rewrite the feedstock section rather than the headline.
What this means for you: I would rather present a smaller number I can defend than a regional statistic that dissolves the moment a pellet producer bids for the same residue.
Sources
- RSB, September 2024.
- Fastmarkets, 16 November 2026.
- IEA Bioenergy Task 39, January 2024.
- ICAO, 2025.
- ICCT, March 2021.
- IATA, September 2025.
- IRENA, December 2024.
Frequently asked questions
How much woody biomass is actually available for SAF in Southeast Asia?
The RSB records 31.5 million tonnes a year of forest and wood industry residues in dry mass, 8.4% of the regional total, split as Indonesia 13.1, Malaysia 8.2, Vietnam 5.3, Thailand 3.7 and Myanmar 1.3, converting to 2.8 million tonnes of SAF through FT. Those are literature figures that do not net out competing demand, and Fastmarkets notes that the resources are geographically dispersed and already serve pulp and paper, wood pellet and bioenergy markets, so an aggregate estimate may not represent what is commercially accessible.
Can woody biomass become SAF through pyrolysis today?
Not yet. Gasification with FT has been qualified under ASTM D7566 Annex A1 since 2009, so FT-SPK from woody syngas can be produced to specification, while pyrolysis-to-jet has not qualified under ASTM D7566 and must still demonstrate reliable production of specification-compliant SAF at commercially viable yields. Pyrolysis units can sit near the feedstock, which reduces raw biomass transport, but the oxygen-rich, acidic and unstable bio-oil requires specialised handling and extensive hydrogen-based processing.
Is woody biomass cheaper than used cooking oil?
The comparison runs through capital rather than feedstock price. Lignocellulosic SAF is less sensitive to feedstock costs and more reliant on CAPEX, so an FT plant in Malaysia approaches USD 9.5 per litre of SAF produced against USD 0.7 per litre for the lowest HEFA plant in Indonesia, both on a nameplate of 2,000 tonnes of feedstock per day. Logistics for bulk low-density biomass remain the largest hurdle, and FT stays uncompetitive until nth plant status is achieved.
What should my feasibility study check first?
Three checks in order: the competing demand inside the collection radius, the residue definition and certification scope, and whether densification and a qualified conversion route are in the plan. Fastmarkets makes the first test explicit through regional forest conditions, competing demand, collection and transport costs, and reliable supply over the life of the project. The RSB scope limits the count to plantation wood and residues from re-planting, pruning and plot cleaning, so my evidence has to match that definition before any tonnage is quoted.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
When the catchment balance holds and the route is qualified, the next question is who funds the first plant. Through investor introductions, I place a documented feedstock position in front of the counterparties who can act on it, with the balance, the radius and the capital gap already set out.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.