I get one question: can an airline commit to my project? Also, In the near term an airline buys on a conventional aviation fuel index plus a SAF premium, the gap between production cost and market price, or on a SAF price index. Specifically, In the long term it buys through an offtake agreement with a producer covering supply in 3 to 5 years for a tenure of 5 to 10 years. Meanwhile, airlines do not typically forward-hedge their fuel requirements beyond two to three years. Furthermore, This means fixing today’s price for later delivery, which is why a long-term fixed-price commitment is hard to secure. Also, I set out below how airlines buy SAF on each route, and what a lender asks of the signature, from how to secure SAF offtake agreements.

Those two rhythms sit on different foundations for sustainable aviation fuel. Specifically, One mirrors the way the airline already buys jet fuel. In addition, The other is a financing instrument that a producer needs before it can build. Specifically, Everything below follows from that split.

In short

  • Two routes: near-term index plus premium, or long-term offtake covering 3 to 5 years of supply for a 5 to 10 year tenure.
  • Near-term pricing: a CAF index or a SAF index from a price reporting agency, cheap to start and carrying a higher premium.
  • Invoice: production cost plus market premium, logistics, certification, transaction costs and supply-chain markups.
  • Mandates: ReFuelEU Aviation pushes the price up to five times conventional jet fuel without guarantee of supply.
  • Ceiling: hedging stops at two to three years, leaving an uncontracted tail against 8 to 14 years of debt.
Facebook
Twitter
LinkedIn

In this article

Two routes, one buyer

IATA publishes contract timelines and pricing options that run from near-term one-off or annual contracts to long-term offtake agreements, plus a strategic commitment in the form of an equity stake with unspecified pricing (IATA, 12 May 2024).

Meanwhile, Near-term pricing mirrors conventional aviation fuel: a CAF price index with a SAF premium applied, or a SAF price index. Long-term offtake agreements are typically negotiated between an airline and a SAF producer looking to invest in a new or additional production facility, and they refer to supply further in the future, for example in 3 to 5 years, for a longer tenure, for example 5 to 10 years (IATA). Instead, The equity leg carries no price at all, because the buyer is buying exposure rather than tonnes. Meanwhile, I put that split on top of the model: an airline buys in two rhythms. Also, my project picks the one it sells into.

What this means for you: I ask which rhythm the airline in front of me is buying on before I model a single revenue line.

The near-term route: index plus premium

The CAF price index and the SAF price index come from a price reporting agency, meaning a firm that publishes price assessments. Such as Argus Media or S&P Global Commodity Insights, for specific trading markets, for example the US West Coast, Northwest Europe and Singapore (IATA, 12 May 2024). Moreover, Argus FOB Singapore and Platts CIF ARA are examples of assessments used as the base, to which logistics costs, fees. Also, a supplier’s margin are added. The advantage of using a CAF index as the base price is that it lets an airline extend its ongoing fuel price hedging practices also to SAF. Meanwhile, the SAF premium is often higher than under pricing options available for long-term offtake agreements (IATA).

In practice, near-term buying is cheap to start and expensive to stay in, and the contract structures that support it are set out under SAF heads of terms and binding offtake.

What this means for you: I use the near-term route to cover the early years of fuel spend, and I never present it to a lender as project revenue.

What lands on the invoice

The price that airlines pay for SAF, in addition to the production costs, incorporates add-on costs such as a market premium, logistics, certification, transaction-related costs, and markups throughout the supply chain (IATA, 12 May 2024). Therefore, In 2024, the difference between production cost and market prices, the market premium, in Europe reached as high as around 1000 USD/tonne of HEFA SAF. Meanwhile, SAF prices fluctuated throughout the year and the market lacks transparency for deals and prices paid (IATA). Instead, At current price levels, the SAF premium translates into an additional USD 3.6 billion in fuel costs for the industry in 2025. Also, SAF prices exceed fossil-based jet fuel by a factor of two, and by up to a factor of five in mandated markets (IATA, 9 December 2025). For example, The full stack behind that number sits on sustainable aviation fuel price.

What this means for you: the premium is the gap between what the fuel costs to produce and what the market charges. Also, it is the line the airline watches when it decides how long to commit.

The mandate changes the buying decision

In Europe, under ReFuelEU Aviation, airlines pay up to five times more than the price of conventional jet fuel and double the market price of SAF, without guarantee of supply or consistent documentation (IATA, 9 December 2025). Consequently, The UK SAF mandate has triggered price spikes, leaving airlines to absorb the burden (IATA, 9 December 2025). Moreover, Supply is the other half. Installed SAF capacity globally reached 4.4 Mt by end 2024, with 6.9 Mt of expansion planned. Also, an additional 5.8 Mt would need final investment decisions by 2026 to meet 2030 demand (World Economic Forum, February 2025). Demand for global SAF should reach 17 million tonnes per annum by 2030, approximately 4 to 5 percent of total jet fuel consumption (World Economic Forum, February 2025). I track how that obligation lands on the contract in ReFuelEU offtake.

What this means for you: the mandate converts a commercial choice into an obligation. Therefore, the buyer in front of me is not the same buyer once the obligation applies.

Why the commitment stops at two to three years

Airlines, the end-users of SAF, do not typically forward-hedge their fuel requirements beyond two to three years. This makes a long-term, fixed-price offtake agreement that project finance lenders typically require difficult to secure for a SAF project (Dentons, 15 April 2025). Even a 10 year airline purchase commitment would leave a large, uncontracted tail for a long-term debt tenor of perhaps 20 to 25 years (Dentons). The offtake contract needs to cover the tenure of debt financing, for example 8 to 14 years, and investors often require at least 70 to 80 percent of annual capacity to be covered by offtake agreements (World Economic Forum, February 2025).

An uncontracted tail is the slice of future production that no buyer has committed to take, and it is the reason an airline signature alone rarely sizes a loan; mandates raise volume, they do not raise tenor, and that distinction is the one I track in SAF policy risk.

What this means for you: I size debt against the tail that remains after the two to three year window closes, not against the headline offtake.

What a lender asks of the airline signature

Airline credit ratings are on average lower, so spreading default risk across several parties matters. Also, some lenders require 100 percent of the SAF produced to have reliable offtake covering the full loan tenor (World Economic Forum, February 2025). Lenders scrutinize offtake agreements because a project that is not yet built has no existing cash flow. Only financial models, and the contract is what validates them (Global Trade Funding, 13 March 2022). A practical credit review asks who the actual obligor is, what support exists in the form of a guarantee, letter of credit, security package or reserve account, what happens on downgrade or distress, and whether revenue can be captured (Mayo Law, consulted 15 November 2026).

To be financeable, an offtake agreement must provide stable, predictable revenue over the life of the debt, involve a creditworthy offtaker, mitigate the project’s material operating and market risks, and avoid provisions blocking lender remedies on default (Bracewell, 10 September 2026).

What this means for you: I apply those four tests to the airline signature, through the lens of bankability, before I read the price, because a weak obligor makes any price irrelevant.

Where airline buying fails the project

Offtake contracts are often non-binding memoranda of understanding, and contractually binding agreements are needed for a project to reach FID (World Economic Forum, February 2025). Lenders scrutinize offtake agreements because a project that is not yet built has no existing cash flow. Only financial models, and the contract is what validates them (Global Trade Funding, 13 March 2022). Lenders will be reluctant to take significant merchant exposure for a new sector, and any limited merchant offtake strategy will need to be supported by detailed marketing analysis and considered implications for debt-sizing (Dentons, 15 April 2025). Clauses that allow the seller to renegotiate pricing mid-contract or even yearly could be introduced, and if uncapped this potential for price adjustment can add complexity to an airline’s fuel budget and another layer of risk to SAF supply (IATA, 12 May 2024).

What this means for you: I treat a letter of intent as a negotiating position. Also, a price that can be re-opened every year is not offtake until the binding document is signed.

How I would run this if it were my file

I write the airline question as three lines: which route the airline is buying on, what tenor it can sign, and who stands behind the signature. I start from the published tenor on the long-term route, 3 to 5 years of supply for a 5 to 10 year tenure (IATA, 12 May 2024), set it against the 8 to 14 years of debt the offtake must cover (World Economic Forum, February 2025), and size the gap. Then I test the credit side: the obligor. The support package and what happens on downgrade (Mayo Law, consulted 15 November 2026). Then I decide whether the file needs a second offtaker or an intermediary of sufficient creditworthiness to close the gap (Dentons, 15 April 2025). My airline is then one row of three answers, not a logo on a slide.

What this means for you: I bring the developer a written answer on route, tenor and obligor. Also, only then do I discuss price.

Sources

Frequently asked questions

In the near term through a one-off or annual contract priced on a conventional aviation fuel index plus a SAF premium, or on a SAF price index published by a price reporting agency such as Argus Media or S&P Global Commodity Insights (IATA, 12 May 2024). In the long term through an offtake agreement with a producer covering supply in 3 to 5 years and a tenure of 5 to 10 years (IATA, 12 May 2024). Beyond those two routes, an airline can take a strategic commitment in the form of an equity stake, with pricing left unspecified (IATA, 12 May 2024).

Airlines do not typically forward-hedge their fuel requirements beyond two to three years, and even a 10 year airline purchase commitment would leave a large uncontracted tail for a long-term debt tenor of perhaps 20 to 25 years (Dentons, 15 April 2025). The offtake contract needs to cover the tenure of debt financing, for example 8 to 14 years, while investors often require at least 70 to 80 percent of annual capacity to be covered by offtake agreements (World Economic Forum, February 2025).

Airlines buy saf: what a mandate changes

The mandate makes the volume an obligation rather than a choice. Under ReFuelEU Aviation airlines pay up to five times more than the price of conventional jet fuel and double the market price of SAF, without guarantee of supply or consistent documentation (IATA, 9 December 2025), and the UK SAF mandate has triggered price spikes, leaving airlines to absorb the burden (IATA, 9 December 2025).

Stable, predictable revenue over the life of the debt, a creditworthy offtaker, mitigated operating and market risks, and no provision blocking lender remedies (Bracewell, 10 September 2026), plus the obligor test on who actually owes and what support exists in the form of a guarantee, letter of credit, security package or reserve account (Mayo Law, consulted 15 November 2026). Some lenders require 100 percent of the SAF produced to have reliable offtake covering the full loan tenor (World Economic Forum, February 2025).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are a developer at pre-FID stage and you need to know whether your offtake file can carry debt, I run that read with you, and where the credit side needs work I use investor introductions to put the right counterparties in the room.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia