e-SAF Explained: What Power-to-Liquid Asks of a Project
10 min read · Nov 2, 2026 · By Alex
Sustainable aviation fuel made from electricity, a route called power-to-liquid (PtL), is easy to describe and hard to price. It starts with green hydrogen. Green hydrogen comes from electrolysis, which splits water using renewable electricity. It also needs captured carbon dioxide. Fischer-Tropsch synthesis joins the two into liquid hydrocarbons that include a jet fraction. ASTM has certified e-SAF since 2009 for blends of up to 50 percent. However, it can cost up to 12 times conventional jet fuel. Also, e-fuels might only begin to scale from the mid-2030s.
That price gap is the whole question for an investor looking at a Southeast Asian project at feasibility stage. I read the route as a contract problem before a chemistry problem. The power, the carbon source and the buyer decide whether the model closes. Everything below serves that decision.
In short
- Fuel: Renewable electricity and captured CO2, converted by Fischer-Tropsch synthesis into a drop-in jet fuel.
- Approval: ASTM certified since 2009 for blends of up to 50 percent with conventional jet fuel.
- Cost: Potentially up to 12 times conventional jet fuel, while SAF in general already trades at a factor of two.
- Timing: E-fuels might only begin to scale and complement advanced biofuels from the mid-2030s.
- Capital: The industry may require between 19 billion and 45 billion US dollars of capital expenditure by 2030.
In this article
The short answer: an approved fuel with an unapproved cost
The route is power-to-liquid. Renewable energy electrolyses water to produce hydrogen. Also, refiners combine that green hydrogen with green or waste carbon sources, CO or CO2. Processes such as Fischer-Tropsch synthesis then produce hydrocarbons that include a jet fraction. The CO or CO2 can also come from direct air capture. This means removing carbon dioxide from ambient air and using it as feedstock. These processes do not rely on waste resources or non-food crops. In theory, that leaves an unlimited supply of feedstock available. The jet fraction is a drop-in fuel, so engines, aircraft and airport delivery systems do not change. ASTM has certified power-to-liquids since 2009 for 50 percent blends. The cost side is the open question. e-SAF faces a much higher cost base, potentially up to 12 times that of conventional jet fuel.
What this means for you: I would keep approval and economics on separate lines in my model. The specification is clear, and the price is not. Therefore, certification on its own tells me nothing about the return I am underwriting.
What the electricity has to do
Producers make e-fuels with electricity. When that power comes from wind or solar, the fuel is less carbon intensive. I use carbon intensity to mean life cycle emissions per unit of energy. That is the figure a buyer or a regulator scores. That renewable power does two jobs. It powers the capture of carbon dioxide, and it powers the production of green hydrogen. Achieving scale in e-fuels will require greatly increased global production of renewable electricity. That power must run carbon dioxide capture and produce the hydrogen for PtL fuels. In addition, it needs a matching increase in the number and capacity of carbon capture facilities. Cheap CO2 capture is critical. So is the availability of low-cost renewable power to produce hydrogen. The process route itself is set out in Power-to-Liquid Explained.
What this means for you: I would secure the power position before I price the plant. If the electricity is costly or short dated, the operating cost moves against me. So does the carbon intensity of the molecule. No buyer contract repairs that afterwards.
What the carbon source is allowed to be
E-SAF typically comes from carbon sources such as industrial point source waste gases or, in the future, direct air-captured carbon. Producers combine that carbon with green hydrogen from renewable energy-powered electrolyzers. Renewable energy powers the capture of carbon dioxide either directly from the atmosphere or from an emission source. The regulatory question sits behind that choice. ICAO lists the conversion processes that already carry CORSIA default life cycle emission values, namely FT, HEFA, SIP and ATJ. That gap makes power-to-liquid a maturity question before it is a procurement question. The reason is that power-to-liquid sits at a lower technology readiness level. Components such as the reverse water gas shift reaction still need full resolution. The work that follows is set at first-of-a-kind risk.
What this means for you: I would tag every tonne of carbon in my model. Each tonne carries the status of its source. Industrial waste gas is a procurement line I can price now. Meanwhile, direct air capture is a future line that still needs capacity nobody has built.
What the fuel has to clear in price
SAF production in 2025 reached 1.9 million tonnes, only 0.6 percent of total jet fuel consumption. Also, forecasters project 2.4 million tonnes and 0.8 percent for 2026. SAF prices exceed fossil-based jet fuel by a factor of two. In mandated markets the factor reaches five. At current price levels, that premium adds USD 3.6 billion in fuel costs for the industry in 2025. e-SAF faces a much higher cost base, potentially up to 12 times that of conventional jet fuel. Demand for global SAF should reach 17 million tonnes per annum by 2030. That is approximately 4 to 5 percent of total jet fuel consumption. In addition, the industry may require between 19 billion and 45 billion US dollars of capital expenditure by 2030. The spread is set out at Sustainable Aviation Fuel Price.
What this means for you: I would test my selling price against both ranges. Those are the bio-based premium and the e-SAF premium. Then I would rerun the model if either moves. A margin that works at two times does not survive twelve.
Where the route sits against the approved pathways
ASTM International currently approves 12 sustainable aviation fuel production pathways, including three for co-processing. Refiners blend approved routes with conventional jet fuel, up to 50 percent. The reason is that sulphur and other less desirable components let seals swell in engines and prevent fuel leaks. Power-to-liquids are ASTM certified since 2009 for 50 percent blends. The majority of SAF today is HEFA-SPK. More than 95 percent of biofuel flights to date have used HEFA-SPK. Also, nine pathways hold ASTM certification, and only that one is technically mature and commercialised. Power-to-liquid sits at a lower technology readiness level than gasification with Fischer-Tropsch and alcohol-to-jet. These are nearing commercial status. Meanwhile, the lipid-derived HEFA pathway will keep supplying the majority of SAF volumes up to 2030.
What this means for you: I would benchmark against HEFA first, not against the certification list. Approval tells me the fuel can fly. It tells me nothing about how my project competes on cost with the pathway that supplies most of the volume.
What the route implies for cost and carbon next to the bio routes
Power-to-liquid carries the highest capital requirements of the four families. The reason is that it relies on renewable electricity, electrolysis and CO2 capture. By contrast, HEFA is the most mature and cost-effective pathway, and it faces feedstock constraints. Gasification-Fischer-Tropsch is capital-intensive and needs solid feedstock handling, and alcohol-to-jet carries higher capital costs from on-site ethanol processing. Power-to-liquid will have to contend with multiple challenges over longer timelines than advanced biofuels. Also, e-fuels might only begin to scale and complement advanced biofuels from the mid-2030s. The long-run picture is more generous. In IRENA’s 1.5C scenario, synthetic kerosene would reach up to 23 percent of fuel use by 2050. That means almost 100 billion liters. In addition, biojet and synthetic kerosene could become cost-competitive with jet kerosene by 2050. The financing framing is at e-SAF Project Finance.
What this means for you: I would carry the higher capital number in the base case. Also, I would treat the 2050 cost-competitive view as the upside case. The two dates are far apart, and my debt matures long before either.
The order I would run the e-SAF file in
I would fix the power contract first. The reason is that low-cost renewable power decides both the hydrogen cost and the carbon intensity of the molecule. Next comes the carbon source: industrial point source waste gases today, direct air capture once the capacity exists. Then I confirm the approval and blend position, ASTM certification since 2009 for 50 percent blends. I also check what the lifecycle claim can rest on. ICAO publishes default life cycle emission values only for FT, HEFA, SIP and ATJ. Then I write the offtake agreement, a binding purchase contract with a buyer, to cover the debt tenor. Investors often require offtake cover for at least 70 to 80 percent of annual capacity. Also, the contract needs to cover the tenure of debt financing, for example 8 to 14 years.
Last come the five phases of the SAF refinery lifecycle: conceptualization, pre-feasibility, final investment decision (FID), construction and commissioning. I sequence them at How to Finance a SAF Project.
What this means for you: I would run these checks in that order. I would stop at the first one that fails. A strong offtake does not repair a weak power line, and the reverse is equally true.
How I would run this if it were my file
I would treat the demand signal as the reason to start now. ReFuelEU Aviation has targeted aggressive blending mandates with a specific sub-mandate for e-fuels. Also, the long-term certainty of mandates should reduce risk for investors while creating a level playing field for all airlines. However, that policy did not include incentives that would bridge the price gap between conventional jet fuel and SAF. I would keep the ramp honest as well. Aviation will require thousands of new or converted renewable fuel production facilities by 2050. Also, e-fuels might only begin to scale and complement advanced biofuels from the mid-2030s. I would check the capital ask against the published range of 19 billion to 45 billion US dollars by 2030.
I would price the position with the same caution the market shows. The reason is that investors point at the stability of regulation, including levels of blending mandates and subsidies. In addition, they weigh feedstock cost, conversion efficiency and capital expenditure.
What this means for you: I would start the file now. Also, I would underwrite it for the period when e-fuels actually scale, not for the mandate that opens sooner. Legislation writes the demand; the supply timetable and the price gap are still open.
Sources
- ICAO, 16 November 2026
- ICAO Environmental Report with IRENA, 2022
- IATA SAF Handbook, May 2024
- IEA Bioenergy Task 39, January 2024
- World Economic Forum with Kearney, February 2025
- IATA, 9 December 2025
Frequently asked questions
What is e-SAF made from?
Renewable electricity powers electrolysis to produce green hydrogen, and that hydrogen is combined with captured CO2 from industrial point source waste gases or, in the future, direct air capture. The synthetic gas is then converted into SAF via the Fischer-Tropsch process. Because the route does not depend on waste resources or non-food crops, the theoretical feedstock supply is unlimited.
What blend limit does e-SAF have?
Power-to-liquids have been ASTM certified since 2009 for 50 percent blends, and SAF in general must be blended with conventional jet fuel up to 50 percent because some components of conventional jet fuel, such as sulphur, allow seals to swell in engines and prevent fuel leaks. Newer engines do not have this concern, and higher blend limits are likely to be approved as synthetic aromatic compounds are approved.
Why does e-SAF cost so much more than bio-based SAF?
Power-to-liquid has the highest capital requirements of the four families because it relies on renewable electricity, electrolysis and CO2 capture, while HEFA is the most mature and cost-effective pathway. The result is a cost base for e-SAF potentially up to 12 times that of conventional jet fuel, against a factor of two for SAF in general.
When will e-SAF be available at scale in Southeast Asia?
E-fuels might only begin to scale and complement advanced biofuels from the mid-2030s, and reaching that scale requires greatly increased global production of renewable electricity plus a scale-up in the number and capacity of carbon capture facilities. Regional roadmaps already exist: Indonesia released a national SAF road map in September 2024 and Malaysia launched its Aviation Decarbonisation Blueprint the same month.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you are at feasibility stage and want the file sequenced around power, carbon, approval and offtake before the model hardens, the place to start is my project finance services page, where I set out how I work on projects of this type. Tell me where the file stands today and I will tell you which of the six checks is the one to run first.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.