We Connect Asia

SAF

CORSIA Eligible Fuels: What Qualifies, Who Certifies It, and When You Can Claim It

10 min read  ·  Nov 2, 2026  ·  By Alex

corsia eligible fuels

A fuel counts when it clears the ICAO sustainability criteria: net greenhouse gas reductions of at least 10% against baseline life-cycle values for aviation fuel, when its producer is certified by a sustainability certification scheme, an independent body that audits fuel producers, approved by the ICAO Council, and when the operator claims the reduction with default or actual life-cycle values during the compliance period, a three-year window, in which the fuel was blended. That is because the deduction is applied only at the end of that period. CORSIA accepts two categories of fuel, both defined in Annex 16 Volume IV. I separate the technical test from the accounting test, because they fail in different ways. What follows are the checks that decide whether CORSIA eligible fuels become a deduction an operator can defend. In addition, they start inside CORSIA itself.

This page is for a developer or a lender who needs a yes or a no before the model is built. I keep published requirements separate from commercial assumptions and I name the source of every figure. Meeting the criteria is no promise of a deduction. That is because the claim still depends on the compliance period and verified reporting.

In short

  • Two fuels: CORSIA sustainable aviation fuel and CORSIA lower carbon aviation fuel, both defined in Annex 16 Volume IV.
  • Threshold: Net greenhouse gas reductions of at least 10% against baseline life-cycle values for aviation fuel.
  • Certification: ICAO approves certification schemes, and those schemes certify the fuel producers.
  • Claim: Default or actual life-cycle values, reported and verified under Annex 16 Volume IV.
  • Timing: The deduction lands only at the end of the compliance period of blending.
Facebook
Twitter
LinkedIn

In this article

The two fuels the scheme accepts

CORSIA allows aircraft operators to reduce their offsetting requirements through CORSIA eligible fuels, and ICAO divides them into two groups: CORSIA sustainable aviation fuels and CORSIA lower carbon aviation fuels. The definitions live in Annex 16 Volume IV. A CORSIA eligible fuel is a fuel an operator may use to reduce its offsetting requirements. Also, a CORSIA lower carbon aviation fuel, in plain words, is a fossil-based aviation fuel that meets the CORSIA sustainability criteria. A CORSIA sustainable aviation fuel is a renewable or waste-derived aviation fuel that meets those same criteria. One caveat belongs here rather than later: lower carbon aviation fuels that meet the criteria are not considered sustainable fuels. ICAO also shows operators where the rules sit: sections 2.2.4, 2.3.3, 2.4.3 and 3.3 of Annex 16 Volume IV cover monitoring of claims, reporting, verification and emissions reductions.

What this means for you: I identify the fuel category first, because the category decides which criteria chapter and which evidence the verifier asks for at the end of the period.

The threshold a fuel has to clear

Criterion 1.1 reads the same in every chapter of the criteria document. The fuel will achieve net greenhouse gas emissions reductions of at least 10% compared to the baseline life-cycle emissions values for aviation fuel on a life-cycle basis. A life-cycle emissions value is the greenhouse gas total for a fuel from production to combustion, per unit of energy. The themes then go past the threshold. For SAF they cover greenhouse gas emissions, carbon stock, permanence, water, soil, air and conservation; for lower carbon aviation fuels they list fourteen themes including land rights.

Water use rights, local development and food security. The carbon stock rule bars biomass from land or aquatic systems converted after 1 January 2008, and where land use conversion occurs the direct land use change value replaces the default induced value when it is higher. EASA states the same threshold for operators: at least 10% less CO2e on a life-cycle basis against a reference fossil value of 89.1 gCO2e/MJ.

What this means for you: I confirm the criteria chapter and the land conversion date before I model anything. In addition, I read the published sustainability criteria in full.

From a certified batch to a claim

Eligible fuels must come from producers certified by a sustainability certification scheme approved by the ICAO Council. In addition, ICAO publishes certified batches and economic operators on its CORSIA certified fuels website. The first two themes rest on independent attestation by those approved schemes. In addition, a producer can make batches for 365 calendar days after certification before it must be re-certified against the criteria in force at that moment. I keep one distinction exact: ICAO approves the certification schemes, it does not certify the fuels. The operator claims the reduction with a published default value, the figure ICAO assigns to a fuel pathway, unless a producer shows a lower actual value or no default exists.

Claims follow the monitoring, reporting and verification rules of Annex 16 Volume IV, and IATA records that governments should support global SAF book. In addition, claim systems consistent with the purchase-based claiming approach allowed under CORSIA.

What this means for you: I ask for the certificate, the expiry date of that certification and the blend date together. That is because a claim without all three will not survive verification.

Why national mandates change the commercial question

National mandates decide who ends up buying the volume. IATA’s position is that any SAF mandate should apply only where the necessary market conditions, production capacity, infrastructure readiness. In addition, supportive policy measures are sufficiently in place, so that a mandate does not create supply constraints or cost burdens the sector cannot carry. IATA also lists what governments can put behind it: production incentives, grants, loan guarantees. Supportive regulatory frameworks, research and innovation support, and policies that give access to feedstocks and infrastructure. IATA adds that sequencing matters, because poorly ordered policies and investments create supply bottlenecks, infrastructure mismatches and unintended market distortions. My reading for a developer is plain. Eligibility is a technical passport, while a mandate is demand, and a fuel that proves eligibility still needs a buyer in the jurisdiction that obliges its use.

What this means for you: I map each national SAF mandate against my own eligibility evidence before I sign, because the certificate proves the fuel and the mandate proves the buyer.

What the fuel is underneath the paperwork

Underneath the paperwork sits an ordinary fuel market. SAF still represents less than 1% of global aviation fuel use and costs several times more than conventional aviation fuel. That is because feedstocks are dearer, production technologies are still developing, physical. In addition, market infrastructure is thin, and upfront investment needs are heavy. Most production uses waste and residue feedstocks through the HEFA pathway, typically delivering lifecycle reductions of around 80% against conventional aviation fuel, while emerging technologies can push the figure above 90%. Volumes stay modest: around 1.9 million tonnes in 2025 at about 0.6% of global jet fuel, and around 2.4 million tonnes in 2026 at about 0.8%.

The operator compares the fuel against 89 gCO2e/MJ for the usual jet fuels and 95 gCO2e/MJ for AvGas, and the deduction follows the life-cycle value of the fuel used. Therefore, the sustainable aviation fuel case has to stand on physical volumes as well as certificates.

What this means for you. I size the volume line from published production figures first, then I check whether the certificate. In addition, the claim can carry that volume through the whole period.

How eligibility sits next to the rest of compliance

Eligibility is one lever inside a route-based scheme. A route is covered when both the State of departure and the State of destination participate. In addition, the rules apply to every operator on it. The pilot phase ran from 2021 to 2023, the first phase runs from 2024 to 2026 on a voluntary basis. In addition, the second phase from 2027 to 2035 applies to all ICAO Contracting States with exemptions; volunteering states rose from 88 in 2021 to 130 in 2026. The baseline is 85% of 2019 emissions for 2024 to 2035, and operators above 10,000 tonnes of CO2 on international flights must monitor, verify and report from 2019.

I watch the European side too: IATA notes that the European Commission announced on 17 July 2026 a review of the EU Emissions Trading System with tangible implications for compliance costs because of its interaction with CORSIA. That is where the EU ETS enters the file.

What this means for you. The risk I watch is a fuel that qualifies technically but is claimed in the wrong period. Against the wrong route set, or without the certificate the verifier will ask for.

What I would ask before signing

I ask four questions in writing. First, which chapter of the criteria document applies to my batches, the one for fuel produced before 1 January 2024 or the one for fuel produced on or after it. Second, which approved scheme certifies the producer, and when the 365 day certification window runs out. Third, which default value will be used, from the default values document now in its ninth edition of November 2026, and whether actual life-cycle values will be proposed instead, with the evidence behind them. Fourth, which compliance period the claim lands in, because the deduction can only be claimed for the period during which the fuel was blended. I keep the two reference fossil values with their sources attached, and I never merge them into a single figure.

What this means for you: I put those four answers in writing before signature. That is because the verifier will ask the same questions later.

How I would model it if it were my file

I keep three lines separate and I date every entry. The eligibility line carries the 10% threshold, the certification status of the producer, and the expiry date of that certification. Also, the accounting line carries the reference fossil value used, the default or actual life-cycle value of the fuel. In addition, the compliance period the blend falls in. The volume line carries the tonnes actually blended and the deduction they translate into at the end of the period. I run the model twice, once with default values. In addition, once with actual values, and I show the difference to the lender in one line. My last row is the verified claim, because that is the only row an administrator accepts.<\/p>

What this means for you: I treat eligibility, certification. In addition, accounting as three dated lines in one file, and I book nothing until the row is verified.<\/p>

Sources<\/strong><\/p>\n

Frequently asked questions

It must be a CORSIA sustainable aviation fuel or a CORSIA lower carbon aviation fuel that meets the CORSIA sustainability criteria, produced by a fuel producer certified by a sustainability certification scheme approved by the ICAO Council (ICAO). Both categories are defined in Annex 16 Volume IV, and lower carbon aviation fuels that meet the criteria are not considered sustainable fuels. ICAO publishes information on certified fuel batches and economic operators on its CORSIA certified fuels website, which is where I check a batch before I count it.

At least a 10% net reduction in greenhouse gas emissions on a life-cycle basis against baseline life-cycle emissions values for aviation fuel, together with the land, water, soil, air and conservation themes set out in the criteria document (ICAO, June 2025). The themes for lower carbon aviation fuels run to fourteen, including land rights, water use rights, local and social development and food security. EASA states the operator’s side of the same threshold: at least 10% less CO2e on a life-cycle basis against a reference fossil value of 89.1 gCO2e/MJ.

The schemes certify the producers, and ICAO approves the schemes: Annex 16 Volume IV references five ICAO documents including the document of approved sustainability certification schemes, and only the ICAO Council may amend them (ICAO; IATA, January 2024). Those documents include the sustainability criteria in their fourth edition of June 2025 and the default life cycle emissions values in their ninth edition of November 2026. A producer can produce batches for 365 calendar days after certification, and must then be re-certified against the criteria applicable at that time.

The deduction is applied at the end of each three-year compliance period and can only be claimed for the compliance period during which the fuel was blended (IATA, January 2024). The claim runs through the monitoring, reporting and verification rules of Annex 16 Volume IV, so an operator above 10,000 tonnes of CO2 on international flights must monitor, verify and report, and the reduction is deducted from the total offsetting requirement only when the period closes.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you want a second read on a fuel file before it reaches a lender or a verifier, my EU compliance. In addition, carbon intensity work starts from the certification date and the blend date, then maps eligibility, accounting. In addition, reporting into one dated file.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles