We Connect Asia

SAF

SAF vs Other Aviation Decarbonisation Options: What Flies First

10 min read  ·  Nov 2, 2026  ·  By Alex

saf vs alternatives

The answer I give first to the developer asking which decarbonisation option to build a project around: sustainable aviation fuel is the only option that flies today on the existing fleet, with existing aircraft and existing fuel infrastructure. Battery-electric aircraft stay under 500 km, hydrogen aircraft are delayed past 2035, and neither efficiency nor carbon credits take a molecule of carbon out of the tank. The option that turns into contractible demand is the one a mandate names, where a mandate is a written obligation to buy. That is the spine of my SAF vs alternatives comparison, and it starts from the fuel itself.

I am writing this for the developer at concept stage who has to pick one option to build a project around, and who needs to know which one will still be demanded when the asset operates. I compare on published numbers only, each with its date.

In short

  • What flies now: SAF is a drop-in fuel on today’s fleet, with most engines certified for a 50% blend without modification.
  • What waits: Battery-electric aircraft stay under 500 km, and Airbus pushed its hydrogen aircraft goal from 2035 by 5 to 10 years.
  • What it costs: SAF runs 2 to 5 times conventional jet fuel, and 2026 output is expected at around 2.4 million tonnes.
  • Who has to buy: A mandate is a written obligation to buy, and the certificate chain decides who receives the credit.
  • What never moves: Efficiency and offsets change an attribute, not the fuel in the wing.
Facebook
Twitter
LinkedIn

In this article

The short answer: the option that already flies

SAF is a drop-in fuel: it replaces fossil jet fuel with minimal changes to aircraft and infrastructure, and the blend limit, the maximum share of SAF allowed in a tank, is a quality rule rather than an aircraft redesign. Most engines today are certified to use a 50% blend of SAF and fossil jet fuel without modification (ICCT, October 2025), and SAF blended with conventional Jet A can be used in existing aircraft and infrastructure (US Department of Energy, consulted 16 November 2026). In 2025, SAF made up about 0.6% of jet fuel used globally, and by 2050 SAF is expected to grow to more than half of global jet fuel use (ICCT, October 2025). SAF is expected to contribute the majority of aviation sector emission reductions in most government and industry roadmaps (ICCT, October 2025). The other options are real, but they arrive on a different calendar.

What this means for you: I can finance an asset whose output works in every aircraft on the ramp today, while the alternatives wait behind an entry-into-service date I do not control.

Not all SAF is created equal

SAF splits into biofuels from biomass and e-fuels or e-kerosene from renewable electricity and carbon dioxide (ICCT, October 2025). First-generation bio-SAF uses food-based feedstocks such as vegetable oils, sugar or starch crops, with limited availability and significant sustainability risks, while second-generation bio-SAF uses non-food cellulosic materials such as agricultural residues, woody biomass or municipal solid waste (ICCT, October 2025). Waste-based SAF cuts life-cycle emissions, the total counted from feedstock production to combustion, by up to 80% against fossil jet fuel, while crop-based SAF can reach emissions similar to or above fossil fuels (ICCT, October 2025). Certification covers feedstock sourcing, land-use change, biodiversity, water use and emissions accounting with traceability and independent verification (IATA, June 2026), and I set out the requirements on the sustainability criteria. No SAF is inherently carbon-neutral: slow-growing trees create a carbon debt taking decades of growth to counteract (ICCT, October 2025).

What this means for you: I do not buy a fuel name, I buy a feedstock and a verification chain, and I write both into the offtake before the price conversation starts.

What the option costs the buyer

SAF currently costs 2 to 5 times more than conventional jet fuel because of high production costs, limited availability, costly feedstocks and complex processes, and all pathways are expected to remain more expensive than fossil jet fuel (ICCT, October 2025). SAF also represents less than 1% of global aviation fuel use and is several times more expensive than conventional aviation fuel because of feedstock cost, still developing production technologies, missing physical and market infrastructure, and high upfront investment needs (IATA, June 2026). Global SAF production is expected to reach around 2.4 million tonnes in 2026, representing just 0.8% of aviation fuel use, at a cost to airlines of $4.3 billion (IATA, 6 June 2026). Many advanced SAF projects stall before construction because of financing gaps, policy uncertainty and technical setbacks (ICCT, October 2025), and I hold the premium mechanics on the fuel price page.

What this means for you: the premium is the deal, so I fix volume, index and certificate ownership in the contract instead of hoping the market closes the gap.

The option that is not a fuel yet: hydrogen, electric and e-kerosene

Power-to-liquid means combining renewable energy with carbon dioxide, which is how e-kerosene is made (ICCT, October 2025), and the power-to-liquid pathway carries the widest rule-to-plant gap I track. The EU and the UK have mandated e-SAF production of around 0.6 million tonnes by 2030, while global e-SAF capacity operating and under construction stands at around 0.02 million tonnes, with only one single production site in operation and approximately 20 commercial-scale refineries needed to reach the mandate (IATA, 6 June 2026). No new final investment decisions for e-SAF facilities have been made over the past year (IATA, 6 June 2026).

Zero-emission planes powered by hydrogen or electricity face limited range, heavier energy storage and costly new airport infrastructure, while they are more energy efficient to produce, less land-intensive, and emit no carbon dioxide or air pollutants during operation (ICCT, October 2025). Battery-electric aircraft remain limited to serving short routes under 500 km, and Airbus pushed back its goal to introduce hydrogen-powered commercial aircraft in 2035 by 5 to 10 years (ICCT, May 2025).

What this means for you: I treat hydrogen, electric and e-kerosene as pipeline options rather than offtake candidates until a plant runs and a date is printed.

The demand side is a rule, not a preference

Aviation accounts for 2% of all carbon dioxide and 12% of all carbon dioxide from transportation worldwide, and CORSIA caps net CO2 from aviation at 2020 levels through 2035 (US Department of Energy, consulted 16 November 2026). SAF is described as the best near-term opportunity to meet the international aviation industry’s usage goals (US Department of Energy, consulted 16 November 2026). The written obligation lives on the mandate rules.

IATA lists four priorities: expand renewable energy supply, ensure open access to fuel infrastructure including pipelines, storage and airport fuel systems, strengthen policy support through effective sequencing of production incentives before any mandates are imposed, and enable a global SAF market with sufficient volumes at commercially viable prices (IATA, 6 June 2026). IATA adds that any SAF mandates should be introduced only where the necessary market conditions, production capacity, infrastructure readiness and supportive policy measures are sufficiently in place (IATA, June 2026). Government measures include production incentives, grants, loan guarantees, regulatory frameworks and policies that facilitate access to feedstocks and infrastructure (IATA, June 2026).

What this means for you: I map the rule first and the technology second, because the rule decides whether a buyer must show up at my gate.

What a claim is worth

SAF accounting runs on sustainability certificates that help prevent double counting and ensure emissions benefits are assigned correctly, and when passengers pay for SAF upgrades airlines can retire certificates on their behalf (ICCT, October 2025). Outside regions with SAF blending mandates, most SAF credits are sold to corporations, meaning the business’ carbon footprint, and not that of individual passengers, is reduced (ICCT, October 2025).

CORSIA already works through purchase-based claiming, and IATA states that governments should support the development and recognition of global SAF book-and-claim systems, consistent with the purchase-based claiming approach allowed under CORSIA (IATA, June 2026). Book and claim means claiming the attribute of fuel produced elsewhere without taking delivery. A certificate moves an attribute, it does not move a molecule, and the page linked here is where the claiming scheme lives.

What this means for you: I write who retires which certificate, on whose behalf and under which registry, before I write the volume.

Where I draw the line

I do not rank options by what they promise, I rank them by three tests: does it fly on the fleet I am financing, is the demand written into a rule that outlives my loan, and does a contract carry the premium when the market will not. I keep a fourth note in the margin: what would have to be true for the second option to arrive early. Those three tests cost me nothing to apply, and they survive a change of management on the other side of my offtake. The published record says the second option is delayed, the fuel option is expensive, and the rule is what makes the buyer.

What this means for you: I pass or fail a project on those three tests, and I document the published number and its date beside each one.

How I would run this if it were my file

I draw one page with four rows: the option that flies now, the option that flies later, the part that is not a fuel, and the part that is only a claim. On each row I write the published number, the date of that number, and the contract clause that would protect me if the number moved. I date-stamp every figure, because a number without a date is a number I cannot defend to an investment committee, and the delay I watch for is the one that appears as a final investment decision that never came.

What this means for you: I bring four rows and a date stamp into the investment committee, and I move only when a published number moves.

Sources

Frequently asked questions

No. SAF is the option that works on today’s fleet and today’s infrastructure, with a 50% blend certified without modification, and it is expected to contribute the majority of aviation emission reductions in most government and industry roadmaps, while zero-emission aircraft are more energy efficient to produce, less land-intensive and emit no carbon dioxide during operation (ICCT, October 2025).

Not cancelled, delayed. Airbus pushed its hydrogen aircraft goal from 2035 by 5 to 10 years, citing infrastructure challenges and slower technology development, and inadequate hydrogen infrastructure remains a roadblock to its programme, while green hydrogen comprised less than 1% of global hydrogen production in 2024 (ICCT, May 2025). The aircraft are on a later calendar rather than off it.

The cheaper option is not on a calendar I can contract against. SAF already costs 2 to 5 times fossil jet fuel, yet many advanced projects stall before construction because of financing gaps, policy uncertainty and technical setbacks, so I fix the volume and the certificate chain now and I reprice when a published number moves (ICCT, October 2025).

Efficiency and accounting do not empty a tank. CORSIA caps net CO2 from aviation at 2020 levels through 2035, and certificates prevent double counting (US Department of Energy, consulted 16 November 2026). Outside mandates, most SAF credits are sold to corporations, so an attribute sale changes a footprint rather than the fuel in the wing (ICCT, October 2025).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are structuring a pre-FID file and want a second pair of eyes on which option carries the written demand, I work with developers at concept stage and offer investor introductions once the comparison above has become a term sheet.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles