The line for a sustainable aviation fuel project is drawn by feedstock class in legal text, not by a general verdict. The renewable energy directive, RED III, caps conventional biofuels from food and feed crops at 7 percent of transport energy or one percentage point above the member state’s 2020 share, whichever is lower. ReFuelEU Aviation does not count fuels made from food or feed crops toward the mandate even when eligible under RED accounting. Annex IX part A holds advanced feedstocks counted twice and part B holds used cooking oil and animal fats counted once subject to caps. The evidence behind the food vs fuel saf question is mixed: 56% of 224 publications reported a negative impact of bioenergy production on food security and no relationship was found between edible and inedible feedstocks. I hold all of it in one feedstock availability file.
I treat this as a feasibility question rather than a moral one. What follows is the rule text, the research record, the supply position, and the order I would run the work in before a feedstock supplier and its financiers commit to a file.
In short
- The rule: RED III caps food and feed crop biofuels at 7 percent of transport energy; ReFuelEU does not count them.
- The evidence: 56% of 224 publications reported a negative impact on food security, with no edible versus inedible relationship.
- Annex IX: Part A feedstocks count twice, part B oils and fats count once subject to caps.
- The supply: Waste cooking oil and tallow are expected to supply 40% of all SAF feedstock by 2030.
- The weak points: Eligibility read as verdict, waste status assumed, and availability read from thin data.
In this article
1. The short answer: the line is a list, not a verdict
No regulator I have read bans a fuel as a class. The rule separates feedstock classes instead. RED III puts conventional biofuels made from food and feed crops, such as corn ethanol or biodiesel from soybean or rapeseed oil, under a cap: a fixed ceiling on how much transport energy that class may count for, set at either 7 percent of transport energy or one percentage point above the member state’s 2020 share, whichever is lower. It also requires a phase-out of biofuels associated with high indirect land use change (ILUC) risk, and palm oil-based fuels are designated high risk and must leave by 2030 unless certified as low ILUC-risk. A first-generation feedstock is one grown on arable land that could otherwise grow food, and that is the class the ceiling bites. ReFuelEU Aviation then applies a separate test: fuels made from food or feed crops do not count toward its mandate even when eligible under RED accounting.
What this means for you: I name the class my feedstock sits in under each instrument, because passing one rule does not deliver the other, and eligibility on paper is only the entry ticket.
2. What the evidence actually says
Food security, a multidimensional goal that includes food availability, food prices and food production, is the parameter most people reach for in this argument, and those goals are increasingly competing with other societal and planetary goals. The systematic review in npj Science of Food covered 224 publications: 56% reported a negative impact of bioenergy production on food security, and no relationship was found between bioenergy feedstocks that are edible versus inedible and food security (P value 0.15). Strong relationships did appear with the type of food security parameter (P value < 0.001), the sociodemographic index of the study location (P value 0.001), the spatial scale (P value < 0.001) and the temporal scale (P value 0.017). The review also notes that inedible feedstocks include some first-generation as well as second- and third-generation biofuels, so the classification alone does not determine the outcome.
What this means for you: I do not let an eligibility listing stand in for a food security finding, and I check the rule first in the annex IX feedstock file before I argue either way.
3. How Europe wrote it down
Europe wrote its uncertainty down instead of hiding it. When developing its approach to indirect land use change, EU policymakers concluded that although land-use change risks were important, available ILUC projections were too uncertain to incorporate directly into life-cycle carbon intensity scores, so quantity-based limits serve as guardrails instead. RED III therefore caps conventional biofuels made from food and feed crops, naming corn ethanol and biodiesel from soybean or rapeseed oil, and requires a phase-out of high ILUC-risk biofuels. The logic runs outside aviation too: FuelEU Maritime sets a decreasing maximum emissions intensity for energy used by ships at European ports, and fuels made from food or feed crops do not count toward emissions reductions. Under the EU emissions trading system the biogenic portion of fuels counts as zero-emission only if it meets RED sustainability and greenhouse gas saving criteria.
What this means for you: I read my carbon intensity case through that chain, since a feedstock failing RED screening can lose its zero-emission treatment upstream of my buyer. My carbon intensity work starts from the rule, not from a score.
4. What annex IX decides
Annex IX is where a feedstock’s accounting status is fixed. Part A of annex IX lists feedstocks for advanced biofuels whose contribution towards minimum shares may be considered twice their energy content, a mechanism called double counting, and it includes cereal residues and straw, palm oil mill effluent and empty palm fruit bunches, and sugarcane bagasse. Part B of annex IX lists oils and fats from crop production whose contribution may be counted once, subject to caps, and it includes used cooking oil and animal fats. The directive demands a phase-out of biofuels associated with high indirect land use change risk, such as palm oil from high ILUC-risk areas. ReFuelEU Aviation defines SAF as covering synthetic fuels from renewable hydrogen and captured carbon, advanced biofuels from part A feedstocks, biofuels from the part B oils and fats, and recycled carbon aviation fuels, with a 2% share at EU airports from 2025 rising to 70% from 2050.
What this means for you: I state which part my feedstock sits in and how its contribution counts before anyone discusses a route to market, and I read the mandate text in full at ReFuelEU Aviation.
5. What the supply position is
First-generation lipid-based feedstocks such as waste cooking oil and tallow dominate current production at more than 90%, but they are constrained by scarcity and land use. The industrial sector expects waste cooking oil and tallow to supply 40% of all SAF feedstock by 2030, while the IEA expects lignocellulose to supply less than 1% of the 13 Mt per year biojet feedstock demand in 2030. The primary lipid feedstocks are all by-products: soybeans are grown for their meal, cattle are raised to supply beef, and ethanol plants produce ethanol rather than corn oil. Growth in demand for low-carbon fuels points to significant market tightness, especially for waste oils like UCO and tallow. The RSB bands food and feed crops such as palm oil, sugarcane and corn as higher risk because of intensive cultivation and direct and indirect land use change.
What this means for you: I run the waste test and the crop test separately and hold both against the SAF sustainability criteria my buyer’s scheme applies, because eligibility on paper does not tell me whether the tonnage is still there.
6. Three ways the test fails in practice
First, treating eligibility as a food security verdict. The food vs fuel saf test then rests on mixed results: 56% of 224 publications reported a negative impact, with no relationship between edible and inedible feedstocks at a P value of 0.15, so a listing in a legal annex is not a finding about hunger.
Second, assuming waste status ends the argument. Used cooking oil and tallow are by-products, yet the same waste oils face competing uses and significant market tightness, and Europe already separates tallow by category, with category 3 fit for human consumption and excluded from biofuel production.
Third, reading availability from thin regional data. The RSB could use only 17 articles out of 85 for its quantitative analysis, found no animal fat data at all, and found UCO data only in Indonesia and Malaysia, while still recommending research on categories left out for lack of data.
What this means for you: I flag all three gaps in writing, because a lender or offtaker who finds them later will read them as a missing answer rather than a known limit.
7. The order I would run the work in
I run the checks in a fixed order so that price is the last thing on the table. First, I confirm which part of annex IX my feedstock sits in and how its contribution counts. Second, I confirm the sustainability criteria of the scheme I am selling into and how it treats direct and induced land-use change. Third, I confirm who already holds the competing tonnage for the same lipids or residues. Fourth, I confirm the buyer’s own rule, since ReFuelEU counts the fuel or does not count it. Only then do I discuss price with the counterparties who fund and offtake this kind of supply. None of these checks needs a forecast; each one can be answered from a published text.
What this means for you: I would not take a feedstock to committee on annex IX standing alone. The non-food oil crops file puts these four checks ahead of any commercial conversation, and I keep each answer attached to the text that produced it.
8. How I would run this if it were my file
If this were my file, one page would go to committee before any number. That page would carry the 7 percent cap and the 2030 palm phase-out, the ReFuelEU exclusion of food and feed crop fuels, the 56% of 224 publications with the edible versus inedible P value of 0.15, the part A and part B split of annex IX, the more than 90% lipid dominance with 40% expected from waste cooking oil and tallow by 2030, and the by-product structure of the lipid pool. A reader should be able to tell from that page alone which question is settled by text and which one is still open in the research record. Everything else goes in an annex.
What this means for you: I want a committee to see the rule, the evidence and the supply structure in that order, because each one answers a different objection and none of them promises that a listing will find a buyer at a price.
Sources
- Resources for the Future, 3 March 2026.
- npj Science of Food, 4 May 2021.
- RSB, September 2024.
- EUCASS, 2025.
- EUR-Lex, 16 November 2026.
- Stillwater Publications, 28 October 2025.
- European Commission, 16 November 2026.
Frequently asked questions
Is palm oil banned as a SAF feedstock in Europe?
Not outright, though it is heading out. Palm oil-based fuels are designated high ILUC-risk and must be phased out by 2030 unless certified as low ILUC-risk. Under ReFuelEU Aviation, fuels made from high ILUC-risk feedstocks do not count toward the mandate even when they are eligible under RED accounting, so a palm-derived volume can satisfy one rule and still count for nothing under the other.
Do waste oils like used cooking oil count as food-competing feedstock?
No. Used cooking oil and animal fats sit in part B of annex IX, where oils and fats from crop production are counted once subject to caps. The part holds them next to the crop oils it also covers, so the classification runs on waste origin with a cap attached rather than on food-competing status, while part A advanced feedstocks are the ones counted twice.
Does using a waste feedstock end the food versus fuel debate?
Not by itself. The primary lipid feedstocks are all by-products: soybeans are grown for their meal, cattle are raised to supply beef, and ethanol plants produce ethanol rather than corn oil. Even so, growth in demand for low-carbon fuels points to significant market tightness, especially for waste oils like UCO and tallow, and the RSB bands food and feed crops such as palm oil, sugarcane and corn as higher risk because of intensive cultivation and direct and indirect land use change.
What should my feasibility file prove on this question?
Three things. The annex IX part standing and how the contribution counts. The evidence position, since 56% of 224 publications reported a negative impact of bioenergy production on food security and no edible versus inedible relationship was found at a P value of 0.15. The competing uses already attached to the same tonnage, which is where waste oils like UCO and tallow show tightness rather than surplus.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
When the file is ready and you want it in front of the counterparties who fund and offtake this kind of supply, I place the project through investor introductions so the conversation opens on the rule, the evidence and the tonnage already on the page.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.