Home » Green Methanol Market Overview: Two Markets, Two Sets of Numbers
Green Methanol Market Overview: Two Markets, Two Sets of Numbers
10 min read · Jul 2, 2026 · By Alex
I track the demand for green methanol as two separate books, and I begin at the parent page, my definition of what counts as green. The first book is a fossil methanol market of about 98 million tonnes a year, where Energy Aspects estimates 114.5 Mt of global demand in 2026. The second book is a renewable market that sold 400,000 to 500,000 tons in 2024 while its project pipeline to 2030 stands announced at 56.5 million tonnes. That split is the spine of this methanol market overview, and I keep the two sets of numbers in separate columns so neither is mistaken for the other.
Both books are real and they price differently, one off coal and gas, the other off a mandate. Everything below is a reading of published figures, dated at the point where I use them. I write it the way I would brief a developer who is still at concept stage.
In short
- Two markets: I read a fossil book and a renewable book, priced and reported separately.
- Fossil base: IRENA put production at around 98 million tonnes per annum in 2021, nearly all fossil.
- Renewable sales: The Methanol Institute recorded 400,000 to 500,000 tons of renewable product sold in 2024.
- Pipeline: GENA tracked 56.5 million tonnes of announced capacity to 2030 as of December 2025, mostly early stage.
- Marine pull: More than 1,000 vessels classed for methanol enter service over the next five years.
In this article
The market as I read it
IRENA puts methanol production at around 98 million tonnes per annum, nearly all of it from natural gas or coal, spread across over 90 different methanol plants, and it puts life-cycle emissions from current production and use at around 0.3 gigatonnes CO2 per annum, about 10% of total chemical sector emissions. The Methanol Institute records total methanol supply in 2024 at 94 million metric tons, with just 400,000 to 500,000 tons of renewable product sold. Energy Aspects estimates global methanol demand at 114.5 Mt in 2026, growth of 1.2% year on year, down from the 2.5% it had projected earlier, rising to 126.7 Mt by 2030 at a 2.4% compound annual rate, led by growth in Asia. The green segment is a sliver inside that market, so the definition of what counts as green is the first thing I fix.
What this means for you: read any single methanol number with its date and its source attached, because a production figure from IRENA in 2021, a supply figure from the Methanol Institute in 2024 and a demand estimate from Energy Aspects in 2026 are three different things.
Where the demand is
GlobalData expects China to account for about 70% of global methanol demand in 2026, far ahead of any other country, with the United States second at 8.65 million tonnes per annum and India third at 3.59 million tonnes per annum, and the global market expanding at a compound annual rate of 2.2% over 2026 to 2030. China’s position rests on domestic coal availability and on methanol-to-olefins capacity, the plants that convert methanol into chemical feedstocks. Argus puts Southeast Asia methanol demand at about 4.1 million tonnes in 2024, growing to 4.8 million tonnes by 2028, a compound annual rate of 4.4% against 3.7% over 2019 to 2023, with biodiesel leading regional demand growth at 45% of total demand in 2024. The regional demand is the part a Southeast Asian developer can actually serve.
What this means for you: if you sell into Southeast Asia you are competing for a 4.8 million tonne regional pool in 2028, and that is the number I would model, not the global total.
Where the supply is
Argus puts global methanol capacity in 2024 at 147 million tonnes excluding coal-to-olefins routes, with China at 51% or 72 million tonnes, the Middle East at 18% or 27 million tonnes, and Latin America and the Caribbean at 8% or 12 million tonnes. Southeast Asia capacity, Argus puts it at 10.8 million tonnes after the launch of Sarawak, up from 7.5 million tonnes. Supply ran far ahead of demand over 2019 to 2023, with 23 million tonnes of capacity additions against 6 million tonnes of demand growth, and operating rates, the share of installed capacity that runs, falling from 69% to 61%, expected to return to around 65% as the imbalance eases. On the renewable side the Methanol Institute and GENA Solutions track more than 200 announced projects totalling 45.8 million metric tons by 2030 as of February 2025, of which only 20% to 40% may move forward, still 7 to 14 million metric tons, against roughly 4 million metric tons of facilities operational or under construction. The production routes decide which tonnes can be certified.
What this means for you: check the operating rate where you plan to build; idle fossil capacity comes first.
Who signs for it
Chemical buyers take the bulk of the fossil molecule through formaldehyde, acetic acid and methanol-to-olefins, while the renewable molecule is sold on contracts tied to a shipping or aviation obligation. The Methanol Institute records that in 2024 the first large methanol-enabled containership entered service and that shipowners signed landmark methanol offtake agreements for their dual-fuel fleets, with 50 methanol dual-fuel vessels in service at the start of 2025, an orderbook of 350 methanol-capable newbuildings and nearly 700 methanol-ready ships, so more than 1,000 vessels classed for methanol will enter service over the next five years. Argus reports that 11 projects in China, more than 3 million tonnes a year of capacity, have been put on hold, citing high entry barriers for new industries, technology risks, return on investment, and demand and policy uncertainties. The offtake contract is what converts an announcement into demand.
What this means for you: ask for the signed offtake behind the vessel count, because a hull on order and a tonne under contract are different claims.
What regulation does to demand
The International Maritime Organization sets the calendar behind every green methanol pipeline I read. Its decision to adjourn adoption of the Net-Zero Framework in October 2025 was followed by slower project growth in November and December 2025, after GENA had registered 94 new renewable and low-carbon methanol projects during 2025 and excluded 34 halted projects. Energy Aspects expects 2026 demand growth of 1.2% against 2.5% projected earlier, and the pipeline to 2030 to reach 126.7 Mt, so the fossil market keeps growing on its own momentum. I treat the adoption date as a modelling input rather than as a volume, because no tonne is contracted by a date alone; the framework still has to be adopted before it prices anything. The regulatory calendar is the variable I watch, because it moves the green pipeline faster than the plants.
What this means for you: keep two demand curves, one that runs on regulation and one that runs on chemical consumption, and never blend them.
What the pipeline really is
GENA’s Project Navigator Methanol tracks 273 renewable and low-carbon methanol plants and projects as of December 2025 with a total capacity of 56.5 million tonnes by 2030: 133 e-methanol projects at 23.3 million tonnes, 122 biomethanol projects at 22.1 million tonnes, and 18 low-carbon methanol projects at 11.2 million tonnes. The pipeline grew by 12.4 million tonnes for renewable methanol and 3 million tonnes for low-carbon methanol between December 2024 and December 2025. Both e-methanol and biomethanol pipelines remain dominated by early-stage feasibility and pre-feasibility work; during 2025 eight commercial-scale projects began construction or reached final investment decision, the moment a board commits capital, while twelve entered front-end engineering design, the engineering done before construction. China holds 78% of the biomethanol pipeline and 43% of the e-methanol pipeline, and accounts for more than 90 percent of renewable methanol capacity under construction. That is a pipeline, not a market, and the buyers behind it are the ones I would count.
What this means for you: count projects only after a final investment decision, and count volume only after a signed contract.
What I would ask before signing
Before I sign anything I ask four questions in writing. First, which market my volume belongs to, the fossil market that prices off coal and gas, or the renewable market that prices off a mandate. Second, what the operating rate is in my region, because Argus records it falling from 69% to 61% when supply outran demand. Third, what share of the announced pipeline has reached final investment decision, because GENA records early-stage work dominating both pipelines. Fourth, who signs the offtake and under which regulation, and which chain of custody applies, since a mass balance rule lets certified and conventional molecules be mixed in one plant and allocated on paper. I put all four answers in the same table as the volumes, because a number without a contract, a date and a certification basis cannot be modelled as demand.
What this means for you: if any of the four answers is missing, the file is still at concept stage and the model should say so.
How I would model it if it were my file
I keep four dated rows. The demand row carries 114.5 Mt in 2026 and 126.7 Mt by 2030 from Energy Aspects, next to 98 million tonnes of annual production from IRENA 2021, each figure dated in its own cell. The supply row carries 147 million tonnes of 2024 capacity from Argus and operating rates from 69% to 61%. The renewable row carries 400,000 to 500,000 tons sold in 2024 against a 56.5 million tonne pipeline to 2030. Each row carries its source and its date in the same cell, so a production figure from IRENA in 2021 never sits unlabelled beside a sales figure from the Methanol Institute in 2025. I add no growth rate that is not published, and I never roll a 2030 announcement forward as supply. My last row is contracted volume, because that is the only row a lender will count.
What this means for you: build the file so the contracted row is the only one that can carry the case, and let every other row stay as context.
Sources
- IRENA, 2021.
- IRENA, 2021.
- Argus, 16 May 2025.
- Methanol Institute, 2025.
- Bioenergy International, 26 January 2026.
- Offshore Technology, 23 February 2026.
- Energy Aspects, 16 July 2026.
Frequently asked questions
How big is the global methanol market?
Around 98 million tonnes of methanol are produced per annum across over 90 plants, on the IRENA 2021 reading, total supply was 94 million metric tons in 2024 according to the Methanol Institute in 2025, and Energy Aspects estimates global demand at 114.5 Mt in 2026 rising to 126.7 Mt by 2030 at a 2.4% compound annual rate. Those are three different measures, production, supply and demand, and I date every one of them before I use it.
How much green methanol is actually sold today?
400,000 to 500,000 tons of renewable product were sold in 2024, against roughly 4 million metric tons of low-carbon, bio-methanol and e-methanol facilities operational or under construction as of February 2025, both figures from the Methanol Institute in 2025. Renewable product remains a fraction of the 94 million metric tons of total supply recorded in the same 2024 year.
Where is methanol demand growing fastest?
GlobalData expects China at about 70% of global demand in 2026, a position built on domestic coal availability and methanol-to-olefins capacity, while Argus puts Southeast Asia demand at about 4.1 million tonnes in 2024 growing to 4.8 million tonnes by 2028, a 4.4% compound annual rate. Energy Aspects expects the growth to Asia to carry the 2030 total.
Is the green methanol pipeline the same as demand?
No. GENA tracks 273 projects totalling 56.5 million tonnes by 2030 as of December 2025, both pipelines remain dominated by early-stage feasibility work, and only 20% to 40% of announced projects may move forward, which would still be 7 to 14 million metric tons. An announcement is a capacity claim, and only a signed offtake becomes demand.
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you want the demand side modelled rather than announced, this is the work I do: how I structure an offtake agreement. I read the published figures, I date them, and I separate the contracted volume from the pipeline so you know which one a buyer is actually signing.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.