We Connect Asia

Methanol

The IMO GHG Fuel Standard Explained: How a Ship's Fuel Is Measured, Scored and Paid For

10 min read  ·  Nov 2, 2026  ·  By Alex

imo ghg fuel standard explained

I began with the unit of measure. A ship scores its fuel once a year. Each vessel gets its own figure. The IMO GHG fuel standard measures a ship’s annual greenhouse gas fuel intensity in grams of CO2 equivalent per megajoule on a well-to-wake basis, applies to oceangoing ships over 5,000 gross tonnage emitting over 85% of global shipping emissions, sets two compliance tiers, settles a deficit with surplus units or remedial units bought through the Net-Zero Fund, and scores fuels at or below 19.0 gCO2eq/MJ as zero or near-zero against a current average of 93.3 gCO2eq/MJ (IMO, FAQ). The framework carrying the metric is written as a new Chapter 5 of Annex VI of MARPOL, approved in April 2025 and pending adoption.

I am writing this for a fuel project at concept stage, where the question is practical rather than political. Before any volume is committed I need to know how the number is produced, who verifies it. In addition, what a deficit costs. Everything below comes from the published documents listed at the end.

In short

  • Metric: greenhouse gas fuel intensity in grams of CO2 equivalent per megajoule, calculated well to wake.
  • Scope: oceangoing ships over 5,000 gross tonnage, which emit over 85% of global shipping emissions.
  • Tiers: a base target and a direct compliance target; surplus earned above the stricter line, deficit below it.
  • Settlement: surplus units transferred or banked, or remedial units bought through the Net-Zero Fund.
  • Status: approved in April 2025, adoption adjourned in October 2025, not yet in force.
Facebook
Twitter
LinkedIn

In this article

What the standard measures

Under the IMO GHG fuel standard, the metric is the annual greenhouse gas fuel intensity of a ship. The amount of greenhouse gas emitted for each unit of energy the vessel uses, expressed in grams of CO2 equivalent per megajoule (IMO, FAQ). I read it as energy intensity, so distance alone never improves it. Well-to-wake is the boundary: it counts carbon dioxide, methane and nitrous oxide across the whole life of the fuel, from extraction and production to combustion on board. Ships report that figure to the IMO every year, and the published design sets a reduction target for each year up to 2035 (Global Maritime Forum).

Gross tonnage, a measure of a ship’s overall internal volume rather than its cargo weight, sets the threshold. The rule reaches oceangoing ships over 5,000 gross tonnage, which account for over 85% of global shipping emissions. In addition, the rule is written as a new Chapter 5 of Annex VI of MARPOL.

What this means for you: I fix my fuel’s intensity figure before I discuss volume. That is because the regulated quantity is grams per megajoule and not tonnes delivered.

Two tiers, not one

The framework sets two levels of compliance: a Base Target. Also, the first line the ship must stay under, and a Direct Compliance Target, a stricter line from which surplus units are generated (IMO, 11 April 2025). I define a base target as the minimum performance level and a direct compliance target as the level a ship passes to earn a credit. A surplus unit is the credit earned by a ship below the line. In addition, a remedial unit is what a ship above the line must acquire to clear its deficit. A ship under the threshold banks or trades its surplus, and a ship over it must balance the deficit.

The structure gives the fleet an intensity position that carries forward and a financial position that must be settled. Moreover, the Global Maritime Forum describes it as a credit trading system. So the fuel choice in the fleet becomes a scored choice rather than a preference.

What this means for you: I model two outputs for my project, the intensity it delivers. In addition, the surplus it could generate, because only the second one can be sold.

The same metric, a different geography

FuelEU Maritime applies the same well-to-wake logic to ships above 5,000 gross tonnage calling at European ports, whatever their flag. In addition, it has applied in full since 1 January 2025 (European Commission). DNV gives the calculation base as the 2020 fleet average of 91.16 gCO2e/MJ, cut 2% in 2025, 6% in 2030 and 80% by 2050, applied to 100% of the energy on voyages inside the European Union and European Economic Area and 50% on voyages entering or leaving. The IMO FAQ puts the current average behind its own scale at 93.3 gCO2eq/MJ, with zero or near-zero fuels at no more than 19.0 gCO2eq/MJ, which is 80% lower.

Also, the two scales rhyme, but one applies from a port call in Europe while the other will follow the ship wherever it trades. Once adopted. The European rule is my working reference while the global one is pending.

What this means for you: I score the same molecule against both baselines, 91.16 gCO2e/MJ in Europe and 93.3 gCO2eq/MJ under the IMO scale. In addition, I keep the two labels apart in my file.

What a deficit costs

A deficit is settled in units, and the money sits behind those units. Ships above the threshold acquire remedial units through contributions to the IMO Net-Zero Fund, while ships using zero or near-zero technologies are entitled to financial rewards (IMO, 11 April 2025). I read the fund’s published purpose as four lines: reward low-emission ships, support innovation, research and infrastructure. In addition, a just transition in developing countries, fund training and technology transfer, and reduce the impact on vulnerable states including small island developing states and least developed countries. The FAQ is explicit on what the mechanism is not: it is not a global carbon tax, but performance-based targets, tiered compliance fees.

In addition, a dedicated fund rather than a single rate paid to national treasuries (IMO, FAQ). The Global Maritime Forum records that revenue from non-compliance funds a reward mechanism for zero or near-zero fuels.

What this means for you. I put the compliance cost in a lender’s model as a variable line tied to my intensity score, not as a fixed levy.

Where the record lives

Nothing works without verification. The IMO FAQ requires fuel emissions. In addition, sustainability to be checked independently through a sustainable fuel certification scheme recognized by the Marine Environment Protection Committee. In addition, a digital IMO GFI Registry will hold the compliance position of every ship. Surplus units banked, remedial units acquired, intensity calculations, transfers and cancellations (IMO, FAQ). A deficit is balanced by transferring surplus units from other ships. Using units already banked, or acquiring remedial units through a contribution to the Net-Zero Fund. Application sits with member states acting as flag state, port state or coastal state. Therefore, the same intensity figure is reported to more than one authority.

The European measure runs the same kind of system. In addition, DNV SE is the accredited body for FuelEU Maritime verification. The certificate layer around the molecule is therefore regulated, auditable and traceable to one ship.

What this means for you: I ask which recognized scheme signs my certificate and where the unit record will sit before I promise any compliance claim.

Which fuels clear the bar

The number that decides the reward under the IMO GHG fuel standard is 19.0 gCO2eq/MJ: fuels at or below that level count as zero or near-zero. That is 80% below the current average of 93.3 gCO2eq/MJ, and ships using them may earn financial rewards (IMO, FAQ). Three parts of the design are still moving. Life-cycle emission factors are under review by GESAMP. The Global Maritime Forum reports that reward rules for zero or near-zero fuels, the fuel standard itself and fuel pathway certification have advanced furthest, while the Net-Zero Fund remains the least developed element.

Also, the 2023 IMO strategy behind all of this targets net-zero for the sector around 2050, with indicative checkpoints in 2030 and 2040, and asks for zero or near-zero fuels and technologies to reach at least 5% of the energy used by international shipping by 2030, striving for 10%. The production routes landing under the threshold are the ones my demand model can count.

What this means for you: I treat 19.0 gCO2eq/MJ as the commercial gate and I ask for the emission factor behind every pathway before I credit it.

What I would ask before I rely on it

I ask five questions in writing, and I want each answer dated. The reason I ask in this order is that the first answer changes everything downstream. Also, the regulations were approved by the Marine Environment Protection Committee at its 83rd session from 7 to 11 April 2025, the session of 14 to 17 October 2025 adjourned the adoption decision for one year. In addition, entry into force would come 16 months after adoption (IMO, FAQ).

  • Has the text been approved, adopted or entered into force, and on which date?
  • Which ships are covered by gross tonnage, and which voyages count toward the figure?
  • What intensity does my fuel score on a well-to-wake basis, in grams of CO2 equivalent per megajoule, and against which baseline year?
  • Which recognized certification scheme will verify it, and who signs the certificate?
  • Where will the unit record sit. That is because the registry and not the press release is where a compliance claim is proven?

What this means for you. I do not build a volume case until those five answers are on paper, each with its date and its source.

How I would build the file if it were my own

Consequently, I keep four dated rows in a single sheet.n a single sheet.

  • The status row carries the approval of 7 to 11 April 2025 and the adjournment taken from 14 to 17 October 2025, plus the mechanism that follows adoption. Tacit acceptance, meaning the amendment is deemed accepted after a minimum of ten months expires without a formal objection from less than one third of the Parties or from Parties representing at least 50% of world tonnage, with entry into force six months later.
  • The metric row carries 93.3 gCO2eq/MJ as the current average, 19.0 gCO2eq/MJ as the zero or near-zero threshold and 91.16 gCO2e/MJ as the European 2020 baseline. Each labelled with its source.
  • The scope row carries over 5,000 gross tonnage and over 85% of global shipping emissions.
  • My verification row names the recognized scheme and the date of its certificate. That is because that is the row a lender and a flag State both ask for.

What this means for you: I date every line, because a rule that is approved. In addition, pending still has to be evidenced on the day a lender asks.

Sources

Frequently asked questions

It measures the annual greenhouse gas fuel intensity of the ship, expressed in grams of CO2 equivalent per megajoule, calculated across the whole life of the fuel from well to wake and covering carbon dioxide, methane and nitrous oxide. The number belongs to the ship and to the year, so it moves when the fuel mix on board moves, and the published design compares it with a target set for each year up to 2035 (IMO, FAQ; Global Maritime Forum).

Oceangoing ships over 5,000 gross tonnage, which produce over 85% of global shipping emissions. Ships below that threshold are not covered at present, and a discussion is under way on whether to include ships from 400 to 5,000 gross tonnage. The European measure applies the same 5,000 gross tonnage threshold to ships calling at European ports, whatever their flag (IMO, FAQ; European Commission).

It balances the deficit in three ways: it transfers surplus units from other ships, it uses surplus units already banked, or it acquires remedial units through a contribution to the IMO Net-Zero Fund. The position is then reported in the digital IMO GFI Registry, which records banked units, remedial units, intensity calculations, transfers and cancellations (IMO, FAQ).

No. The regulations were approved by the Marine Environment Protection Committee at its 83rd session from 7 to 11 April 2025, the session of 14 to 17 October 2025 adjourned the adoption decision for one year, and entry into force would come 16 months after adoption (IMO, FAQ).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are at concept stage and need the compliance side modelled before you fix a fuel volume. I run that work through my EU compliance and carbon intensity service, where I map the intensity figure, the certification route and the unit record onto your project schedule.

I do not provide investment advice or arrange investments. Also, I act as a strategic advisor and facilitator.nd facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial. In addition, financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles