Green Ammonia Uses: Four Doors and What Each One Signs

10 min read  ·  Dec 2, 2025  ·  By Alex

green ammonia uses

One molecule sits at the end of four doors, and only some of them sign a contract today. I mean ammonia made with renewable hydrogen, which is what I call green ammonia, and its four exits are fertiliser and industrial feedstock, power generation, shipping, and hydrogen transport where the molecule carries hydrogen to a second site. Green ammonia uses therefore split between volume that already exists, pilots being built, an order book still forming, and a trip that moves hydrogen somewhere else. The door you choose decides the contract you can sign and the plant you should design, and the parent page I keep beside it is the green ammonia guide.

In what follows I order four doors: the buyer that exists today, the buyer who pays for the claim, the buyer who signs for power, the buyer still building ships, and the order I use to rank them. Each door buys a different instrument, so the ranking matters more than the chemistry.

In short

  • Fertiliser: the volume already exists and the price is indexed to gas (2024).
  • Claim: a scope 3 target pays 1 to 3 percent more for up to 30 percent fewer emissions (2025).
  • Power: co-firing pilots are being built in Asia next to coal plants (2024).
  • Shipping: an order book of newbuild vessels rather than a market of cargo contracts (2024).
  • Contract: I rank the doors by what a lender can underwrite today.
Facebook
Twitter
LinkedIn

In this article

Four doors, one molecule

Green ammonia is ammonia made with renewable hydrogen. Fertiliser is the nitrogen product spread on fields, urea is the solid fertiliser made from ammonia, co-firing means burning ammonia alongside coal, marine fuel is the shipping use, and a hydrogen carrier is ammonia moved to release hydrogen somewhere else. An offtaker is the party bound to buy, take-or-pay makes the buyer pay for contracted volume, scope 3 covers emissions inside a company’s value chain, book-and-claim lets a claim travel without moving the molecule, a guarantee of origin records how the molecule was made, and the ladder approach sells into small near-term pockets first. More than half of all food grown relies on ammonia fertilisers made in more than 60 countries, and 40 to 50 percent of the world’s population depends directly on manufactured nitrogen fertiliser at about 20 kg per person (2025).

What this means for you: I fix this vocabulary before I fix the plant, because each term in that list points at a different buyer and a different contract.

The door that already has volume

Fertiliser is where the molecule is bought today, and I read it through the BloombergNEF and Climate Technology Coalition white paper of January 2024. Ammonia demand was 187 million tonnes in 2021, with 77 percent going to fertilisers and 23 percent to industrial uses, and 54 percent of all fertilisers are made with ammonia. The market is worth 76 billion USD, more than 75 percent of ammonia produced goes into fertilisers, and production and use account for 2 percent of the world’s carbon dioxide emissions (2021). The sector consumes 33 million tonnes of hydrogen a year out of 94 million tonnes of global hydrogen demand (2021). This door pays a price indexed to natural gas through the Tampa benchmark (2024), so a green supplier enters a market built on a fossil reference.

What this means for you: I enter this door only with volume already contracted, because the reference price is set by gas rather than by renewable power.

The door that pays for the claim

This is the buyer with a scope 3 target rather than a volume habit, and I read it through the Hydrogen Council and McKinsey roadmap of November 2025. Nearly half of the 20 largest fast-moving consumer goods companies, with 850 billion USD of annual food and beverage revenue, have set scope 3 targets (2025). Switching to low-emission ammonia raises the end product cost by 1 to 3 percent while cutting product emissions by up to 30 percent, against organic premiums of 20 to 40 percent (2025). Pooling such buyers reduces counterparty risk, creates bankable offtake volumes and moves a producer from FEED, meaning front end engineering design, to final investment decision, and certification systems and book-and-claim let the claim travel through a global supply chain. In one modelled case, imports from India close around 600 USD a tonne as the low end (2025).

What this means for you: I treat this door as a premium I must document rather than a price I can assume, because the buyer pays only when the claim survives a check.

The door that is still building ships

Shipping is an order book rather than a market, and I follow it through the work on sustainable maritime fuels and what makes a marine fuel bankable. One net zero scenario puts ammonia consumption by shipping at 178 million tonnes a year in 2050 (2024), and dozens of maritime freight companies are piloting low-carbon fuel or ordering vessels able to run on ammonia (2024). That volume arrives through newbuild decisions and bunker infrastructure rather than today’s cargo contracts. Ammonia is a hazardous substance with deadly accidents on record, and wider use in new sectors will raise safety and security challenges (2024). Japan and South Korea promote ammonia co-firing with coal, Singapore allows hydrogen up to 50 percent of projected electricity demand in 2050, and one operator there is building a 600 MW hydrogen-ready plant while examining a 60 MW ammonia-fuelled one (2024).

What this means for you: I price this door as an option on future vessels and I keep its volume out of my plant design for now.

Where the volume sits in this region

I read the regional picture through the December 2025 Southeast Asia briefing, and the detail sits on the Southeast Asia and Singapore market page. Regional hydrogen demand reached 4 Mt in 2024, with ammonia at 49 percent against refining at 31 percent and methanol at 20 percent. Indonesia takes 35 percent, Malaysia 22 percent, Viet Nam 15 percent and Singapore 12 percent of that 2024 demand. Only Indonesia and Malaysia export, with Malaysia at 73 percent of regional exports and the region at 17 percent of world ammonia exports in 2023. Announced regional projects equal 12 percent of current demand while only 6 percent of announced capacity has reached final investment decision (2025). Nearly 11 Mtpa of potential sits below 6 USD/kg by 2030, mostly in Indonesia, and no certification scheme is yet in place, with work under way in three countries (2025).

What this means for you: I read this region as a supply base with an unfinished claim system, so certification comes before offtake.

What I will count as demand

I set the bar with the Global Hydrogen Review 2026 and I apply it through the page on offtake agreements. Global hydrogen demand passed 100 Mt in 2025, low-carbon production grew 20 percent that year to almost 1 Mt and should pass 1 percent of global production for the first time in 2026, with about 80 percent of high-availability production aimed at chemicals, refining and low-carbon fuels. After that I apply three tests. An announcement is not an order: 45 of 185 tracked projects hold offtake agreements (January 2024) and less than 2 Mtpa of firm offtake agreements exist, about 5 percent of potential 2030 output (2025). A signed agreement is not a firm contract, with 90 percent of traded ammonia still on one to three year contracts (2024). A final investment decision is not a delivery, since 1.3 Mtpa was online in May 2025 out of 15 Mtpa at final investment decision.

What this means for you: I count demand only when a buyer is bound to a volume and a price, and everything else stays in my pipeline column.

How I turn a use into a contract

The ladder approach sells into small near-term pockets first, starting with mining explosives and gas power generation before fertilisers and shipping (2024); the regional sequencing sits on the Southeast Asia offtake page. A take-or-pay volume at a fixed price is what a lender can underwrite while the market stays immature, and buyers used to a gas-indexed price rarely commit beyond a few years (2024). A green price can be two to three times grey ammonia (2024), and a coalition of buyers can signal purchase interest early and reduce the counterparty risk of a single offtaker (2024).

  • The contract I ask for first: take-or-pay volume at a fixed price for one to three years, with the ladder sequence written into the delivery schedule (2024).
  • The claim I refuse to sell before certification: book-and-claim and guarantee of origin only once a scheme can prove how the molecule was made.

What this means for you: I take the small pocket first and the big claim second, because a lender underwrites volume before he underwrites a claim.

The four lines I would put in front of a buyer

I start from the 2025 review’s five key questions and I write four lines:

  • Line one: less than 2 Mtpa of firm offtake agreements exist cumulatively, about 5 percent of potential 2030 output, with only 9 percent of announced projects worldwide having secured committed investment against 0.5 percent in emerging economies (2025).
  • Line two: the electrolyser stack is only 15 to 20 percent of installed investment, so the price I quote must cover works, balance of plant and connection (2025).
  • Line three: China holds close to 60 percent of global electrolyser manufacturing capacity and renewable hydrogen there is 40 to 45 percent cheaper than in Europe or the United States (2025).
  • Line four: cost of capital can reach 15 percent in emerging economies, three times the level of advanced economies (2025).

What this means for you: I show the buyer where the money goes before I argue about the price, because the price has to cover works, connection and balance of plant as well as the stack.

Sources

Frequently asked questions

Fertilisers first. Ammonia demand was 187 million tonnes in 2021, with 77 percent going to fertilisers and 23 percent to industrial uses, while 54 percent of all fertilisers are made from ammonia and more than 75 percent of ammonia production goes into fertilisers (2024). Only 10 percent of ammonia supply is traded internationally as it is, plus 16 percent in the form of urea (2024).

The buyer who needs the claim. Switching to low-emission ammonia raises the finished product cost by 1 to 3 percent while cutting product emissions by up to 30 percent, which a scope 3 target can justify, against organic premiums of 20 to 40 percent (2025). Pooling several such buyers also reduces the counterparty risk that a single producer carries (2025).

It is an order book rather than a market today. One net zero scenario puts shipping consumption at 178 million tonnes a year only in 2050, while vessels and bunkering infrastructure are still being ordered (2024). Ammonia is a hazardous substance with deadly accidents on record, so the safety work has to come first (2024).

I start with the buyer whose volume exists and whose contract I can underwrite, then move to the buyer paying for the claim, using take-or-pay volume and a price the lender can model (2024). The order of doors matters more than the size of the plant at this stage.

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you are fixing a plant design before you know which door you will sell through, the strategic partnership work I do puts the buyer, the instrument and the certification path into one conversation before the front end engineering design is frozen.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia