We Connect Asia

ClimateTech

Climate Tech Series B and Growth Capital

10 min read  ·  Apr 2, 2026  ·  By Alex

climate tech series b growth capital

The question changes once the product works: it is no longer whether the technology works, but whether the company can build it and sell it again and again, so the round gets bigger, the crowd of investors gets thinner, and the money has to bridge to an asset that debt can take over. That is the handover I prepare founders for as they move from demonstration work into financed assets. A climate tech Series B is the round where a working product becomes a repeatable business, and the last stretch of equity before a balance sheet has to carry a plant.

I take the article in order: what changes inside the round, who is still investing, what the money has to buy, how to raise growth capital without losing control, how to size the runway and hand the project over, what Southeast Asia adds, how equity opens the door to project finance, and the checklist I use before documents go out. Each section closes with the consequence for your round.

In short

  • Crowd: half as many investors act beyond Series B today as in 2021.
  • Size: in 2024, 68 percent of climate tech companies needed at least $10M for 18 months.
  • Proof: manufacturing readiness and a signed buyer replace the pilot.
  • Region: in Southeast Asia early rounds before Series B were 85 percent of deal volume in 2024.
  • Exit ramp: the round must end on an asset that debt can finance.
Facebook
Twitter
LinkedIn

In this article

What changes at Series B

A Series B is the round after the Series A, taken once the product works and the company has to prove it can build and sell at scale. Growth equity is money invested in a business that already earns revenue and needs capital to expand rather than to survive. Three neighbours sit close to it: an extension round is a raise made between major rounds; a down round is a raise priced below the previous one, where valuation is the agreed worth of the company used to price its shares; and a bridge is short-term money that carries the company to the next milestone instead of paying for that milestone.

Manufacturing readiness means the design is frozen, the supply chain is qualified, and a line can turn out units at a planned rate. A demonstration is an early run of the process below full scale, a pilot is the first small production run, and a first-of-a-kind plant is the first commercial-scale facility built to that design. Non-recourse debt is borrowing repaid only from the cash the asset itself generates, so the lender underwrites the asset rather than the shareholders.

Every document you bring is read as evidence of repeatability: a qualified bill of materials, an auditable factory, orders that renew, a cost curve that moves with volume. The technology is assumed; execution is what gets priced.

What this means for you: build the round as an execution case rather than a science story, and name the plant, the buyer and the debt that the round has to reach.

The crowd gets thinner

Past Series A the room empties. In 2025 there are half as many investors actively participating beyond Series B compared to 2021, while nearly the same number are active at the seed stage, and that is what the Silicon Valley Bank Future of Climate Tech report published in April 2025 records. Seed deals accounted for over half of all climate tech investment in 2024, up from just one-fifth in 2010. The share of extension rounds increased 11 percentage points to 33 percent between 2021 and 2024. Median valuations have rebounded from 2023 lows with the greatest gains seen at the late stage, and Series B and Series C and beyond rounds are getting larger, even surpassing 2022 levels.

A thinner crowd does not mean smaller cheques. It means fewer writers of cheques at all, a longer process, and a higher bar before anyone moves, so the field of investors in the regional ecosystem narrows as the round grows. Extensions become the common way to bridge a slipped milestone, and the cost of that time shows up at the next round.

What this means for you: start earlier than feels comfortable, treat the first serious proposal as the likely one, and read an extension as a scheduling decision rather than a verdict.

What the money has to buy

In 2025 growth equity investors took 13.2 percent of climate tech deals and strategics took 13.8 percent, and capital shifted from climate ambition to commercial performance: winning technologies meet real demand, demonstrate manufacturing readiness, secure offtake and align with market signals. An offtake is a contract in which a buyer agrees to purchase a stated volume of what the plant will produce. A strategic investor is a corporation investing for industrial reasons as well as financial ones, and at technology readiness levels 7 to 8 in 2025 it is described as pivotal, playing an integral role in validating and commercializing technologies through venture investments, mergers and acquisitions, and offtakes.

In 2025 mitigation still captures over 70 percent of climate tech funding, while battery, solar (up 29.7 percent year on year) and grid technologies (up 48.8 percent) together take 55 percent of funding share. Corporate investors are most active at the later stages where start-ups scale (Series A, Series B, growth equity) and their technologies are close to market deployment, and on average each year since 2016, 34 percent of start-ups received corporate investment representing 28 percent of investment dollars.

Project finance is lending repaid from the contracts and cash flow of one asset, so the evidence assembled here is the same evidence infrastructure project finance will test later.

What this means for you: arrive with the signed buyer, the manufacturing plan and the price signal, because at this stage the round is paid for commercial evidence rather than for climate intent.

Growth capital without losing the wheel

In 2025 total United States venture capital investment in climate tech reached US$29 billion, the third-highest year on record behind 2021 and 2022, led by investments in clean energy, according to the First Citizens Bank and Silicon Valley Bank Future of Climate Tech report published in April 2026. Capital was concentrated: 10 late-stage deals captured 28 percent of all investment. A record 52 percent of venture-backed climate tech companies reduced their net burn year on year as gross margins improved. Over 50 federal actions since 2024 have raised headwinds through pullbacks in funding, research, permitting and staffing.

Fewer, larger cheques land later in the life of the company, and that changes control: each new investor wants more information, more consent rights and a longer relationship. A corporate venture arm, the investment unit of an established company, can bring customers and factories, but it also brings its own timetable. That is why I keep the project finance workstream visible during the raise: it prices assets, not preference shares.

What this means for you: weigh every cheque in control as well as in dilution, and write the consent list you are willing to accept into your own plan before anyone else writes it.

Runway, size and handover

In 2024, 68 percent of climate tech companies needed at least $10M to operate for 18 additional months, and nearly 37 percent of companies projected to run out of cash in the next six months needed to raise more than $20M to operate for an additional 18 months, a level that aligns with the typical raise for companies Series B and beyond. At the end of 2024, 57 percent of climate tech companies needed to raise or reduce net burn in the next 12 months or face illiquidity, seven percentage points higher than the overall tech ecosystem. Hardware companies saw growth rates fall from a median of 58 percent at the end of 2021 to just 19 percent by the end of 2023.

A development finance institution is a public or quasi-public lender that funds infrastructure and industrial projects alongside commercial money, and blended capital is a structure mixing grants, patient money and commercial money so each layer carries the risk it can handle. The round should end where development finance institution funding can attach to a named asset.

What this means for you: size the round from the cash you need to reach operating proof, so the next instrument is debt secured on an asset instead of another equity cheque.

What Southeast Asia adds

In the region the ladder is short at the top. The Southeast Asia venture climate report from Openspace published in June 2024 records that early-stage rounds prior to Series B consistently comprise an average of 85 percent of climate tech equity deal volume, and that fewer than 15 percent of regional climate funds had raised more than US$100 million as at end-2023. Almost 30 climate-specific funds dedicated to Southeast Asia have emerged since 2020, raising over US$830 million in committed capital. Generalist venture capital funds, which invest across sectors rather than in one theme, participated in over 80 percent of the region’s climate tech equity deals in 2023 by deal count.

The share of climate tech deals in all venture funding in the region expanded from 3.2 percent in 2019 to 9.5 percent in 2023, with deal volume growing at a compound annual growth rate of over 15 percent from 2019 to 2023. Singapore and Indonesia accounted for over 90 percent of total climate deal value over the first 11 months of 2023.

So the regional Series B is asked to show bankability, the quality that makes a lender willing to lend against the asset, because the local pool above that size is thin.

What this means for you: plan the round around the few deep pools available, expect generalists at the table, and treat the plant location as part of the financing case.

From Series B to project finance

The handover needs three things: field operating data across several periods, a signed buyer, and a financial model that a lender will test line by line. In 2025 there were 56 active United States venture-backed climate tech unicorns with a total last known valuation of $128B, and 64 percent had not reported a valuation since 2022. Between mid 2023 and early 2024 the share of transactions done by financial buyers jumped from 15 percent to 40 percent, and since then it has fallen to about 20 percent of deals. In 2025 growth equity investors took 13.2 percent of deals.

Two conversations run in parallel, and they start on different days. The equity conversation starts first, while technology risk is still being retired by the company itself; the debt conversation starts as soon as the field data, the signed buyer and the testable model exist, which in practice means opening it during the raise rather than after it. Lenders look at contracts and cash flow, equity investors look at growth and options, and one evidence folder serves both.

What this means for you: open the lender conversation while the equity round is still live, because the documents they ask for are the documents your investors ask for anyway.

Your checklist for this round

The bar moved in 2025: nearly 50 percent fewer companies reached Seed to Series A and 80 percent fewer made it from Series A to Series B compared to 2022, despite needing six extra months to progress, as the Net Zero Insights State of Climate Tech 2025 report records. In 2025 investor activity by type put venture investors at 34.1 percent, governments at 19.5 percent and banks at 2.9 percent of deals, capital shifted from climate ambition to commercial performance, and AI powered one in four climate equity investment dollars.

A data room is the set of documents you open for other people to check. Before you open yours, answer four questions:

  • What does the plant cost to build to the design you claim, and what does the line produce at a planned rate?
  • Which buyer has signed, for what volume, and for how long?
  • What is the cash need to reach that operating proof, and what does it leave behind as an asset?
  • Which asset will the debt sit on, and who can lend against it?

What this means for you: if any of the four answers is soft, fix it before the round opens, because a climate tech Series B is judged mostly on those four lines.

Sources

Frequently asked questions

Size it from cash need to the next instrument. In 2024, 68 percent of climate tech companies needed at least $10M to operate for 18 additional months, and nearly 37 percent of companies projected to run out of cash within six months needed more than $20M for an additional 18 months, a level that aligns with the typical raise for companies Series B and beyond.

No. An extension round is a raise made between major rounds, and its share increased 11 percentage points to 33 percent between 2021 and 2024, so by 2024 it had become a normal instrument rather than a rare event.

During the equity raise, not after it. In 2024 the pressure sat on cash and on reducing net burn, and in 2025 capital shifted from climate ambition to commercial performance, so the evidence a lender wants and the evidence an investor wants now arrive together.

It depends on what you need beside the money. In 2025 strategics took 13.8 percent of climate tech deals and growth equity investors 13.2 percent, and on average each year since 2016, 34 percent of start-ups received corporate investment representing 28 percent of investment dollars, concentrated at the later stages where technologies approach deployment.

Want the Series B case tested before the first meeting?

A short call is usually enough to see where your project stands.

If you want a read on your round before the first meeting, start with the investor introductions work. Before we speak I read the deck, the cap table, the model and the latest operating data, I ask about the plant, the buyer and the cash need, and I tell you what I think the round is missing.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles