We Connect Asia

ClimateTech

Climate Tech Term Sheet Red Flags: The Economics, Control and Process Terms to Read First

9 min read  ·  Jul 27, 2026  ·  By Alex

climate tech term sheet red flags

A term sheet splits into economic terms, control terms and process terms, and the red flags sit in how the option pool is carved, how the board is shaped and how long the no-shop binds: two of those obligations start the moment you sign. I read every document in front of me against those three groups before I look at any figure on the cover. Here is the climate tech term sheet reading order I use with founders, and the funding picture behind it sits on the climate tech and green tech industry page.

I go in order: the vocabulary first, then the clauses that bind on signature, then the market you are negotiating in, the capital mix behind it and the non-dilutive alternative. I close with the four ways founders sign the wrong document and the four steps I use to read one myself.

In short

  • Three groups: economics, control and process terms.
  • Day one: confidentiality and no-shop bind on signature.
  • Pool: an option pool carved before the investors lands on the founder.
  • Board: the seat count decides who can outvote you.
  • Leverage: non-dilutive money is the alternative to a weak offer.
Facebook
Twitter
LinkedIn

In this article

1. The three groups of terms

A term sheet fixes the terms of an investment before the long legal paperwork begins, and it is normally a non-binding document: on its own it obliges neither side to complete the deal, though a few clauses bind from signature. Everything in it sorts into three groups.

Economic terms decide who gets paid and in what order. Valuation is the price implied for the company in this round. A liquidation preference sets who takes money first on a sale, and whether that holder keeps only that amount or converts into ordinary shares as well. Anti-dilution is a formula that re-prices an earlier holder’s shares if a later round is done at a lower price.

Control terms decide who decides. Board composition is the seat count and who appoints each seat. Protective provisions are the decisions the preferred holders must accept, normally a sale, a new raise and changes to the constitutional documents. Pro rata rights let an existing holder buy its share of a later round so as not to be diluted. A drag-along lets a qualified majority force the minority to follow a sale.

Process terms set the clock. A no-shop is a promise not to talk to other investors for a set period; confidentiality is a promise to keep the discussions and the documents private, in a version that binds both sides. An option pool is the block of shares reserved for employee grants, and whether it is carved before or after the investor’s arithmetic decides who pays for it.

What this means for you: read the three groups before you read the cover page. In 2026 the group that costs a founder the most is rarely the one carrying the biggest number.

2. The terms that bind on day one

Two clauses survive the signature: confidentiality and the no-shop. That is the position taken by the CRV guide to term sheets published in February 2026, which defines a term sheet as a non-binding document that fixes the framework of an investment before the legal documentation, summarizing valuation, ownership, liquidation preferences and governance so both sides align before weeks of due diligence.

In 2026 the same guide groups the terms in three categories, economic, governance and process, where process covers exclusivity, confidentiality and closing conditions. It puts a standard no-shop at 30 days, with 60 days reasonable for a complex deal that needs deeper diligence, and says exclusivity beyond 60 days should raise the question of why the investor needs that long. It also notes in 2026 that instruments without a valuation close in one to two weeks against four to eight weeks for a priced round, and that full fundraising cycles run from six to 18 months depending on stage and traction.

The set of investors I track for a round like this will hold you to the period you signed, not to the period you hoped for.

What this means for you: the clock, not the price, is what you sign first. A no-shop agreed in 2026 removes your alternatives for exactly the weeks you need them, so ask what the diligence actually requires before you agree the length.

3. The clauses where founders lose ground

The Startup Project term sheet template and clause guide published in March 2026 describes a term sheet of 5 to 10 pages that decides for years how the company is governed, how decisions are taken and who is paid and in what order. In 2026 it repeats that only confidentiality and no-shop bind, that the document is not the final agreement, and that investors expect a response rather than silence.

In 2026 it puts typical closing at four to eight weeks after signature and sets a model no-shop running from 30 days to 60 days after signature, naming the binding provisions as no-shop, confidentiality and governing law. On the board it describes a typical Series A of five seats: two designated by common shareholders, one by preferred shareholders and two independents agreed jointly. On the pool it flags an unusually large option pool carved into the pre-money valuation as a red flag, against a pool sized to cover hiring over the following 18 to 24 months.

A founder raising in a low carbon fuels venture round meets the same two lines in every draft in 2026.

What this means for you: the pool timing and the seat count cost more than any single figure on the cover. Five seats fixed in 2026 still control the company for years afterwards, and a pool carved in the wrong place is paid for by you alone.

4. The market you are negotiating in

By the end of 2024, 57 percent of climate tech companies needed to raise or reduce net burn within the next 12 months or face illiquidity, seven percentage points higher than the overall tech ecosystem, against 42 percent at the end of 2022. Net burn is the cash a company consumes each month after what it earns. Those are the figures in the Silicon Valley Bank Future of Climate Tech 2025 report published in April 2025.

The same report shows in 2024 that the share of extension rounds rose 11 percentage points to 33 percent between 2021 and 2024, that seed deals made up over half of all climate tech investment, up from one fifth in 2010, that climate tech hardware companies saw growth rates fall from a median of 58 percent at the end of 2021 to 19 percent at the end of 2023, and that over 65 percent of climate tech funds that closed were smaller than 100 million US dollars. An extension round is further money from the investors already in the company, usually without a fresh price-setting process.

What this means for you: a founder negotiating from a short runway in 2024 reads as a founder who must take what is offered, and the market prices that. When equity is slow, infrastructure project finance, meaning debt raised against the cash flows of a single asset rather than the company as a whole, becomes the conversation worth opening early.

5. What the capital mix now gives you

By investor type in 2025, venture investors took 34.1 percent of deals, governments 19.5 percent, strategic investors 13.8 percent, growth equity investors 13.2 percent and banks 2.9 percent, as set out in the Net Zero Insights State of Climate Tech 2025 report. A strategic investor is a company that invests alongside its own commercial interest, and a growth equity investor backs businesses that already earn revenue and are scaling.

In 2025 nearly 50 percent fewer companies reached Seed to Series A and 80 percent fewer made it from Series A to Series B compared with 2022, despite needing six extra months to progress. Also in 2025, capital shifted from climate ambition to commercial performance, with winning technologies meeting real demand, demonstrating manufacturing readiness and securing an offtake, which is a contract in which a buyer commits in advance to buy future output. Mitigation still captured over 70 percent of climate tech funding in 2025.

What this means for you: governments and strategics are now a visible share of the room in 2025, which changes what a founder can walk away from. If development finance institutions, the public and multilateral lenders that fund projects, are on your list in 2025, one equity offer is no longer your only path.

6. The alternative to a weak offer

In 2024 non-dilutive funding usually takes the form of grants or debt, often concessional, plus incentives and private contributions, as set out in the Climate Capital Stack guide to grants for climate tech. Non-dilutive funding is money that requires no shares in exchange, and concessional debt is lent on terms softer than the market would offer.

In 2024 the guide states that non-dilutive money helps a company that is raising equity by attracting investors, securing better terms and decreasing the amount of equity financing needed, while giving the investor technical validation and risk reduction. It describes that capital as patient and risk-tolerant, often better matched to hardware timelines than equity. It places eligibility across entity type, technology and sector focus, development stage and geography, and it recommends building one integrated funding strategy before pursuing any single programme.

What this means for you: a company with a grant line in 2024 negotiates the term sheet from a different position, because the round is no longer the only route to the next milestone. It also raises bankability, meaning whether a lender can be repaid from the cash flows the project itself generates.

7. The four ways founders sign the wrong document

First, an exclusivity window longer than the diligence actually needs. In 2026 the standard runs at 30 days, with 60 days reasonable for complex diligence, and beyond that the length has to be justified.

Second, an option pool carved before the investors without checking what it covers. In 2026 the pool exists to cover hiring over the following 18 to 24 months, and anything beyond that size lands on existing holders.

Third, a board shape in which the founders can be outvoted. In 2026 a typical Series A board runs on five seats, so who appoints each seat matters more than the total.

Fourth, signing without a lawyer who has negotiated venture rounds. In 2026 the guides stress that the document is hard to withdraw once accepted, and that only confidentiality and no-shop bind from signature.

What this means for you: none of the four is a negotiation you lost. Each one is a right you signed away in 2026 without putting a price on it first.

8. How I read one

I read a term sheet in four steps, and I do them in this order.

  • First, I split the clauses into economics, control and process, and I write the three headings at the top of the page.
  • Second, I mark everything that binds on signature: confidentiality, no-shop and, in 2026 drafts, governing law.
  • Third, I price the pool timing and the seat count against the rest of the document, since those two decide more than the cover figure.
  • Fourth, I take the document to counsel before the deadline rather than after it, because in 2026 the binding parts start at signature and closing typically runs four to eight weeks later.

What this means for you: if you do only one thing with the next draft in 2026, do the second step first. The clauses that bind on the day you sign are the ones you cannot renegotiate later by asking nicely.

Sources

Frequently asked questions

Mostly not. In 2026 the guides treat it as a non-binding document that fixes the framework of an investment before the legal paperwork, with two exceptions: confidentiality and no-shop create obligations from the moment of signature.

In 2026 the guides put closing at four to eight weeks after signature, covering due diligence and the legal drafting. Instruments without a valuation close faster in 2026, in one to two weeks.

The timing of the option pool. In 2026 a pool carved before the investors is worked out on the pre-money valuation, so it lands on existing shareholders, and the reference point is a pool sized to cover hiring over the following 18 to 24 months.

In 2026 the guides put the standard no-shop at 30 days, with 60 days reasonable for a complex diligence, while more than that deserves an explanation from the investor.

Want your term sheet read clause by clause before you sign?

A short call is usually enough to see where your project stands.

I read a founder’s term sheet with them, clause by clause, before the first meeting with any investor, so the binding parts are marked before anyone asks for a signature. If you want that read on your next draft, start with the way I work on investor introductions.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles