E-Fuels Regulation: What Qualifies a Fuel and Who Decides

10 min read  ·  Sep 16, 2025  ·  By Alex

e fuels regulation

A fuel does not qualify because it looks renewable. A written rule gives it a number, an electricity test and a buyer. In the European Union a synthetic fuel must keep its emissions intensity. This means meane the greenhouse gas per unit of energy delivered, at or below 28.2 gCO2eq per megajoule. This is 70 percent of the 94 gCO2eq per megajoule fossil comparator. Also, the electricity behind it must be proven renewable under the delegated acts, the European rules that fill in the details a directive leaves open. That is the whole gate, and this is the order I apply it in. This starts starte from power-to-liquid and working through e fuels regulation step by step.

I walk through this in four moves, in order. First the definition, then what the directive adds on top, then the electricity rules. Also, the quota instruments, and finally the evidence I ask a project to produce before it spends money on studies.

In short

  • Definition: Emissions intensity at or below 28.2 gCO2eq per megajoule delivered, 70 percent of the 94 gCO2eq per megajoule fossil comparator.
  • Directive: A 2030 renewable target of 42.5 percent plus 2.5 percent indicative, transport choosing between 14.5 percent and 29 percent.
  • Electricity: A zone above 90 percent renewable, below 18 gCO2eq per megajoule with a power purchase agreement, or in surplus renewable hours.
  • Evidence: Matching by calendar month until 31 December 2029, then by hour from 1 January 2030.
  • Buyer: A minimum share in the fuel mix, with no buy-out for a missed volume.
Facebook
Twitter
LinkedIn

In this article

What counts as an e-fuel, and who decides

The definition sits inside the renewable energy framework. Also, the European Hydrogen Observatory page on the Renewable Energy Directive, updated in November 2026, sets out how it works. The framework rests on two delegated acts: one defining when electricity counts as fully renewable for hydrogen and its derivatives, the other setting the life-cycle emissions method. Renewable hydrogen and captured carbon dioxide produce an e-fuel, chemically the same molecule as the fossil one. Emissions intensity is the greenhouse gas per unit of energy delivered. A fuel delivered to the final consumer must stay below 28.2 gCO2eq per megajoule. This is 70 percent of the 94 gCO2eq per megajoule fossil comparator. Two instruments therefore set the gate: the definition of the molecule, and the proof about the electricity.

What this means for you: I test the carbon intensity number and the electricity evidence together, because a project that clears one and fails the other still does not make a fuel that counts.

What the directive adds on top of the definition

The European Hydrogen Observatory Renewable Energy Directive page also shows what the framework adds once the definition exists. The revised directive has been effective since November 2023. Also, it raises the 2030 renewable target to 42.5 percent plus an indicative 2.5 percent. Transport chooses between a 14.5 percent greenhouse gas reduction and a 29 percent renewable share of final energy consumption. Inside that choice sits a sub-mandate, a smaller obligation inside a larger one. It combines 5.5 percent for advanced biofuels and renewable fuels of non-biological origin by 2030. Those are hydrogen and its derivatives from renewable electricity rather than biomass, with a 1 percent RFNBO part inside it. The counting rule rewards those fuels: 1.5 times their energy content for aviation and maritime, twice for other transport. The detail sits in the renewable hydrogen qualification rules.

What this means for you: I read the national measure, not the European text, because the choice between 14.5 percent and 29 percent, and the 1 percent RFNBO part, is what your fuel must satisfy.

What aviation asks of the fuel

Aviation runs on a separate schedule, and the IATA ReFuelEU Aviation Handbook of September 2024 prints it. Minimum shares delivered to Union aerodromes start at 2 percent from 2025, then 6 percent from 2030, 20 percent from 2035, 34 percent from 2040, 42 percent from 2045 and 70 percent from 2050. Inside those totals sits a synthetic sub-share, the part that e-fuels must cover. It averages 1.2 percent across 2030 to 2031. The rate then runs at 5 percent from 2035, 10 percent from 2040 and 35 percent from 2050. Member states had to be able to apply penalties by 31 December 2024. There is no buy-out. A supplier who misses a share still owes it in the next reporting period, on top of that period’s obligation. The ReFuelEU aviation obligations therefore read as a delivery schedule rather than a fee.

What this means for you: I model the synthetic sub-share first, because it is the part only an e-fuel can fill, and a missed share is repaid later instead of bought out.

What the electricity rules decide

The electricity test is a hierarchy, and it decides most projects before a single molecule is synthesised. A bidding zone is the area within which one day-ahead price is set. Also, the first route is simple: grid electricity counts as fully renewable in a bidding zone whose renewable share passed 90 percent in the previous calendar year, or below an emissions intensity of 18 gCO2eq per megajoule with a power purchase agreement, or during an imbalance settlement period when renewables were curtailed. Only when none of those applies do additionality, temporal correlation and geographical correlation apply together, as the Stibbe analysis of the delegated act sets out: the renewable installation must be commissioned no more than 36 months before the electrolyser and must be free of operating or investment aid.

That exemption runs only until 1 January 2038 for installations operating before 1 January 2028. Since 2023 the same conditions apply to producers outside the European Union who export renewable hydrogen into it.

What this means for you: I map the bidding zone first, because one cheap electricity route can remove the 36 month and aid tests from the whole evidence pack.

How a project proves compliance

The electricity test is a hierarchy, and it decides most projects before a single molecule exists. A bidding zone is the area that one day-ahead price covers. Energy held in storage counts if it shares the same connection point and was charged in the matching month. The condition is also met in any hour when the day-ahead price in the bidding zone is 20 EUR per MWh or lower, or below 36 percent of the current carbon price per tonne of CO2. I ask for a matching model before anything else, because it fixes the operating profile years before commissioning. The carbon intensity and compliance work follows that order.

What this means for you: I date the hourly switch into the model from day one, because from 1 January 2030 the plant must follow generation hour by hour unless the price gate opens.

What the carbon market does to the case

The carbon market changes which molecule is worth building. Also, the modelling in the IEA e-fuels report of 2023 shows why. That work studied a scenario with a 10 percent share of e-fuels in aviation and shipping by 2030. Therefore, the figures below are scenario outputs rather than current facts. From the same electricity, Fischer-Tropsch fuels carry a carbon intensity generally 40 percent above methanol and 50 percent above ammonia. Emissions parity with fossil fuel sits at around 130 gCO2 per kWh for Fischer-Tropsch fuels. For ammonia and methanol it sits around 200 gCO2 per kWh. That ranking is a property of the conversion route, so it survives whatever the carbon price does. The EU ETS exposure for aviation then sits on top of that number.

What this means for you: I check the electricity carbon intensity against 130 gCO2 per kWh before choosing Fischer-Tropsch, methanol or ammonia, because that single input decides the margin against fossil fuel.

What has actually been built so far

Announcements are not operating capacity, and the spending record is still small. Capital spending on low-emissions hydrogen reached nearly 7 billion USD in 2025. That is 0.7 percent of global investment in energy supply, as reported in the IEA Global Hydrogen Review 2026. The same review indicates that electrolysis could take around 70 percent of nearly 10 billion USD of investment in 2026. It also notes that industrial hydrogen use and synthetic hydrocarbons are only now reaching first-of-a-kind projects. That is slower than modular transport uses. On the demand side, the European Hydrogen Bank launched a mechanism in July 2025 that collects demand. Also, supply information for renewable and low-carbon hydrogen and its derivatives, including electro-sustainable aviation fuel. Therefore, buyers and suppliers can be matched on published data. Mandates move with that record, and the mandate tracker for low carbon fuels keeps pace with it.

What this means for you: I treat announced capacity as a pipeline line, never as supply, and I look for a published buyer demand signal before I model revenue.

The order I check a project against

Transposition, the process by which a member state writes a directive into national law, was due by May 2025, eighteen months after the framework took effect in November 2023. By May 2026 only 8 of the 27 member states had transposed the hydrogen mandates for both transport and industry, and three more had done the transport part only. In late April 2026 three states were referred to the Court of Justice of the European Union for missing the deadline, alongside 26 infringement procedures. The sequence of checks is unchanged by that delay, and I keep it in every member state.

What this means for you: The definition first. The electricity evidence second. The quota the fuel will be sold into third.

Sources

Frequently asked questions

Two things, and both must hold: an emissions intensity at or below 28.2 gCO2eq per megajoule delivered, which is 70 percent of the 94 gCO2eq per megajoule fossil comparator, and electricity proven renewable under the delegated acts, meaning the rules that decide when power counts as fully renewable (2026).

Three cumulative criteria when none of the simpler pathways applies: new renewable capacity commissioned no more than 36 months before the electrolyser without operating or investment aid, matching by calendar month until 31 December 2029 and by hour from 1 January 2030, and generation in the same bidding zone or an interconnected one (2026).

No: eligibility is the entry ticket, while the buyer comes from the quota that the fuel is sold into, and a supplier who misses a minimum share still owes it in the next reporting period because there is no buy-out (2024).

Nothing good for the schedule: by May 2026 only 8 of the 27 member states had transposed the hydrogen mandates for transport and industry, and in late April 2026 three states were referred to the Court of Justice with 26 infringement procedures already open (2026).

Not sure your project would survive a credit conversation?

A short call is usually enough to see where your project stands.

If you want the carbon intensity number and the electricity evidence checked before you commission studies, I do that work with you through EU compliance and carbon intensity support, in the same order set out above.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.