We Connect Asia

SAF

Green Sukuk for Low Carbon Fuels Projects in Indonesia: The Route Through the Frame

9 min read  ·  Jun 2, 2026  ·  By Alex

green sukuk indonesia low carbon fuels

Raising a green sukuk for a low carbon fuels project in Indonesia means four things. First, you raise against a published frame that names eligible projects. Second, you run a project selection mechanism inside the budget process. Third, you obtain an independent review before issuance. Fourth, you commit to annual allocation and reporting. The route exists for the sovereign and for private issuers. Your plant enters it as an eligible use of proceeds rather than as a new instrument. That is the short answer to how you raise a green sukuk low carbon fuels indonesia transaction. Also, the rest of this piece walks the same path in order. The detail matters because four workstreams sit underneath, and each one is a separate job. The frame, the tagging, the review and the reporting each have an owner and a deadline.

A fuel plant is unusual among green projects. It must satisfy a capital markets framework, a Shariah screening and an emissions narrative at the same time. The Islamic finance route into sustainable aviation fuel gives me the vocabulary for that overlap.

In short

  • Frame: You cannot raise outside a published list of eligible categories, and the list is fixed before you draft anything.
  • Selection: Projects are tagged inside the state budget mechanism, so a selection trail exists for a reviewer to read.
  • Review: An independent second party opinion is published on the issuer’s website before issuance, not after.
  • Structure: wakala, ijara or istisna’a, chosen from the assets you actually hold rather than from habit.
  • Reporting: Annual allocation and impact reporting, verified by an external auditor or third party.
Facebook
Twitter
LinkedIn

In this article

What raising a green sukuk in Indonesia actually takes

Indonesia has been the pioneer in sovereign green sukuk issuance since 2018. Total issuance reached USD 6.9 billion according to the UNDP and Kuwait Finance House study. The sovereign route proves the machinery exists. For a private issuer the same four steps apply: admit the project to a frame, tag it, get the review, publish the report.

The reason the money matters is aviation. ICAO has adopted a collective long-term global aspirational goal for net-zero carbon emissions by 2050. IATA has committed its member airlines to achieve net-zero emissions from operations by 2050. Most of that decarbonisation is assumed to come from sustainable aviation fuels. New aircraft technology, operational improvements and carbon removals support the rest. Dentons names project finance and capital markets solutions as the instruments for SAF plants, airport green infrastructure and low-emission ground operations.

What this means for you: you qualify a project for an existing instrument rather than inventing one. That qualification is a documentation exercise before it is a pricing exercise.

The green frame you have to be admitted to

Green bonds and green sukuk dedicate the proceeds, or an equivalent amount, to finance or re-finance new or existing eligible green projects. Those projects must align with the four core components of the Green Bond Principles. Use of proceeds here means the way the raised money must be spent. Also, it is the binding term of the instrument.

The Green Bond Principles environmental objectives are climate change mitigation, climate change adaptation, natural resource conservation, biodiversity conservation, and pollution prevention and control. Eligible green project categories include renewable energy and energy efficiency.

The regional overlay matters here. The ASEAN Green Bond Standards align with the Green Bond Principles and include green bonds and green sukuk. They explicitly list fossil fuel power generation projects as ineligible.

What this means for you: settle the category question before the structure question. A project that is not on the list cannot be saved by a clever structure later.

The Indonesian machinery behind the label

The Republic of Indonesia Green Bond and Green Sukuk Framework came out in 2017 with nine eligible sectors. It became the SDGs Government Securities Framework in 2021. Indonesia selects projects through a Climate Budget Tagging mechanism established in 2014 with UNDP support and integrated into national budget systems in 2016 and 2018. Climate Budget Tagging, in short, is the Indonesian mechanism that flags eligible spending in the state budget. Also, it is the piece most private issuers underestimate.

The framework received a second party opinion from CICERO and IISD, rated Medium Green for the green aspects and Good for governance. A second party opinion is an independent assessment of a financing framework, published before the deal. The Indonesian green sukuk applies a wakala structure in which the issuer acts as wakeel. Wakala is an agency contract under which one party acts as agent for another.

The first sovereign line came in March 2018: USD 1,250 million at 3.75 percent. It ran 5 years, on a wakala structure listed in Singapore and Nasdaq Dubai. A 30-year green sukuk followed in 2021 and a 10-year tranche in June 2022. The mechanism travels. The Republic of Indonesia green sukuk of 7 November 2023 was a USD 1,000 million 10-year wakala bil istithmar. It carried a 5.6 percent profit rate and listed on the Singapore Exchange and Nasdaq Dubai.

What this means for you: the tagging trail is the asset you build earliest, because it is the only part of the file a reviewer can check without visiting the plant.

Size of the pool and who is buying

Green sukuk issuance reached a record USD 11 billion by the third quarter of 2024. That figure runs from the market’s inception in 2017. The study estimates that green and sustainability sukuk could carry USD 30 billion to USD 50 billion by 2025. Around 55 percent of investors intend to invest in green and sustainability sukuk in coming years.

Malaysia, Indonesia, the UAE and Saudi Arabia raised 83.3 percent of the cumulative total by the first quarter of 2024. The Indonesia government led in 2023 with USD 2.6 billion, 19.3 percent of the total. On the borrower side, Dentons records that lenders and investors increasingly scrutinise aviation exposure through an ESG lens. Dentons adds that borrowers with credible decarbonisation strategies can access green or sustainability-linked products on more favourable terms.

The debt has a companion. My note on low carbon fuels investment sets out the equity and concession capital that sits alongside this instrument, and the two have to be raised against one schedule.

What this means for you: four markets hold the buyer base, and mandate matters more than price. Your documentation has to answer the mandate question before the coupon question.

Demand that justifies the plants

CORSIA operates as a global market-based mechanism requiring airlines to purchase eligible carbon credits to offset growth in emissions above a baseline linked to 2019 levels.

IATA’s net-zero 2050 commitment assumes that the majority of aviation’s decarbonisation will come from SAFs, supported by new aircraft technology, operational improvements and carbon removals. Meeting the commitment requires new technology, accessible sustainable aviation fuels, operational efficiencies and market-based measures, plus a fundamental reshaping of how aviation is financed.

The regulatory side of that demand is tracked in sustainable aviation fuel mandates, which is where the volume obligation actually sits for a buyer.

What this means for you: the fuel case does not rest on sentiment, it rests on a baseline mechanism, an airline commitment and a price link, and all three are in the public record.

What a project sponsor has to produce

The green checklist is short and fixed: eligible projects listed against the Green Bond Principles objectives and the ASEAN exclusions, a second party opinion published before issuance, tracking of proceeds verified by an external auditor or third party, and annual allocation and impact reporting.

The Shariah layer sits on top rather than beside it. Shariah, meaning Islamic law, brings two obligations the green frame does not carry: legal documentation approved by a Shariah board composed of scholars with financial acumen, and a sufficient amount of Shariah-compliant assets to underpin the sukuk structure. A negative screening excludes assets from sectors prohibited by Shariah principles, such as revenues from selling alcohol, gambling, adult entertainment and weapons.

The aviation KPIs to keep auditable are emissions intensity per revenue tonne kilometre, absolute emissions trajectories and SAF uptake percentages. Impact reporting then runs on fuel-efficiency data, SAF usage metrics and emissions-intensity performance.

One caveat the UNDP and Kuwait Finance House study records: a strictly aligned framework assesses only the use of proceeds. It does not assess the environmental credentials of the asset inside the special purpose vehicle. That could let non-green assets such as oil platforms back the sukuk. My note at green bond versus green sukuk sets out where the two labels ask different questions of the same asset.

What this means for you: publish the asset test as well as the proceeds test, because the proceeds test alone is where a reviewer will find you short.

Price, tenor and the rest of the stack

The market calls that price advantage the greenium, the yield an investor gets over a conventional instrument. The study records a 3-year sustainability SRI sukuk issued by the National Mortgage Corporation of Malaysia in 2020 that priced 2 basis points below its non-SRI sukuk. Small, but it is the measured direction of travel.

The barriers the study lists are: absence of a clear taxonomy, lack of standardised regulation, transparency and reporting challenges, greenwashing risks, high costs from external certification and reporting mandates, a lack of qualifying green projects in certain regions, and limited investor awareness of sukuk and sustainability principles.

Execution is familiar ground. Sukuk typically can be traded, listed and rated, are often structured as certificates governed by English law, usually in the form of trust certificates, replicate the financial performance and investment risk of a typical senior unsecured Eurobond, follow similar debt capital market execution processes, settle and clear through international central securities depositories or domestic systems, carry periodic distribution payments similar to coupons, and mostly have bullet redemption payment mechanics.

For the wider sequence I would read how to finance a SAF project, and for the structuring work itself the sukuk structures note for a low carbon fuels plant.

What this means for you: budget for the certification and the reporting as a cost of the ticket, because on this instrument they are not optional line items and they arrive on a fixed calendar.

How I would run this if it were my file

I would start from the eligibility list, not from the instrument: check the project against the nine sectors of the original frame and against the Green Bond Principles objectives before anyone drafts anything. I would use the same project tagging the budget mechanism uses. Therefore, a reviewer can trace the selection trail. I would get the second party opinion before launch rather than after.

I would pick the structure from the assets. Wakala fits a managed portfolio, ijara fits lease assets, istisna’a fits a plant still being built. Latham and Watkins (2015), also more than two years old, records that after the AAOIFI Statement of 2008 the most commonly used sukuk structures became ijara, murabaha and mudaraba-wakala.

I would budget for external certification and reporting as part of the cost of the ticket.

What this means for you: sequence the work as eligibility, tagging, opinion, structure, reporting calendar, and you will know at each gate whether the file is alive before you spend on counsel.

Sources

Frequently asked questions

No. The sovereign pioneered the market from 2018 and was the largest single issuer in 2023 at USD 2.6 billion, 19.3 percent of the total, while the broader market drew on issuers from Malaysia, Indonesia, the UAE and Saudi Arabia, which together raised 83.3 percent of the cumulative total by the first quarter of 2024. The Islamic Development Bank issued its first green sukuk in November 2019 raising EUR 1 billion, oversubscribed 4.5 times, with proceeds fully allocated to 11 green projects. Private issuers use the same frames, the same review and the same reporting.

Projects must sit inside the eligible categories. The original Indonesian frame named nine eligible sectors, while the Green Bond Principles categories include renewable energy and energy efficiency, and the ASEAN Green Bond Standards aligned with those Principles explicitly list fossil fuel power generation projects as ineligible. Your e-methanol, green ammonia, sustainable aviation fuel or bio-methane plant therefore qualifies through the category you can evidence, not through the label you put on the cover.

The green frame governs how money is chosen, tracked and reported; the Shariah board governs whether the instrument can exist at all. It approves the legal documentation and confirms that enough Shariah-compliant assets are available to underpin the structure, while a negative screening excludes sectors such as alcohol, gambling, adult entertainment and weapons. It also requires that the business and assets align with the objectives of Shariah, safeguarding human life, faith, intellect, posterity, and property and wealth.

It covers both ends. Before issuance a second party opinion on the framework is published on the issuer’s website, and after issuance an external auditor or third party verifies the internal tracking of proceeds, with annual allocation and impact reporting to investors.

Want the green sukuk route mapped against your own project?

A short call is usually enough to see where your project stands.

If you want a second pair of eyes on whether your project clears the frame before you commit counsel fees, investor introductions is where I would start the conversation.

I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.

Alex, Founder of WeConnect Asia

Alex, Founder of WeConnect Asia

I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.

More about me·Get in touch

Facebook
Twitter
LinkedIn

Related articles