Home » Wakala, Murabaha, Ijara: Choosing a Sukuk Structure for a Low Carbon Fuels Plant
Wakala, Murabaha, Ijara: Choosing a Sukuk Structure for a Low Carbon Fuels Plant
9 min read · Jun 2, 2026 · By Alex
For a plant that gets built and then operated, I pair construction with operations. Construction runs through an istisna’a (contract to build to order). Operations run through an ijara (lease contract). Where a managed pool of assets rather than a sale carries the instrument, I reach for wakala (agency contract). Specifically, I use murabaha (cost-plus sale contract) to buy equipment on deferred terms. Musharaka (partnership contract) fits when partners contribute capital to a joint enterprise. What you own, what you are building and what the Shariah (Islamic law) board will approve decide it. That is my answer to which sukuk structures low carbon fuels projects should carry at FID (final investment decision), and the wider plan sits in my guide to Islamic finance for SAF.
Sustainable aviation fuel (SAF) sits alongside e-methanol and biomethane on the list of fuels a sponsor is trying to fund now, and the capital markets route is open. Sukuk issuance rose to USD 264.8 billion in 2025, making sukuk the fastest growing segment of Islamic finance. Therefore, I treat this as a routine conversation with international investors.
The routes at a glance
In short
- Build then operate: istisna’a funds construction and ijara takes over on completion, with rentals covering capital cost plus a profit margin.
- Managed pool: wakala fits where the issuer acts as investment agent over a portfolio instead of selling one asset.
- Equipment purchase: murabaha buys a defined asset with spot delivery, deferred payment and full disclosure of cost and profit.
- Joint capital: musharaka is the route when partners genuinely contribute capital and share losses in proportion to their investment.
- Precedent: after the AAOIFI statement of 2008 the market settled on ijara, murabaha and mudaraba (profit-sharing contract) together with wakala.
In this article
The short answer: the structure follows the asset, not the label
Sukuk are the primary capital market instruments in Islamic finance. In addition, they offer fixed income characteristics similar to bonds. Those characteristics rest on shared profits or income streams (ICMA, Islamic Development Bank and LSEG, April 2024).
AAOIFI Shariah Standard No. 17 defines them as certificates of equal value. They represent undivided shares in ownership of tangible assets, usufruct and services. Usufruct is the legal right to use and derive benefit from an asset. The certificates can also sit in assets of particular projects. AAOIFI has specified 14 categories of permissible sukuk. Also, the choice depends on the character of the underlying assets, taxation and regulatory considerations, the targeted investor base and the views of the Shariah scholars who must approve the issuance (Latham and Watkins).
For a plant, the label matters less than the pool behind the certificates.
What this means for you: start from what exists, what is under construction and what the board will sign. Then pick the contract that matches that sequence rather than the one in fashion.
The rules that constrain every choice
The same principles govern every structure I consider. Riba (interest) is prohibited. The enterprise’s profits must therefore determine an investor’s return. That return derives from the commercial risk the investor assumes. Underlying assets must be Shariah-compliant and cannot relate to gambling or the production or sale of alcohol or pork. The rules also prohibit gharar (excessive uncertainty), speculation (maysir) and exploitation of ignorance (jahl). Therefore, price, delivery and subject matter must be settled without induced ambiguity. All rights and obligations must be transparent and clear (Latham and Watkins).
The AAOIFI statement of 2008 ruled out a purchase undertaking at face value. This requires require purchase at net asset value, market value, cash equivalent value or a price agreed at the time of purchase. Afterwards the most used structures became ijara, murabaha and mudaraba-wakala. Meanwhile, musharaka and mudaraba fell out of favour (Latham and Watkins).
None of this alters the economics I still test in my guide to how to finance a SAF project.
What this means for you: the constraints never move. The only live choice is which permitted structure fits the asset and the Shariah board’s view.
Istisna'a plus ijara: the build-then-operate pairing
An istisna’a is a contract for sale whereby one party undertakes to manufacture a specific asset. The manufacture follows agreed specifications and delivery by an agreed time for an agreed price (Norton Rose Fulbright, 2016). That source dates from February 2010, so it is older than two years. The borrower undertakes under it to procure manufacture, delivery and construction of the plant and equipment. A parallel construction contract passes through its terms. As a result, the Islamic financiers make phased payments akin to draws under a conventional facility.
Some scholars permit a forward lease, ijara mawsufah fi al thimma. Under that lease, the borrower pays advance rentals during the istisna’a. Those rentals cover the financier’s funding costs plus a profit margin. Consequently, the borrower must reimburse those rentals if the lease never materialises.
Your completion and performance gates are read at exactly this point in my route from development to FID.
What this means for you: fund construction against draws and move to rentals only once the plant hands over, because that is where the lease contract starts.
Wakala and wakala-bil-istithmar: the agency route
Wakala is an investment agency contract in which the issuer of the sukuk is the investment agent, the subscribers are the principals and the realised funds are the entrusted capital of the investment. Certificate holders own the assets represented by the certificates, with their benefits and risks. Therefore, the certificates entitle holders to the profits, if any (ICMA, Islamic Development Bank and LSEG). It suits a portfolio to manage rather than a single asset to sell, and it can be asset-based or asset-backed.
The precedents run through it. The Republic of Indonesia issued a green sukuk on 1 March 2018. It raised USD 1,250 million at 3.75 percent over 5 years. The issue used a wakala structure listed on the Singapore Exchange and Nasdaq Dubai. Meanwhile, the Islamic Development Bank’s first green sukuk in November 2019 raised EUR 1 billion on a wakala agreement. Demand reached 4.5 times the issue, and 11 green projects received the proceeds (UNDP and Kuwait Finance House, 2024).
For a fuel project holding a portfolio of contracts rather than a title deed, wakala is where I open the discussion, and Indonesia’s green sukuk programme is where I show the client how that documentation reads in practice.
What this means for you: if your revenue sits in contracts rather than a title deed, the agency route matches the economics you hold.
Murabaha and commodity murabaha: buying the equipment, not lending the money
Murabaha is a sale contract with spot delivery, deferred payment and full disclosure of cost and profit on the sale. The issuer holds the assets on trust for the subscribers, who purchase goods for resale at cost plus a profit on deferred payment terms (ICMA, Islamic Development Bank and LSEG). Used alone it produces an asset-based instrument. This is why it suits the acquisition of a defined piece of equipment rather than the financing of a whole build.
Hybrid structures let a commodity murabaha transaction form part of the underlying asset base up to a pre-determined maximum percentage of the total asset value (Latham and Watkins). The precedent is explicit: the Quantum Solar Park green sukuk of RM 1 billion issued in October 2017. It financed three 50 MW solar power plants. It used a murabaha structure on a tawarruq, a commodity purchase and resale arrangement. The tenor ran from 1.5 to 17.5 years with profit rates of 4.81 percent to 6.16 percent. It sat under a 21-year power purchase agreement with Tenaga Nasional (UNDP and Kuwait Finance House, 2024).
Shariah compliance of the package still turns on documentation that is transparent, detailed and settled before execution (Norton Rose Fulbright).
What this means for you: buy a defined piece of equipment this way, and keep the covenant package you accept alongside it inside the same negotiation.
Musharaka and mudaraba: partnership economics and why their popularity fell
Musharaka is a partnership contract where two or more parties contribute capital, assets and labour to a productive enterprise. They share profits by agreed ratio and losses in proportion to each party’s investment. The issuer acts as the managing partner. In addition, both the issuer and the certificate holders contribute capital (ICMA, Islamic Development Bank and LSEG). Mudaraba works on the same profit-sharing logic: the parties contribute capital and labour in pre-agreed profit ratios. Also, it suits financing where the return is tied to a project’s profitability (Latham and Watkins).
These are the closest Islamic analogues to equity-like risk sharing, and they are what a Shariah board tests hardest, because the AAOIFI statement of 2008 removed the face-value buy-back and the mandatory interest-free liquidity facilities that had been smoothing returns.
For a low carbon fuels project a partnership has to show genuine capital contribution and genuine loss exposure rather than a substituted promise to buy at par, and your sponsor equity story is tested in the same breath.
What this means for you: keep the partnership open only where you can absorb loss in proportion to your investment, because that is what a conventional debt structure will not give you.
Asset-based or asset-backed: the question your lender asks anyway
Asset-based sukuk is the most prevalent structure: there is a contractual claim against the sukuk obligor. As a result, the investor takes the primary credit risk of that obligor. Investors hold an undivided beneficial ownership interest with no recourse to the assets. The issuer must pay irrespective of the performance of the underlying portfolio (ICMA, Islamic Development Bank and LSEG).
In aviation-adjacent transactions the same pressure shows up in title transfer mechanics, true sale and beneficial ownership questions. In addition, the Cape Town Convention of 2001 on International Interests in Mobile Equipment applies here. It covers cases where mobile assets are involved (Dentons, 30 June 2026). For a plant the equivalent questions are who holds title during construction, when it passes and what happens on termination, which is what the purchase and sale undertakings and the service agency agreement are for (Norton Rose Fulbright).
Whether you carry that risk or hand it across is a decision taken with the banks that lend against those assets.
What this means for you: settle the recourse question before pricing, because it changes both the certificate mechanics and what the obligor is left owing.
How I would run this if it were my file
I would map the cash flows first: construction costs, commissioning, then operations. The structure has to mirror that sequence, or the Shariah board will rebuild it for me (Norton Rose Fulbright). I would then check the asset pool against the arithmetic the market applies. The pool must show equal value to the principal raised. Where the structure is hybrid, tangible assets must reach 51 percent (ICMA, Islamic Development Bank and LSEG).
Put the terms in writing
I would write the purchase, sale and agency undertakings before I negotiate price. In fact, those clauses decide what happens on early termination, on prepayment and on default (Norton Rose Fulbright). I would keep the profit mechanism transparent. That means a murabaha discloses its cost and profit. It also means rentals covering capital cost plus a margin on an ijara. On a wakala, distributions track real income (ICMA, Islamic Development Bank and LSEG; Latham and Watkins). I would avoid any promise to buy back at face value, which the AAOIFI statement of 2008 ruled out. I would price the buy-back at net asset value instead. Market value or a value agreed at the time of purchase also works (Latham and Watkins).
And I would keep the partnership option open where the sponsor genuinely contributes capital. Loss sharing in proportion to investment is the one thing a conventional debt structure cannot deliver.
What this means for you: sequence the contracts, verify the asset arithmetic, document the undertakings early and keep musharaka alive only where real loss exposure exists.
Sources
- Dentons, 30 June 2026.
- ICMA, Islamic Development Bank and LSEG, April 2024.
- UNDP IICPSD and Kuwait Finance House, 2024.
- Norton Rose Fulbright, 22 September 2016 (republished article originally published February 2010, older than two years).
- Latham and Watkins, 2015 (older than two years).
Frequently asked questions
Which structure works if my plant does not exist yet?
An istisna’a contract for the manufacturing or construction of assets covers that phase: subscribers fund the cost of the asset and the certificates represent ownership of the asset manufactured, so the sukuk is project-backed. The operations phase then moves onto an ijara contract taking effect on project completion (ICMA, Islamic Development Bank and LSEG; Norton Rose Fulbright).
Can one sukuk use more than one contract?
Yes. Hybrid sukuk combine several contracts because of the lifecycle of the underlying project or the use of several underlying assets, a common combination being istisna’a and ijara, where the asset is constructed for a period and then leased for the remaining term until maturity. Hybrid structures can be asset-based or asset-backed (ICMA, Islamic Development Bank and LSEG).
What happens to title and risk during construction?
Title to the relevant assets typically passes to the Islamic financiers automatically upon transfer of title under the EPC or construction contract. The borrower performs maintenance and insurance obligations under a service agency agreement, enforcement against the assets is governed by an intercreditor agreement with any conventional financiers, and the ijara takes effect on completion (Norton Rose Fulbright).
Why did musharaka and mudaraba sukuk fall out of favour?
Because of the AAOIFI statement of 2008. It held that a purchase undertaking requiring the originator to buy back assets at face value was not permissible under Shariah, and that the undertaking must be based on net asset value, market value, cash equivalent value or a price agreed at the time of purchase. That restricted the smoothing mechanisms those structures relied on and shifted the market towards ijara, murabaha and mudaraba-wakala (Latham and Watkins).
Want a sukuk structure tested against your cash flows?
A short call is usually enough to see where your project stands.
If you are at FID or closing and want to test which of these structures fits your cash flows, I run that comparison with you and then introduce you to the investors and Islamic finance institutions that buy this paper.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.