Methanol Demand from Shipping: Three Fleet Numbers and One Constraint
10 min read · Nov 2, 2026 · By Alex
The answer has three dated counts. At the start of 2025 there were 50 methanol dual-fuel vessels on the water and in service. These ships burn methanol alongside a conventional fuel, an orderbook of 350 methanol-capable newbuildings. This means meane ships ordered but not yet delivered, and nearly 700 methanol-ready ships that can be completed for methanol later. Therefore, more than 1,000 vessels classed for methanol will enter service over the next five years. DNV counted 313 methanol vessels cumulatively in 2026 against 663 for LNG. In addition, only two to four new methanol orders in the first half of 2026. That is the shape of methanol demand shipping today, and the fuel behind it has to exist in both forms.
What changes these numbers
Those counts sit in my green methanol writing. In addition, they move with three things: how ships are delivered, how ports license the fuel. In addition, what the fuel costs at the berth. I keep every date attached to its figure. A 2025 fleet count and a 2026 orderbook count are different measurements of different fleets.
In short
- Fleet: 50 dual-fuel vessels in service, 350 on order and nearly 700 methanol-ready at the start of 2025.
- Order pace: two methanol orders in the first half of 2026 counted by DNV. Clarksons counts four, at 0.37% of all newbuild orders by count.
- Deliveries: 59 methanol-fuelled ships delivered in 2025. It reports 38 more in the first half of 2026.
- Price: fossil methanol at about USD 700 per tonne in Asia Pacific in November 2026. E-methanol estimates sit at USD 800 to 1600 per tonne.
- Supply: 400,000 to 500,000 tons of renewable methanol sold in 2024, beside 94 million metric tons of total methanol supply.
In this article
The three numbers
Three counts describe this fleet, and they are not interchangeable. The Methanol Institute records 50 methanol dual-fuel vessels in service at the start of 2025. Most are chemical tankers. Also, the same count puts the orderbook at 350 methanol-capable newbuildings and nearly 700 methanol-ready ships. Taken together that is more than 1,000 vessels classed for methanol will enter service over the next five years. A methanol-ready ship is a hull specified so that methanol machinery can be fitted at a later stage. That is why it can sit in the count without burning a litre of methanol yet. Separately, and on a different basis, DNV counted 313 methanol vessels cumulatively in 2026 against 663 for LNG, which leaves methanol the second-largest alternative-fuel orderbook. One number measures a ship in service, one a ship on order, one a ship made ready. The 2026 DNV figure measures a cumulative orderbook again.
What this means for you: pick one of the three, date it, and write the date in the cell. I use the in-service count for near-term stems and the methanol-ready count only as a ceiling for later years.
Why owners order them
Owners order methanol because the fuel behaves like a liquid they already handle. It is a liquid at ambient temperature and pressure. Therefore, operators store it in conventional tanks. In addition, dual-fuel engines burn it with a small pilot of conventional fuel for ignition. That pilot fuel is the small quantity of diesel or gas oil that lights the main methanol charge. The IRENA shipping report notes that methanol works in engines made by well-known engine manufacturers. That keeps shipyard and engine practice familiar. Also, the IEA observes that aviation and marine sectors rely more on fuel-based solutions than road transport does.
In addition, it assesses an assumed ambitious goal of a 10% share of e-fuels in aviation and shipping by 2030. The installed base is visible already. Maritime Propulsion reports that Everllence cites more than 250 ME-LGIM engine orders with more than 100 in service. Also, that WinGD had 56 X-DF-M engines on order as of March 2025. So the order is a fuel choice inside that orderbook, not a certificate choice.
What this means for you: engine orders are the indicator I track first. A delivered engine becomes a vessel needing a stem within months.
What has to arrive at the berth
A ship that can burn methanol still needs a certified stem in port. Also, a stem is a parcel of fuel that a barge delivers to a vessel for a voyage. In addition, bunkering is the operation of loading that parcel. The port side is taking shape in public. Maritime Propulsion records that Singapore began awarding commercial methanol bunkering licences on 1 January 2026. In October 2026 a methanol dual-fuel vessel bunkered about 5,000 tonnes of certified bioethanol in Singapore. That shows ethanol running as a drop-in for methanol engines. Price is the other half of the berth question.
The same reporting puts e-methanol cost estimates at USD 800 to 1600 per tonne historically. Some 2026 estimates put it at 1600 to 2400 per tonne. Electrolysis needs roughly 9.5 to 10.5 MWh per tonne. In addition, Methanex contract prices for November 2026 were about USD 700 per tonne in Asia Pacific. China paid about USD 625 per tonne and Europe EUR 875 for fossil methanol. The spread is settled where the bunkering stem is priced.
What this means for you: I quote delivered price by port and by month. The comparison is fossil against renewable in the same currency, because that spread decides whether an owner takes the fuel or waits.
Who has signed
The Methanol Institute records that in 2024 the first large methanol-enabled containership entered service. Shipowners also signed landmark methanol offtake agreements for their dual-fuel fleets. Signed paper is the only place a forecast becomes measurable. A.P. Moller – Maersk operates about 20 methanol-capable container ships. It met its target of 19 by 2026. Its supply deals include a 500,000 tonne per year green methanol offtake agreement with Goldwind, whose first stem was expected in 2026, and a long-term bio-methanol agreement with LONGi. Hapag-Lloyd ordered eight 4,500 TEU dual-fuel methanol ships in December 2025 for 2028 to 2029 delivery. On the physical side, Maritime Propulsion reports deliveries of 59 methanol-fuelled ships in 2025. It reports 38 more in the first half of 2026. In addition, Argus notes shipowners as the pull behind announced capacity. So the offtake behind those vessels is what turns an order into demand for my volume.
What this means for you: I count a vessel once a fuel contract exists, because a delivered ship without one is an engine waiting for a supplier.
Where the ordering stopped
Deliveries continued through 2026 while ordering did not. Maritime Propulsion reports that DNV counted two methanol orders in the first half of 2026 . Clarksons counts four, equal to 0.37% of all newbuild orders by count. The reason the article gives is fuel. E-methanol cost estimates run from USD 800 to 1600 per tonne historically and 1600 to 2400 per tonne in some 2026 estimates, against fossil methanol at about USD 700 per tonne in Asia Pacific in November 2026. Also, the signal behind that is regulatory. The 2026 GENA release records that project pipeline growth slowed in November and December 2025. The slowdown followed the decision to adjourn adoption of the IMO Net-Zero Framework in October 2025. Owners were reading the same calendar as project developers.
In addition, the IEA frames the ambition as a 10% share of e-fuels in aviation and shipping by 2030. So the regulatory calendar sets the pressure, and the fuel price sets the timing.
What this means for you: I date every order assumption to the calendar event that caused it. In addition, I re-run the model when that event moves.
What compliance adds to the demand
European rules are the second pull, and they bite the vessel that calls at EU ports. The IEA notes that aviation and marine sectors remain more reliant on fuel-based solutions than road transport. That is why a port call, not a flag alone, drives the obligation. Argus puts Southeast Asia methanol demand at about 4.1 million tonnes in 2024 growing to 4.8 million tonnes by 2028. Regional capacity rises to 10.8 million tonnes from 7.5 million tonnes after the launch of Sarawak, and records biodiesel leading regional methanol demand at 45% of total demand in 2024, which is the chemical demand sitting next to the marine demand.
The Methanol Institute reports total methanol supply in 2024 at 94 million metric tons, with just 400,000 to 500,000 tons of renewable product sold, so the fuel a compliance-exposed vessel must buy is still scarce. So the European obligation is the clause I read before I book a demand number.
What this means for you: I model compliance demand at the berth I control. In addition, I treat regional chemical demand as the competing pull on the same molecules.
What I would ask before signing
I ask four questions in writing, and I ask them in this order. First, which of the three fleet numbers the demand model uses: in service, on order, or methanol-ready, and as of which date. Second, how many of those vessels have a signed fuel contract rather than an intention, because the two look identical in a press release. Third, what the delivered price is in my bunkering port, fossil against renewable, in the same currency and the same month. Fourth, what the regulatory calendar says, because the IMO decision of October 2025 moved the pipeline within two months of the announcement. A file that answers none of these is a list of announcements. In addition, a file that answers all four gives me a volume I can underwrite.
What this means for you: I write the four answers onto the first page of any file I take forward. Therefore, the reader can see which date and which measure produced the number.
How I would model it if it were my file
I keep four dated rows, and every cell carries its source date. The fleet row carries 50 vessels in service, 350 on order and nearly 700 methanol-ready at the start of 2025, next to the DNV count of 313 methanol vessels cumulative in 2026, each cell dated. Therefore, nobody ever sums the two counts. The order row carries two orders in the first half of 2026 by DNV and four by Clarksons at 0.37% of newbuild orders by count, which tells me the pace rather than the stock. Also, the supply row carries 400,000 to 500,000 tons of renewable product sold in 2024 against 45.8 million metric tons of announced potential by 2030, and I label the second figure announced capacity, never available supply. My last row covers contracted volume, because that is the only row a lender will count.
What this means for you: build the first three rows for context and run the file on the fourth, and if the fourth row is empty. The announcement stack above it is not demand.
Sources
- IRENA, 2021.
- IEA, January 2024.
- Argus, 16 May 2025.
- Methanol Institute, 2025.
- Bioenergy International, 26 January 2026.
- Maritime Propulsion, 3 November 2026.
Frequently asked questions
How many ships can run on methanol today?
The Methanol Institute records 50 methanol dual-fuel vessels on the water and in service at the start of 2025, mostly chemical tankers, and Maritime Propulsion reports 59 methanol-fuelled deliveries in 2025 and 38 in the first half of 2026 (Methanol Institute 2025; Maritime Propulsion, 3 November 2026).
How many methanol ships are on order?
An orderbook of 350 methanol-capable newbuildings plus nearly 700 methanol-ready ships at the start of 2025 (Methanol Institute 2025), while DNV counted 313 methanol vessels cumulatively against 663 for LNG in 2026 (Maritime Propulsion, 3 November 2026).
Why have methanol newbuild orders slowed?
Because of fuel price: Maritime Propulsion reports two methanol orders in the first half of 2026 by DNV and four by Clarksons, equal to 0.37% of all newbuild orders by count, with fossil methanol at about USD 700 per tonne in Asia Pacific in November 2026 against e-methanol estimates of USD 800 to 1600 per tonne (Maritime Propulsion, 3 November 2026).
Will shipping demand absorb the planned methanol capacity?
Not on announcements alone: the Methanol Institute expects only 20-40% of announced projects to move forward, still 7 to 14 million metric tons, against just 400,000 to 500,000 tons of renewable product sold in 2024 (Methanol Institute 2025).
Not sure your project would survive a credit conversation?
A short call is usually enough to see where your project stands.
If you are at concept stage and want these counts turned into a dated demand curve for your project, I work through that with you: offtake agreement structuring, counterparty mapping and the delivered price test by port. In addition, I bring the four rows: your port, your delivery year and your renewable share.
I do not provide investment advice or arrange investments. I act as a strategic advisor and facilitator.
Alex, Founder of WeConnect Asia
I help low-carbon fuel and carbon removal project developers in Southeast Asia secure the commercial and financial partners needed to reach FID.
Related articles

Pitching a Climate Tech Company to Strategic Investors: What the Corporate Has to Believe Before It Writes a Cheque
How to pitch a climate tech company to strategic investors: the metric cluster, the readiness evidence and the ask that corporates fund.

Biomethane: What It Is, How It Is Made and Who Buys It
Biomethane is biogas cleaned to pipeline quality. I explain how it is made, how it differs from biogas and who buys it in Southeast Asia.

CO2 Sourcing for e-SAF Projects: What the Rules Allow and What the Contract Must Say
Biogenic CO2, direct air capture or industrial flue gas: which sources an e-SAF plant may use, what they cost and which contract terms make the fuel certifiable.

Operating Performance Guarantees for SAF Plants: What Lenders Ask For
Minimum guarantees, performance damages, retesting and who stands behind them: the operating guarantees a SAF plant needs to keep debt and offtake intact.

EPC and Construction Risk in SAF Plants: What a Lender Actually Tests
FEED scope, convertible EPC, performance guarantees and damages caps: the construction risk questions a SAF project must answer before financial close.

Matching Feedstock and Offtake Risk Back-to-Back in a SAF Project: How Lenders Read the Chain
Lenders do not buy a feedstock plan and an offtake plan separately. They buy the link between the two, and the link is where most SAF files break.